Omai Gold Drills 17.36 g/t Au over 7.5m (capped), 2.64 g/t Au over 41.8m and 3.49 g/t Au over 17.4m in Resource Expansion Program at Wenot

Drill Results

Omai Gold Drills 17.36 g/t Au over 7.5m

(capped), 2.64 g/t Au over 41.8m and 3.49 g/t

Au over 17.4m in Resource Expansion

Program at Wenot

Toronto, Ontario--(Newsfile Corp. - July 29, 2025) -

Omai Gold Mines Corp.

(TSXV: OMG) (OTCQB:

OMGGF)

("

Omai Gold

" or the "

Company

") is pleased to announce additional results from its ongoing

2025 drill program, focused on expanding the large Wenot deposit at the Company's 100%-owned

Omai Gold Project in Guyana, South America. Assays are reported for 6 holes totaling 3,760 m drilled

(Table 1). A total of 37 holes have been drilled to date this year, totalling 20,500m, having surpassed the

original planned 15,000m program. Drilling continues to extend the known limits of gold mineralization at

Wenot (Figure 1). Results are pending for an additional 8 holes.

The long hole 25ODD-122, drilling

across the Gilt Creek deposit, continues and is expected to test approximately 600m below the adjacent

Wenot deposit.

Highlights include:

Hole 25ODD-119

(Figure 2)

31.70 g/t Au over 7.5m (17.36 g/t Au over 7.5m capped at 70 g/t Au)

including 141.74 g/t Au over 1.5m

1.61 g/t Au over 36.4m

including 3.26 g/t Au over 3.8m

3.89 g/t Au over 13.2m

including 6.02 g/t Au over 2.5m

Hole 25ODD-124

(Figure 3)

1.76 g/t Au over 20.5m

including 5.46 g/t Au over 3.5m

5.67 g/t Au over 4.5m

Hole 25ODD-124W

(Figure 3)

2.64 g/t Au over 41.8m

including 9.25 g/t Au over 4.5m

3.49 g/t Au over 17.4m

including 6.31 g/t Au over 7.4m

5.66 g/t Au over 7.5m

Hole 25ODD-121

9.85 g/t Au over 2.9m

13.74 g/t Au over 3.5m

11.26 g/t Au over 2.0m

2.64 g/t Au over 12.4m

Hole 25ODD-120

1.66 g/t Au over 37.8m

2.74 g/t Au over 9.4m

0.96 g/t Au over 17.2m

Hole 25ODD-118

3.10 g/t Au over 14.5m

9.81 g/t Au over 2.5m

Elaine Ellingham, President & CEO, commented:

"Today's news marks another excellent batch of drill

results from the resource expansion drill program at Wenot. Highlights in hole 25ODD-119 alone

include 31.70 g/t Au over 7.5m (17.36 g/t Au capped), 1.61 g/t Au over 36.4m, and 3.89 g/t Au over

13.2m. These drill results again exemplify the multiple zones we have at Wenot, with each hole testing

multiple gold zones across the wide Wenot shear corridor.

The Wenot shear corridor reaches widths of

350-400m in the central portion and extends at least 2.5km along strike.

We are confident that the

limits of the Wenot mineralization are still open for further expansion. With the very successful drilling

over the past 18 months, we believe it is in the best interest of our shareholders to update the Mineral

Resource Estimate. Our Wenot mantra over the past year has been simple: "How Big Is It?".

The

2024-25 Wenot resource expansion drill program has now exceeded 33,000m and the updated

Mineral Resource Estimate is underway. Focused additional drilling at Wenot will continue in support

of the updated Preliminary Economic Assessment that is expected 3 to 4 months following the

updated MRE.

Drilling is now shifting towards earlier-stage gold targets both along strike at Wenot and on certain

near-surface zones where gold has already been identified. One drill has been mobilized to our

Blueberry Hill target area and a second to the Camp Zone. The objective is to identify and quantify

near-surface economic satellite deposits that could contribute to early mining. Concurrently, our

exciting hole 25ODD-122, targeting both the Gilt Creek deposit and the Wenot depth potential,

continues to progress well, and recently passed the 1,550m downhole mark (see News Release May

23, 2025). Drilling has been slow but steady."

