Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

OM.TO ·

Osisko Metals Intersects 18.66% Zinc + Lead Over 20.73 Metres at Pine Point

Drill Results

Osisko Metals Intersects 18.66% Zinc + Lead Over 20.73 Metres at Pine Point

MONTREAL, March 04, 2019 -- Osisko Metals Incorporated (the “ Company” or “Osisko Metals”) (TSX-V: OM; FRANKFURT:

OB51) is pleased to announce assay results from 14 drill holes completed in the W-85 area within the North Zone (“NZ”) of the

Pine Point Mining Camp (“PPMC”). Highlights include drill hole W85-18-PP-005 that intersected 12.17% zinc and 6.49% lead

over 20.73 metres, hole W85-18-PP-011 that intersected 9.09% zinc and 7.65% lead over 37.62 metres and hole W85-18-

PP-001 that intersected 3.24% zinc and 8.32% lead over 60.37 metres . (See 2018 Summer Drill Campaign North Zone - W-

85-01 and 02 pits)

All intersections are from definition drilling within two cylindrical-shaped vertical prismatic deposits that were included in the

recent maiden Mineral Resource Estimate (“MRE”) (see press release dated December 6, 2018), and all intercepts are located

between 13 and 105 metre depths below surface. Highlights are listed below in Table 1 and details are provided in Tables 2 &

3.

Table 1 : Selected Drill Highlights.

Hole Name Area Historical

Deposit

From To Drilled

Width Zinc Lead Lead +

Zinc

(metres) (metres) (metres) % % %

W85-18-PP-001 North Zone W85 15.20 75.57 60.37 3.24 8.23 11.47

W85-18-PP-004 North Zone W85 49.33 68.66 19.33 5.15 1.58 6.73

W85-18-PP-005 North Zone W85 57.67 78.40 20.73 12.17 6.49 18.66

W85-18-PP-011 North Zone W85 33.50 71.12 37.62 9.09 7.65 16.74

W85-18-PP-012 North Zone W85 69.85 104.70 34.85 9.90 3.57 13.47

Jeff Hussey, President & CEO of Osisko Metals, commented: “We are still receiving assay results from the 2018 and 2019

definition drilling campaign, totalling over 40,000 meters of additional drilling completed after the cut-off date for the December

2018 MRE. These results will be incorporated into the next MRE planned for 2019. The drilling reported today continues to

confirm mineralization and improve the drill spacing needed to bring Inferred Mineral Resource into the indicated category.”

The newly modelled W-85 and YBM pits are collectively known as the W85 deposit.  The western W-85 pit currently measures

250 by 150 metres and the eastern YBM pit currently measures 200 by 100 metres.  The two pits occur within the North Zone

and are located 20 kilometres west of the electrical sub-station within 400 metres of the end of a main haul road.  Reported in

the 2018 NI43-101 Inferred MRE for the North Zone are 13.1 million tonnes of 4.26% zinc and 1.87% lead. The objective of the

2018 drill program was to convert the Cominco Ltd. unclassified near-surface historical resources into a NI43-101 Inferred

MRE. These deposits are considered to be amenable to open pit mining.

Table 2: Composite Assay Results.

