Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

OM.TO ·

Osisko Metals Intersects 3.1 Metres Assaying 12.3% Zinc + 5.4% Lead at the Mount Fronsac North Project

Drill Results

OSISKO METALS INTERSECTS 3.1 METRES ASSAYING 12.3% ZINC + 5.4% LEAD

AT THE MOUNT FRONSAC NORTH PROJECT

(Montreal – January 17, 2018) Osisko Metals Incorporated (the “Company” or “Osisko Metals”) (TSX-

V: OM; FRANKFURT: 0B5) is pleased to announce additional results from its drill program on the Mount

Fronsac North Project located 60 kilometres west of Bathurst, New Brunswick. Drill hole MF17- 43

intersected 3.1 metres of 12.3% Zn and 5.4% Pb, and 91.9 g/t Ag, within 15.5 metres of semi massive

to massive sulphides. The holes being reported tested the deposit at different elevations to better target

high-grade zones within the deposit.

Drill hole MF17-46, encountered a 21.6 metre, (19.0m true thickness) predominantly copper rich massive

sulphide zone from 363.8 to 385.4 , which included 11.8 meters, grading 1.53% Cu, 0.43% Zn and

0.1% Pb. These copper rich massive sulphide s are similar to historical drillhole MF00 -26 that is located

300m to the north that intersected 1.84% Cu over 7.0 metres. Similar mineralization was also found in

historical drill hole MF00-22, located 80 metres down dip, that intersected 2.3 metres of 1.44% C u, 2.37%

Zn, 1.07% Pb, 37.6 g/t Ag and 0.4 g/t Au.

This discreet copper rich zone is significant and it is being interpreted as a cupriferous massive sulphide

lens rather than a copper rich stockwork feeder zone that typically underlie the massive sulphide lens. The

results being announced are in Table 1 and more assay results are included in Table 2 below. Future drilling

will continue to test the economic potential of this cu priferous massive sulphide lens to potentially build

additional resources of economic interest.

Hole No. From

(m) To (m) Drill

width(m)

Zn

(%)

Pb

(%)

Cu

(%)

Ag

(g/t)

Au

(g/t)

MF17-43 368.60 371.70 3.10 12.32 5.44 0.07 91.9 0.86

MF17-43 382.60 384.10 1.50 3.44 0.52 0.01 2.8 0.18

MF17-46 369.2 381.0 11.8 0.43 0.1 1.53 7.9 866

Table 1: Drill hole assay results.

Jeff Hussey, President and CEO of Osisko Metals, commented: “These higher -grade results are

encouraging as we continue to drill within this historical deposit. The extension of the cupriferous massive

sulphide lens adds a new interesting potential for Mount Fronsac North. Our objective is to continue defining

and extending both massive sulphide lenses within the deposit boundaries. Additionally, it is interesting to

see a thick section of barren sulphides associated with zinc -lead rich zones as this is a feature typical of

some of the larger volcanogenic massive sulphide systems in the camp.”

The results being announced are illustrated on the inclined longitudinal section linked here . D rill hole

MF17-43 and MF17-44 intersected the deposit half way in between drill holes MF00 -31Wedge and MF00-

29Wedge (these results were released on December 6th, 2017).

2

More assays from this strongly mineralized zone are included in Table 2 below along with results from

MF17-44 that contained 13.2 metres of predominantly massive sulphides.

About Mount Fronsac North

The Mount Fronsac North deposit contains a historical, non-NI43-101 compliant, unclassified resource of

1.26 million tonnes grading 7.65 % Zn, 2.18 % Pb, 0.14% Cu, 40.3 g/t Ag, and 0.40 g/t Au. This high-grade

deposit is hosted within approximately 14 mill ion tonnes of low -grade, semi -massive (>60%) to locally

massive sulfides that occur in an envelope of quartz-sericite ± chlorite schist.

The deposit has a north-south strike length of 525 metres and a down dip length of 600 metres. Thickness

varies betwee n 2 to 20 metres. The alteration and disseminated mineralization halo has a maximum

thickness of 140 metres and contains up to 50 percent fine to coarse -grained disseminated pyrite. The

pyritic envelope is 900 metres long and extends down dip over 1,000 me tres. Massive sulfides are found

throughout this alteration envelope, but preferentially occur at or near the upper contact .

Hole No. From

(m)

To

(m)

Interval

(m)

Zn

(%)

Pb

(%)

Cu

(%)

Ag

(g/t)

Au

(ppb)