Details on the currently reported holes are as follows:

Hole 25ODD-119

(Figure 2) was drilled from the north side of Wenot approximately 50m west of holes

24ODD-092 and 25ODD-101, both of which intersected broad zones of high-grade gold mineralization

within the most prolific historically-mined zone known as the "Dike Corridor". Within the Dike Corridor,

Hole 25ODD-119 intersected nine gold zones, the best ones being 3.57 g/t Au over 5.4m, 3.89 g/t Au

over 13.2m (including 21.9 g/t Au over 1.2m) and 31.70 g/t Au over 7.5m (which includes 141.74 g/t Au

over 1.5m). These zones were intersected at a vertical depth of approximately 280m and extend to a

depth of 380m, however older shallower holes show similarly impressive grades and widths within this

Dike Corridor. The correlation and extent of these multiple gold zones is best illustrated in Figure 2. The

interval assaying 31.7 g/t Au over 7.5m corresponds well to 50m up-dip interval of 3.83 g/t Au over

18.8m in hole 25ODD-101 and the 50m down-dip interval of 4.48 g/t Au over 57.0m in hole 24ODD-092.

Also significant, Hole 119 continued on to intersect 1.61 g/t Au over 36.3m (including 4.60 g/t Au over

3.0m) in the central quartz feldspar porphyry dike "CQFP" at a vertical depth of approximately 450m.

This CQFP was emplaced along the contact between the volcanic rocks on the north and the

sedimentary sequence of rocks to the south. This mineralized QFP corresponds well with the 50m up-dip

interval of 2.13 g/t Au over 48.5m (including 10.34 g/t Au over 3.3m) in hole 25ODD-101.

All-in-all, hole

119 was spectacular and together with neighbouring holes -092 and -101 show the very significant

potential of Wenot to host wide, high-grade zones within the larger resource.

Important to note that all of

these intervals are below the 2024 MRE pit shell and can be expected to contribute to the upcoming

MRE.

Hole 25ODD-124

(Figure 3) was drilled from the south side of Central Wenot across from Hole 25ODD-

111 recently drilled from the north, and between holes 25ODD-120 & 121 drilled from the north and also

reported in this release. Hole 124 targeted the Dike Corridor in an area 200m below the 2024 MRE and

PEA pit shell. It intersected 5.67 g/t Au over 4.5m in the very persistent Southern Porphyry Dike (SPOR),

a unit that can be traced the full strike essentially marking the southern extent of the main Wenot Shear

Corridor. Often hosting visible gold, this is a particularly high-grade example of this zone.

The SPOR

occurs within the sedimentary sequence, approximately 100m south of the main contact. The CQFP was

not sampled in this hole, due to the proximity of the wedged hole 124W. Hole 104 then was sampled

through the Dike Corridor where it intersected 1.76 g/t Au over 20.5m, 0.54 g/t Au over 12.0m, and 0.70

g/t Au over 9.9m.

Hole 25ODD-124 was wedged at 350m downhole in order to drill an up-dip gap area approximately 50-

75m from the impressive 68.7m interval grading 3.16 g/t Au from hole 24ODD-085.

The wedged Hole -

124W went on to intersect the CQFP which assayed 3.49 g/t Au over 17.4m, including 6.31 g/t Au over

7.4m. Further downhole, in the Dike Corridor, the hole intersected 5.66 g/t Au over 7.5m and 2.64 g/t Au

over 41.8m, including 9.25 g/t Au over 4.5m, and 0.76 g/t Au over 15.5m, starting at a vertical depth of

375m from surface and approximately 100m below the 2024 PEA pit shell.

The nearby Hole 124

intersected equivalent zones within the Dike Corridor, including 1.76 g/t Au over 20.5m.

Hole 25ODD-120

was drilled from the north side of Central Wenot designed to test the Dike Corridor at

depth below hole 24ODD-085. The hole was not intended to extend to the central QFP zone that was

already tested to a depth of 465m where it assayed 2.02 g/t Au over 18.7m.

In 2024, Hole -085

intersected 3.16 g/t Au over 68.7m, including 6.65 g/t Au over 29.9m within the Dike Corridor (News

Release dated December 4, 2024). Hole -120 was to test 50m below those intervals. It intersected at

least 6 intervals of gold mineralization within the Dike Corridor and although a 68m interval was not

intersected, the downdip extension did intersect 2.74 g/t Au over 9.4m, 9.29 g/t Au over 1.7m, 1.26 g/t

Au over 11.0m, and 1.66 g/t Au over 37.8m. These intervals represent a cumulative 59.9m of gold

mineralization (not continuous) within the Dike Corridor, approximately 150m below the 2024 PEA pit

shell. The hole also intersected 0.96 g/t Au over 17.2m in the northern extreme of the Dike Corridor,

within the volcanics.