Hole Name Historical

Deposit

From To Drilled

Width

True

Width Zinc Lead Lead +

Zinc

  (metres) (metres) (metres) (metres) % % %

W85-18-PP-001 W85 15.20 75.57 60.37 60.37 3.24 8.23 11.47

W85-18-PP-002 W85 65.60 67.60 2.00 2.00 2.56 0.28 2.84

W85-18-PP-003 W85 No Significant Values

W85-18-PP-004 W85 49.33 68.66 19.33 19.33 5.15 1.58 6.73

W85-18-PP-005 W85 57.67 78.40 20.73 20.73 12.17 6.49 18.66

W85-18-PP-006 W85 78.00 79.00 1.00 1.00 1.06 0.36 1.42

W85-18-PP-007 W85 72.78 73.50 0.72 0.72 6.12 1.51 7.63

W85-18-PP-008 W85 71.90 78.00 6.10 6.10 2.62 0.63 3.24

W85-18-PP-009 W85 70.00 72.13 2.13 2.13 0.97 0.21 1.18

W85-18-PP-010 W85 70.15 73.40 3.25 3.25 6.04 2.13 8.17

W85-18-PP-010 W85 84.10 87.35 3.25 3.25 7.16 1.48 8.64

W85-18-PP-011 W85 33.50 71.12 37.62 37.62 9.09 7.65 16.74

W85-18-PP-011 W85 88.00 100.40 12.40 12.40 3.80 0.90 4.70

W85-18-PP-012 W85 49.69 52.29 2.60 2.60 3.38 0.31 3.68

W85-18-PP-012 W85 60.50 61.50 1.00 1.00 5.33 6.37 11.70

W85-18-PP-012 W85 69.85 104.70 34.85 34.85 9.90 3.57 13.47

W85-18-PP-013 W85 75.55 77.70 2.15 2.15 3.71 0.87 4.58

W85-18-PP-014 W85 71.50 77.85 6.35 6.35 1.08 0.48 1.55

W85-18-PP-014 W85 80.05 86.70 6.65 6.65 4.77 1.09 5.85

W85-18-PP-014 W85 94.07 96.18 2.11 2.11 3.22 14.50 17.72

Note Regarding Qualified Person

Mr. Robin Adair is the Qualified Person and the Vice President Exploration for Osisko Metals Incorporated. He is responsible

for the technical data reported in this news release and a Professional Geologist registered in the North West Territories.

Quality Assurance / Quality Control

Osisko Metals adheres to a strict Quality Assurance and Quality Control program with regard to core handling, sampling,

transportation of samples and lab analyses. Drill core samples from the Pine Point project area were securely transported to

its core facility in Hay River, Northwest Territories where they were logged and sampled. Samples selected for assay were

shipped via secure transportation to the ALS Canada Ltd.’s preparation facility in Yellowknife. Pulps were analyzed at the ALS

Canada Ltd. facility in North Vancouver, British Columbia. All samples are analyzed by four acid digestion followed by both

ICP-AES and ICP-MS for ultra-trace level detection for a multi-element suite with a 1% upper detection limit for base metals. 

Samples reporting over 1% for Zn and 1% for Pb are analyzed by assay grade four acid digestion and ICP-AES analysis with

an upper detection limit of 30% and 20% respectively.  Samples reporting Zn >30% and or Pb >20% are analyzed by

traditional titration.

Table 3: Drill hole collar locations (UTM NAD83 zone 11).

Hole Name Area Deposit Easting Northing Elevation Azimuth Dip Depth

(metres)

W85-18-PP-001 North Zone W85 620018.0 6746460.0 189.00 0 -90 80.00

W85-18-PP-002 North Zone W85 620058.0 6746486.0 189.00 0 -90 80.60

W85-18-PP-003 North Zone W85 620108.0 6746486.0 189.00 65 -70 36.50

W85-18-PP-004 North Zone W85 620075.0 6746452.0 189.00 0 -90 122.00

W85-18-PP-005 North Zone W85 620006.0 6746413.0 189.00 0 -90 133.00

W85-18-PP-006 North Zone W85 619835.0 6746480.0 189.00 0 -90 102.00

W85-18-PP-007 North Zone W85 619840.0 6746449.0 189.00 0 -90 100.00

W85-18-PP-008 North Zone W85 619815.0 6746465.0 189.00 0 -90 103.00

W85-18-PP-009 North Zone W85 619813.0 6746435.0 189.00 0 -90 99.00

W85-18-PP-010 North Zone W85 619849.0 6746414.0 189.00 0 -90 99.00

W85-18-PP-011 North Zone W85 619709.0 6746381.0 189.00 0 -90 106.00

W85-18-PP-012 North Zone W85 619652.0 6746348.0 189.00 0 -90 120.00

W85-18-PP-013 North Zone W85 619786.0 6746382.0 189.00 0 -90 106.00

W85-18-PP-014 North Zone W85 619745.0 6746456.0 189.00 0 -90 114.00

About Osisko Metals

Osisko Metals is a Canadian exploration and development company creating value in the base metal space with a focus on

zinc mineral assets. The Company controls Canada’s two premier zinc mining camps. The Company’s flagship properties

are : 1) the Pine Point Mining Camp (“PPMC”), located in the Northwest Territories, has an Inferred Mineral Resource of 38.4

