Monday, September 14, 2026
MiningNewsTerminal
Monday, September 14, 2026 Admin

OMI.V ·

New mineralised zones discovered at APTA

Drill Results

New mineralised zones discovered at APTA

• First new hole at APTA (MAP-106) returns 229.7m @ 0.88g/t Au.

• Numerous higher-grade intervals within broader intersection, including:

o 6.85m @ 2.15g/t Au

o 59.2m @ 2.15g/t Au

o 7.65m @ 7.07g/t Au

o 4.7m @ 3.95g/t Au

• Results have substantially enhanced the prospectivity of APTA with three

areas of potential requiring follow up.

London, June 9th, 2026 . Orosur Mining Inc. (“Orosur” or the “ Company”)

(TSXV/AIM:OMI), is pleased to announce an update on the progress of exploration

activities at the Company’s exploration project at Anzá in Colombia (“Anzá” or the

“Project”).

Anzá – Colombia

The Anzá Project in Colombia comprises a number of granted exploration titles and

applications totalling roughly 330km2, within the Mid-Cauca gold belt, west of the city

of Medellín.

These titles and applications are owned by two Colombian companies, Minera Anzá,

and Minera Monte Aguila, both wholly owned subsidiaries of the Company. The latter

of these was acquired by Orosur in November 2024 from the Company’s previous JV

partners, Newmont Mining and Agnico Eagle Mines. Orosur thus owns 100% of the

Anzá Project.

Since acquiring 100% control, the Company has focussed its attention on three

prospects:

• Pepas - a shallow, high -grade deposit of gold mineralisation for which the

Company has calculated a Mineral Resource Estimate (“MRE”), announced

February 10th 2026.

• APTA - a high-grade deposit of gold mineralisation that has to date seen almost

39,000m of historical drilling, and at which drilling has recently recommenced.

• El Cedro - a cluster of gold porphyry intrusions in the south of the Project area

that are currently subject to mapping and sampling programs, with a view to

potentially being drilled in the near term.

Figure 1. Anzá Project

APTA

The APTA prospect in the centre of the Project area has seen almost 39,000m of

drilling by various companies since 2012. This work has identified a substantial

epithermal gold system.

The last phase of drilling was undertaken by the Company’s previous JV partner,

MMA, from late 2020 through early 2022, at which time the abatement of Covid related

operational restrictions allowed MMA field crews to begin to explore the wider Anzá

project area. Results from the final holes of this phase of work were announced on

27th June 2022.

Upon assuming control of the Project in November 2024, the Company focused most

of its resources on exploration at the Pepas prospect, ultimately leading to a MRE

being calculated and announced in February 2026.

However, during this drill -out phase, Company field teams also undertook mapping

and sampling programs at the El Cedro prospect and desktop reassessment of

significant previous drilling undertaken at the APTA prospect.

APTA was the original prospect upon which the Anzá Project was based. Gold

mineralisation was originally discovered underneath a small artisanal gypsum mine,

leading to sporadic drilling through to 2022. Despite many holes intersecting

substantial intervals of very high-grade gold mineralisation, there remained substantial

debate as to the underlying geological model and controls upon mineralisation. As a

result, despite almost 39,000m being drilled, no MRE was ever calculated.

Work by Company geological teams in early 2026, developed new geological concepts

whereby gold mineralisation was thought to be constrained within silicified sediments

and volcaniclastics bound by two large faults roughly 100m apart, that together make

up the Aragon fault zone and acted as conduits for gold bearing fluids.

Hole MAP-106 was collared outside the fault zone to the west and oriented to intersect

the footwall fault, thought to be the main fluid conduit which would then intersect the

mineralised zone at a much shallower depth than previous drilling, eventually targeting

previously defined mineralisation at depth. However, the footwall fault zone presented

substantial drilling challenges resulting in some redrilling and adjustment to the

planned azimuth, with the final hole being referred to as MAP-106A.