Hole 25ODD-121

was drilled from the north side of Central Wenot behind hole 21ODD-025 and

between recently drilled holes 24ODD-091 (50m to the east) and 25ODD-111 (50m to the west). Hole

25ODD-121 intersected several intervals of gold mineralization approximately 100m below Hole

21ODD-025, including 9.85 g/t Au over 2.9m and 13.74 g/t Au over 3.5m,11.26 g/t Au over 2.0m and

other minor zones.

Hole 121 then intersected 2.64 g/t Au over 12.4m at the CQFP at a vertical depth of

400m from surface, approximately 150m below the 2024 PEA pit shell. Further downhole, 3.30 g/t Au

over 5.3m was intersected within the southern sediments.

Hole 25ODD-118

was drilled about ½ km east from the above holes, from the north side towards the

eastern end of Wenot, in an area less drilled.

It targeted 100-200m down-dip from the 2024 MRE and

PEA pit shell. At a relatively shallow vertical depth of approximately 200m, Hole 25ODD-118 intersected

1.23 g/t Au over 10.5m within the volcanics to the north that could be the extension of one of the known

splays. Within the Dike Corridor, wide diorite dikes were encountered with several narrow felsic dikes.

Only minor gold zones were intersected in the Dike Corridor in this hole, but included 2.61 g/t Au over

2.6m and 1.73 g/t Au over 4.0m.

Further downhole, the CQFP hosted various intervals of gold

mineralization including 0.55 g/t Au over 6.0m and 1.43 g/t Au over 6.0m. In the southern sedimentary

sequence, the hole intersected 3.10 g/t Au over 14.5m, 5.2 g/t Au over 2.4m and then bottomed in 9.81

g/t Au over 2.5m, at a vertical depth of approximately 450m.

Table 1. Recent Wenot Drill Results*

DDH

FROM

(m)

TO

(m)

INTERVAL

(m)

GRADE

(g/t Au)