Mt grading 4.58% zinc and 1.85% lead, making it the largest high grade, pit constrained zinc deposit in Canada (please refer

to the Amended Technical Report for further information); 2) The Eastern Bathurst Mining Camp (“EBMC”), located in northern

New Brunswick, has Indicated Mineral Resources of 1.96 Mt grading 5.77% zinc, 2.38% lead, 0.22% copper and 68.9g/t silver

(9.00% ZnEq) and Inferred Mineral Resources of 3.85 Mt grading 5.34% zinc, 1.49% lead, 0.32% copper and 47.7 g/t silver

(7.96% ZnEq) in the Key Ancon and Gilmour South deposits. In 2019, the Company will continue to diligently develop and

explore in order to confirm and grow both projects. In Québec, the Company owns 42,000 hectares that cover 12 grass-root

zinc targets that will be selectively advanced through exploration. The Inferred Mineral Resources mentioned in this press

release conform to National Instrument 43-101 standards. These mineral resources were reported by the Company on

December 6, 2018 and January 20, 2019 and were prepared by independent qualified persons, as defined by NI43 101

guidelines. The above-mentioned mineral resources are not mineral reserves as they do not have demonstrated economic

viability. The quantity and grade of the reported Inferred Mineral Resources are conceptual in nature and are estimated based

on limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade or

quality continuity.  

For further information on Osisko Metals, visit www.osiskometals.com  or contact:

Jeff Hussey

President & CEO

Osisko Metals Incorporated

(514) 861-4441

Christina Lalli

Director, Investor Relations

Osisko Metals Incorporated

(438) 399-8665

Email: [email protected]

www.osiskometals.com

Email: [email protected]

www.osiskometals.com

Cautionary Note Regarding Forward-Looking Information

This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation

based on expectations, estimates and projections as at the date of this news release. Forward-looking information involves

risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to

differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news

release includes, but is not limited to, the use of proceeds of the Offering; the timing and ability of the Corporation, if at all, to

obtain final approval of the Offering from the TSX Venture Exchange; an exemption being available under MI 61-101 and

Policy 5.9 of the TSX Venture Exchange from the minority shareholder approval and valuation requirements for each related

party transaction; objectives, goals or future plans; statements regarding exploration results and exploration plans. Factors

that could cause actual results to differ materially from such forward-looking information include, but are not limited to, capital

and operating costs varying significantly from estimates; the preliminary nature of metallurgical test results; delays in

obtaining or failures to obtain required governmental, environmental or other project approvals; uncertainties relating to the

availability and costs of financing needed in the future; changes in equity markets; inflation; fluctuations in commodity prices;

delays in the development of projects; the other risks involved in the mineral exploration and development industry; and those

risks set out in the Corporation's public documents filed on SEDAR at www.sedar.com. Although the Corporation believes that

the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue

reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance

can be given that such events will occur in the disclosed time frames or at all. The Corporation disclaims any intention or

obligation to update or revise any forward-looking information, whether as a result of new information, future events or

otherwise, other than as required by law.

In context of current mineral resources reported by the Company, mineral resources are not mineral reserves as they do not

have demonstrated economic viability. The quantity and grade of the reported Inferred Mineral Resources are conceptual in

nature and are estimated based on limited geological evidence and sampling. Geological evidence is sufficient to imply but

not verify geological and grade or quality continuity.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities

commission or other regulatory authority has approved or disapproved the information contained herein.

A photo accompanying this announcement is available at http://www.globenewswire.com/NewsRoom/AttachmentNg/28ea2bf1-

8786-46e4-8dce-e2705aa3bb82