Orosur Mining Announces Notice of Annual General Meeting & Colombia Drilling Update
1
Orosur Mining Announces Notice of Annual General Meeting & Colombia Drilling Update
Montevideo, Uruguay, October 18, 2017. Orosur Mining Inc. (“Orosur” or “the Company”) (TSX/AIM: OMI),
is pleased to announce the arrival of the second diamond drill rig at its wholly-owned, high-grade Anzá gold
project located in the Mid Cauca Gold Belt in Colombia. Additionally, copies of the Notice of Annual General
Meeting (“AGM’) have been sent to shareholders and a copy is also available from the Company’s website.
The AGM will be held on November 17, 2017 at 11: 00 a.m. (Colombia time) at the Offices of Alianza
WJE,Cll 11C # 31-57 El Poblado, Medellin, Colombia.
On October 16, 2017, Logan Drilling delivered the second and final planned diamond drill rig to the Anzá
project, which commenced drilling this morning. Rig #1, which arrived on October 12, 2017 , has drilled a
total of 83m to date.
Preliminary geological reconnaissance of the core indicates geological features similar to previous drilling
and is considered a promising host rock. This tends to coincide with historical drilling in the sector which
yielded high gold grade intersections. Core sampling will be done as soon as the drill hole is finalised and
logged.
Ten drilling platforms completed with access roads have been carefully constructed to minimize
environmental impact and are ready to be drilled in sequence over the coming months. The Company plans
to drill approximately 35m per day per rig and aims to have 4 holes drilled and ready for analysis by the
end of October 2017.
The Company also wishes to notify a correction to its announcement dated October 16, 2017. Drill hole
EMRC17-028 of the Muro deposit in the Santa Teresa – Polvorin area was mistakenly shown to have a
grade of 5.8 g/t Au over 7.0m, however should have shown a grade of 0.7 g/t Au over 7.0m.
Qualified Person
The technical information related to the current assets of Orosur Mining in this announcement has been
reviewed and approved by independent Mining engineer Miguel Fuentealba, a qualified person as defined
by National Instrument 43-101.
About Orosur Mining Inc.
Orosur Mining Inc. (TSX: OMI; AIM: OMI) is a fully integrated gold producer , developer and explor er
focused on identifying and advancing gold projects in South America. The Company operates the only
producing gold mine in Uruguay (San Gregorio), and has assembled an exploration portfolio of high quality
assets in Uruguay, Chile and Colombia.
For further information, please contact:
Orosur Mining Inc
Ignacio Salazar, Chief Executive Officer
Tel: +1 (778) 373-0100
Cantor Fitzgerald Europe – Nomad & Joint Broker
David Porter/Keith Dowsing
Tel: +44 (0) 20 7894 7000
2
Numis Securities Limited – Joint Broker
John Prior / James Black / Paul Gillam
Tel: +44 (0) 20 7260 1000
FTI Consulting
Ben Brewerton / Sara Powell / Emerson Clarke
Tel: +44 (0) 20 3727 1000
The information contained within this announcement is deemed by the Company to constitute inside
information as stipulated under the Market Abuse Regulation ("MAR"). Upon the publication of this
announcement via Regulatory Information Service, this inside information is now considered to be in the
public domain. If you have any queries on this, then please contact Ignacio Salazar, Chief Executive Officer
of the Company (responsible for arranging release of this announcement) on: +1 (778) 373-0100.
Forward Looking Statements
All statements, other than statements of historical fact, contained or incorporated by reference in this news
release, including any information as to the future financial or operating performance of the Company,
constitute "forward-looking statements" within the meaning of certain securities laws, i ncluding the "safe
harbour" provisions of the Securities Act (Ontario) and the United States Private Securities Litigation
Reform Act of 1995 and are based on expectations estimates and projections as of the date of this news
release. There can be no assurance that such statements will prove to be accurate. Such statements are
subject to significant risks and uncertainties, and actual results and future events could differ materially
from those anticipated in such statements. Forward-looking statements include, without limitation success
of exploration activities; permitting time lines; the failure of plant; equipment or processes to operate as
anticipated; accidents; labour disputes; requirements for additional capital title disputes or claims and
limitations on insurance coverage. The Company disclaims any intention or obligation to update or revise
any forward looking statements whether as a result of new information, future events and such forward -
looking statements, except to the extent required by applicable law.