25ODD-118

297.0

307.5

10.5

1.23

439.0

441.6

2.6

2.61

472.0

476.0

4.0

1.73

499.0

500.4

1.4

1.55

601.4

607.4

6.0

0.55

611.0

617.0

6.0

1.43

625.2

627.6

2.4

5.20

636.5

651.0

14.5

3.10

676.0

678.5

2.5

9.81

25ODD-119

183.1

185.5

2.4

1.64

401.0

406.4

5.4

3.57

417.8

431.0

**13.2

3.89

Including

423.5

426.0

2.5

6.02

And including

429.8

431.0

1.3

21.90

446.0

447.1

1.1

1.20

456.3

457.3

1.0

2.40

495.5

503.0

7.5

31.70

Including

499.5

501.0

1.5

141.74

511.5

513.0

1.5

1.71

521.5

524.5

3.0

1.47

534.5

537.5

3.0

1.49

544.7

549.0

4.4

0.93

566.0

567.5

1.5

1.02

622.9

659.3

36.4

1.61

Including

634.0

637.7

3.8

3.26

And including

644.5

647.5

3.0

4.60

676.5

680.5

4.0

1.59

25ODD-120

285.0

286.4

1.4

3.77

432.0

449.2

17.2

0.96

Including

445.1

449.2

4.1

2.02

509.8

511.3

1.5

1.41

571.0

580.4

9.4

2.74

590.8

598.6

7.9

0.41

603.0

614.0

11.0

1.26

632.2

670.0

**37.8

1.66

25ODD-121

154.7

156.0

1.3

2.05

227.0

228.5

1.5

1.01

333.0

335.9

2.9

9.85

420.5

424.0

3.5

13.74

515.7

516.3

0.6

1.16

552.0

554.0

2.0

11.26

560.2

561.5

1.3

2.08

573.3

576.0

2.7

2.17

579.6

582.0

2.4

0.51

595.5

607.9

12.4

2.64

713.2

718.5

5.3

3.30

Including

716.0

718.5

2.5

6.67

25ODD-124

266.5

271.0

4.5

5.67

287.5

289.0

1.5

1.53

570.8

591.3

20.5

1.76

Including

576.0

579.5

3.5

5.46

601.0

613.0

12.0

0.54

623.5

633.4

9.9

0.70

25ODD-124W

415.5

417.0

1.5

1.29

440.1

457.5

17.4

3.49

Including

443.8

451.2

7.4

6.31

518.0

525.5

7.5

5.66

533.0

574.8

**41.8

2.64

Including

555.9

560.4

4.5

9.25

598.0

613.5

15.5

0.76

*True widths vary as mineralization at Wenot is generally hosted within stockwork vein systems with alteration halos, with an estimated true width range

of 70-90%. Cut-off grade 0.30 g/t Au with maximum 3.0m internal dilution is applied.

**A maximum 5.0m internal dilution is applied. Grades are uncapped unless otherwise noted.

Figure 1. Omai Plan Map Showing Drill Hole Locations

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/8712/260484_d2b4eed73429b92e_001full.jpg

Figure 2. Cross-section for Hole 25ODD-119

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/8712/260484_d2b4eed73429b92e_002full.jpg

Figure 3. Cross-section for Holes 25ODD-120 and 25ODD-124/124W

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/8712/260484_d2b4eed73429b92e_003full.jpg

Table 2. Drill Hole Coordinates

Hole ID

Azimuth

(degrees)

Inclination

(degrees)

Easting

Northing

Depth

(m)

Status

25ODD-114

176

-57

304790

602030

700.0

Pending

25ODD-115

355

-52

305429

601248

106.5

Previously

Reported

25ODD-116

356

-50

304487

601468

571.6

Previously

Reported

25ODD-117

176

-50

305429

601849

646.0

Pending

25ODD-118

176

-53

305928

601800

541.0

Reporting

25ODD-119

175

-54

305028

601981

356.0

Reporting

25ODD-120

176

-54

305182

602067

688.0

Reporting

25ODD-121

176

-54

305289

601928

739.7

Reporting

25ODD-122

142

-60

304648

602870

Drilling

25ODD-123

357

-50

304533

601522

109.5

Pending

25ODD-124

357

-54

305233

601282

644.0

Reporting

25ODD-124W

357

-54

305233

601282

656.0

Reporting

1

NI 43-101 Technical Report dated May 21, 2024 "UPDATED MINERAL RESOURCE ESTIMATE AND PRELIMINARY ECONOMIC ASSESSMENT OF THE

OMAI GOLD PROPERTY, POTARO MINING DISTRICT NO.2, GUYANA" was prepared by Eugene Puritch, P.Eng., FEC, CET, President of P&E Mining

Consultants Inc. is available on SEDAR+ and on the Company's website. It includes a Wenot resource of 834,000 indicated ounces of gold averaging

1.48 g/t Au within 17.6 million tonnes and 1,614,000 inferred ounces of gold averaging 1.99 g/t Au within 25.2 million tonnes, and the adjacent Gilt

Creek resource of 1,151,000 indicated ounces of gold averaging 3.22 g/t Au within 11.1 million tonnes and 665,000 inferred ounces of gold averaging

3.35 g/t Au within 6.2 million tonnes.

2

Past production at the Omai Mine (1993-2005) is summarized in several Cambior Inc. documents available on

SEDARplus.ca

, including March 31, 2006

AIF and news release August 3, 2006.

Quality Control

Omai maintains an internal QA/QC program to ensure sampling and analysis of all exploration work is

conducted in accordance with best practices. Certified reference materials, blanks and duplicates are

entered at regular intervals. Samples are sealed in plastic bags.

Drill core samples (halved-core) were shipped to ActLabs and some batches to MSALABS, both

certified laboratories in Georgetown Guyana, respecting the best chain of custody practices. At the

laboratory, samples are dried, crushed up to 80% passing 2 mm, riffle split (250 g), and pulverized to

95% passing 105 μm, including cleaner sand. Fifty grams of pulverized material is then fire assayed by

atomic absorption spectrophotometry (AA). Initial assays with results above 3.0 ppm gold are re-

assayed using a gravimetric finish. For samples with visible gold two separate 250g or 500g pulverized

samples are prepared, with 50 grams of each fire assayed by atomic absorption spectrophotometry,

with assays above 3.0 ppm gold being re-assayed using a gravimetric finish. Certified reference

materials and blanks meet with QA/QC specifications.