Figure 1. Plan of drilling, APTA

The hole intersected gold mineralisation almost immediately upon passing the footwall

fault, at a vertical depth of roughly 70m, with mineralisation continuing for a

considerable distance for a composite intersection of 229.7m @ 0.88g/t Au (Table 1)

Within that broad lower grade intersection there were numerous higher -grade

intersections consistent with and expanding upon previous drilling (Table 2). The

exact controls upon these higher -grade zones are still being assessed but are likely,

as with Pepas, to be related to various phases of silicification and mineralising events

within the volcaniclastic core.

Figure 2. Section, MAP-106A

Hole Number From (m) To (m) Interval

(m) Au (g/t)

MAP106A 189.5 419.2 229.7 0.88

including 212.2 219.05 6.85 2.15

including 291.9 351.1 59.2 2.02

including 316.05 323.7 7.65 7.07

including 346.4 351.1 4.7 3.95

Table 1. Drill intersection MAP106A

Hole Number From (m) To (m) Interval

(m) Au (g/t)

MAP011 213 219 6 18.26

MAP020 145 186 41 3.85

MAP021 224 242 18 14.14

MAP033 157 179 22 10.42

MAP036 198 227 29 3.88

MAP038 172 212 40 14.09

MAP048 181 195 14 40.37

MAP054 41 59 18 2.96

97 110 13 4.36

144 149 5 17.76

MAP055 177 190 14 4.89

MAP060 222 247 25 4.86

MAP062 217 240 23 5

MAP070 221 233 12 5.28

284 298 14 5.02

MAP072 184 255 71 3.53

MAP073 271 293 22 6.02

MAP076 228 240 12 6.02

MAP082 227 256 29 2.5

MAP086 179 183 4 6.12

215 234 19 2.85

MAP089 275 334 59 9.61

MAP090 180 186 6 9.91

MAP091 222 284 62 2.05

Table 2. Previous historical intersections, APTA

The desktop review and the results from MAP-106A have modified the Company’s

thinking of the origins of APTA and substantially increased its prospectivity, with three

areas of potential now requiring follow-up (Figure 3).

Figure 3. APTA follow-up

Firstly, this hole has confirmed and expanded the potential scale of the deeper, higher-

grade mineralisation that was defined by previous drilling (Area A). Previous work has

defined a mineralised zone over 1km in length and up to 100m in width, although

poddy in nature. This hole has greatly assisted in better understanding the controls

upon this mineralisation and future drilling will be planned to expand and then infill this

zone.

Secondly, no shallow drilling has ever been undertaken within the fault bound

mineralised zone, and minimal surface geochemistry has been undertaken as the

zone is hidden by barren transported cover. However, one small, mineralised outcrop

was mapped historically, opening the possibility that gold mineralisation could extend

to near surface (Area B). A program of shallow drilling will be developed to better

understand this shallow, bulk tonnage potential.

Thirdly, a narrow, hanging wall mineralised vein (Area C) had been defined by

previous drilling but never examined as previous work was focused on the thicker

mineralisation at depth. However, this vein seems to show reasonable continuity, as

well as suff icient grade and thickness to potentially be amenable to exploitation.

Additional drilling will be required to expand the scale of this vein system.

Orosur CEO Brad George commented:

“APTA was always tantalising but misunderstood as previous drilling was never pulled

together into a coherent picture. After almost 15 years, this is now being done, and

looking exciting.”

For further information, visit www.orosur.ca, follow on X @orosurm or please contact:

Orosur Mining Inc

Louis Castro, Chairman,

Brad George, CEO

[email protected]

Tel: +1 (778) 373-0100

SP Angel Corporate Finance LLP – Nomad & Joint Broker

Caroline Rowe / Jen Clarke / Devik Mehta

Tel: +44 (0) 20 3470 0470

Turner Pope Investments (TPI) Ltd – Joint Broker

Andy Thacker/Guy McDougall

Tel: +44 (0)20 3657 0050

Flagstaff Communications and Investor Communications

Tim Thompson

Alison Allfrey

Fergus Mellon

[email protected]

Tel: +44 (0)207 129 1474

The information contained within this announcement is deemed by the Company to constitute inside

information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 ('MAR') which has

been incorporated into UK law by the European Union (Withdrawal) Act 2018. Upon the publication of

this announcement via Regulatory Information Service ('RIS'), this inside information is now considered

to be in the public domain.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Drill Hole Details – APTA prospect since 2020 *