MF-17-43 333.8 334.4 0.60 3.61 1.1 0.0 11.0 41

MF-17-43 337.0 337.9 0.90 3.56 1.5 0.0 29.0 108

MF-17-43 349.7 350.6 0.90 6.43 0.15 0.18 <3 409

MF-17-43 357.7 358.0 0.30 5.61 2.57 0.09 72.0 272

MF-17-43 360.6 361.0 0.40 8.4 2.57 0.07 84.0 98

MF-17-43 368.6 371.7 3.1 12.32 5.44 0.07 91.9 864

MF-17-43 382.6 384.1 1.5 3.44 0.52 0.01 2.8 185

MF-17-44 309.0 310.3 1.3 3.36 1.39 0.01 18.5 40

MF-17-44 335.0 335.8 0.80 2.94 1.7 0.01 18.0 139

MF-17-44 393.7 394.7 1.00 2.85 1.16 0.01 7.0 51

MF-17-46 369.2 381.0 11.8 0.43 0.1 1.53 7.9 866

MF-17-46 384.0 385.4 1.4 2.75 0.55 0.12 7.0 971

MF-17-46 412.0 412.4 0.4 6.38 2.77 0.02 22.3 20

Table 2: Mount Fronsac North Assays

3

Table 3: Drill hole information and location in New Brunswick Double Stereographic Projection (NBS)

Qualified Person

Mr. Gary Woods is the Senior Exploration Manager for Osisko Metals Incorporated and a Professional

Geologist registered in New Brunswick . He is th e Qualified Person responsible for the technical data

reported in this news release.

Quality Assurance / Quality Control

Osisko Metals adheres to a strict Quality Assurance and Quality Control program with regard to core

handling, sampling, transportation of samples and lab analyses. Drill core samples from Osisko Metals

were securely transported to its core facility in Bathurst New Brunswick where they were logged and

sampled. Samples selected for assay were shipped via secure transportation to Activation Laboratories

preparation facility in Fredericton New Brunswick. Pulps were analyzed at Activation Laboratories facility in

Ancaster, Ontario. Zinc, lead and copper were analyzed by assay grade peroxide fusion (total digestion)

with ICP-AES finish. Silver was analyzed by gravimetric fire assay and gold by fire assay-atomic absorption.

About Osisko Metals

Osisko Metals is a C anadian exploration and development company creating value in the base metal space

with an emphasis on zinc. To date, the Company has consolidated over 63,000 hectares in the Bathurst Mining

Camp (“BMC”) in which it is focused on upgrading and expanding 6 historical deposits. The objective is to

develop a multi -deposit asset base that could feed a central concentrator. In Québec, the Company owns

42,000 hectares that cover 12 grass-root zinc targets that will be selectively advanced through exploration. In

parallel, Osisko Metals is monitoring several base metal oriented peers for projects and acquisition

opportunities. Osisko Gold Royalties Ltd. (TSX/NYSE: OR) and Osisko Mining Inc. (TSX: OSK) are significant

shareholders of the Company.

Hole

Number

Azimuth

(degrees)

Dip

(degrees) Length (m) Easting

NBS

Northing

NBS

MF17-43 268 -72 482.4 2511561 7601573

MF17-44 267 -61 446.0 2511561 7601573

MF17-45 268 -77 ABANDONED 2511471 7601733

MF17-46 268 -77 701.0 2511471 7601733

MF17-47 268 -62 623.0 2511632 7601811

4

For further information on Osisko Metals, visit www.osiskometals.com or contact:

Jeff Hussey

President & CEO

Osisko Metals Incorporated

(514) 861-4441

Email: [email protected]

www.osiskometals.com

Christina Lalli

Director, Investor Relations

Osisko Metals Incorporated

(514) 861-4441

Email: [email protected]

www.osiskometals.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Information

This news releas e contains "forward -looking information" within the meaning of applicable Canadian

securities legislation based on expectations, estimates and projections as at the date of this news release.

Forward-looking information involves risks, uncertainties and ot her factors that could cause actual events,

results, performance, prospects and opportunities to differ materially from those expressed or implied by

such forward -looking information. Forward -looking information in this news release includes, but is not

limited to, the use of proceeds of the Offering; the timing and ability of the Corporation, if at all, to obtain

final approval of the Offering from the TSX Venture Exchange; an exemption being available under MI 61 -

101 and Policy 5.9 of the TSX Venture Exch ange from the minority shareholder approval and valuation

requirements for each related party transaction; objectives, goals or future plans; statements regarding

exploration results and exploration plans. Factors that could cause actual results to differ materially from

such forward -looking information include, but are not limited to, capital and operating costs varying

significantly from estimates; the preliminary nature of metallurgical test results; delays in obtaining or

failures to obtain required governmental, environmental or other project approvals; uncertainties relating to

the availability and costs of financing needed in the future; changes in equity markets; inflation; fluctuations

in commodity prices; delays in the development of projects; the other risks involved in the mineral

exploration and development industry; and those risks set out in the Corporation's public documents filed

on SEDAR at www.sedar.com. Although the Corporation believes that the assumptions and factors used

in preparing the forward-looking information in this news release are reasonable, undue reliance should not

be placed on such information, which only applies as of the date of this news release, and no assurance

can be given that such events will occur in the disclosed time frames or at all. The Corporatio n disclaims

any intention or obligation to update or revise any forward -looking information, whether as a result of new

information, future events or otherwise, other than as required by law.

Neither the TSX Venture Exchange nor its Regulation Services Pr ovider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news

release. No stock exchange, securities commission or other regulatory authority has approved or

disapproved the information contained herein.