Qualified Person

Elaine Ellingham is a Qualified Person (QP) under National Instrument 43-101 "Standards of Disclosure

for Mineral Projects" and has approved the technical information contained in this news release. Ms.

Ellingham is not considered to be independent for the purposes of National Instrument 43-101.

ABOUT OMAI GOLD

Omai Gold Mines Corp. is a Canadian gold exploration and development company focused on rapidly

expanding the two orogenic gold deposits at its 100%-owned Omai Gold Project in mining-friendly

Guyana, South America. The Company has established the Omai Gold Project as one of the fastest

growing and well-endowed gold camps in the prolific Guiana Shield greenstone belt. In February 2024

the Company announced an updated NI 43-101 Mineral Resource Estimate

1

("MRE") of 29 million

tonnes grading 2.15 g/t Au and containing 2.0 million ounces of gold (Indicated) and 31 million tonnes

grading 2.26 g/t Au and containing 2.3 million ounces (Inferred), comprised of both the Wenot open pit

deposit and the adjacent Gilt Creek underground deposit. This was followed by an initial baseline

Preliminary Economic Assessment ("PEA") in April 2024, which contemplated an open pit-only

development scenario and included only 45% of the Omai Gold Project MRE. Subsequent to the 2024

MRE, the Company has been aggressively drilling to expand gold resources at the Wenot deposit and

has identified additional wide zones of high-grade gold mineralization.

In 2025 Omai Gold plans to continue its impactful drill programs, announce an updated and expanded

MRE, and complete an updated PEA which would include an expanded Wenot open pit deposit and an

underground mining scenario at Gilt Creek. The Omai Gold Mine produced over 3.7 million ounces of

gold from 1993 to 2005

2

, ceasing operations when gold was below US$400 per ounce. The Omai site

benefits from much existing infrastructure and will soon be connected to the two largest cities in Guyana,

Georgetown and Linden, via paved road.

For further information, please see our website

www.omaigoldmines.com

or contact:

Elaine Ellingham, P.Geo.

President & CEO

[email protected]

+1.416.473.5351

David Stewart, P.Eng.

VP Corporate Development & Investor Relations

[email protected]

+1.647.294.8361

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

Cautionary Note Regarding Forward-Looking Statements

This news release includes certain "forward-looking statements" under applicable Canadian securities

legislation. Forward-looking statements include, but are not limited to, statements with respect to the

timing of completion of exploration, trenching and drill programs, and the potential for the Omai Gold

Project to allow Omai to build significant gold Mineral Resources at attractive grades, and forward-

looking statements are necessarily based upon a number of estimates and assumptions that, while

considered reasonable, are subject to known and unknown risks, uncertainties and other factors which

may cause the actual results and future events to differ materially from those expressed or implied by

such forward-looking statements.

Such factors include, but are not limited to general business, economic, competitive, political and

social uncertainties; delay or failure to receive regulatory approvals; the price of gold and copper; and

the results of current exploration. Further, the Mineral Resource data set out in the Omai Gold news

release are estimates, and no assurance can be given that the anticipated tonnages and grades will

be achieved or that the indicated level of recovery will be realized. There can be no assurance that

forward-looking statements will prove to be accurate, as actual results and future events could differ

materially from those anticipated in such statements. Accordingly, readers should not place undue

reliance on forward-looking statements. The Company disclaims any intention or obligation to update

or revise any forward-looking statements, whether as a result of new information, future events or

otherwise, except as required by law.

Further, the Preliminary Economic Assessments and related data discussed in this news release are

estimates, and no assurance can be given that the anticipated tonnages and grades will be achieved

or that the indicated level of recovery will be realized. Forward-looking statements are subject to known

and unknown risks, uncertainties and other factors that may cause the actual results, level of activity,

performance or achievements of Omai Gold Mines Corp. to be materially different from those

expressed or implied by such forward-looking statements, including but not limited to: risks related to

international operations; actual results of current exploration activities; conclusions of economic

evaluations; changes in project parameters as plans continue to be refined; future prices of gold,

copper and other minerals and metals; general market conditions; possible variations in ore reserves,

grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents,

labour disputes and other risks of the mining industry; uncertainty of access to additional capital;

delays in obtaining governmental approvals or in the completion of development or construction

activities.