Hole ID Easting (m) Northing (m) Elevation asl (m) Dip (°) Azimuth (°)

MAP-072 400088 694745 1075 -55 293

MAP-073 400018 694503 1097 -58 295

MAP-074 399981 694684 1110 -58 295

MAP-075 400168 694723 1024 -55 295

MAP-076 400019 694527 1107 -50 295

MAP-077 400168 694723 1024 -69 295

MAP-078 399917 694719 1112 -50 295

MAP-079 399995 693976 960 -55 295

MAP-080 400231 694580 966 -55 295

MAP-081 400045 693950 920 -55 295

MAP-082 400176 694797 1020 -50 296

MAP-083 400176 694797 1020 -60 310

MAP-084 400045 693950 920 -57 321

MAP-085 400167 694552 1000 -46 247

MAP-086 400067 694360 1068 -54 295

MAP-087 400027 694168 988 -54 290

MAP-088 400168 694723 1024 -55 341

MAP-089 400067 694360 1068 -59 317

MAP-090 400041 694630 1059 -56 296

MAP-091 400060 694715 1089 -50 295

MAP-092 399420 695235 1162 -50 138

MAP-093 400055 694203 1006 -59 290

MAP-094 399954 694347 1031 -64 303

MAP-095 399722 695252 1113 -50 135

MAP-096 399759 694632 1082 -57 127

MAP-097 400054 694472 1087 -71 311

MAP-098 399794 694730 1149 -65 130

MAP-099 399098 695129 1157 -50 250

MAP-100 400096 694431 1051 -59 283

MAP-101 400286 694890 967 -50 331

MAP-102 400095 694426 990 -61.5 303.5

MAP-103 399793 694730 1162 -65.5 123.3

MAP-104 399982 694294 1015 -60 297

MAP-105 399793 694730 1162 -63.8 113.3

MAP-106A 403384 705000 1001 -50 150

*Coordinates WGS84, UTM Zone 18

About Orosur Mining Inc.

Orosur Mining Inc. (TSXV: OMI; AIM: OMI) is a minerals explorer and developer currently operating in Colombia

and Argentina.

Qualified Persons Statement

The information in this news release was compiled, reviewed, verified and approved by Mr. Brad George, BSc

Hons (Geology and Geophysics), MBA, Member of the Australian Institute of Geoscientists (MAIG), CEO of Orosur

Mining Inc. and a qualified person as defined by National Instrument 43-101.

Orosur Mining Inc. staff follow standard operating and quality assurance procedures to ensure that sampling

techniques and sample results meet international reporting standards.

Drill core is split in half over widths that vary between 0.3m and 2m, depending upon the geological domain. One

half is kept on site in the Minera Anzá core storage facility.

Industry standard QAQC protocols are put in place with approximately 10% of total submitted samples being

blanks, repeats or Certified Reference Materials (CRMs).

Samples are sent to Medellin laboratory of Actlabs for preparation and fire assay, with some sample then sent to

the Canadian Actlabs facility for multi element assay

30 gram nominal weight samples are then subject to fire assay and AAS analysis for gold with gravimetric re-

finish for overlimit assays of >5 g/t. ICP-MS Ultra-Trace level multi-element four-acid digest analyses may also

undertaken for such elements as silver, copper, lead and zinc, etc.

Gold intersections are reported using a lower cut-off of 0.1g/t Au over 3m.

Intersections are quoted as downhole thicknesses. True thicknesses are unknown.

Forward Looking Statements

All statements, other than statements of historical fact, contained in this news release constitute “forward looking

statements” within the meaning of applicable securities laws, including but not limited to the “safe harbour”

provisions of the United Stat es Private Securities Litigation Reform Act of 1995 and are based on expectations

estimates and projections as of the date of this news release.

Forward-looking statements include, without limitation, the continuing focus on the Pepas prospect, the exploration

plans in Colombia and the funding of those plans, and other events or conditions that may occur in the future.

There can be no assurance that such statements will prove to be accurate. Actual results and future events could

differ materially from those anticipated in such forward -looking statements. Such statements are subject to

significant risks and uncertainties including, but not limited to, those described in the Section “Risks Factors” of the