Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

OGN.V ·

Evrim Provides Update on Ermitaño Project

Corporate Updates

910-850 WEST HASTINGS ST. VANCOUVER, BC, CANADA V6C 1E1

TEL: 604.248.8648 FAX: 604.248.8663 WWW.EVRIMRESOURCES.COM

TSX-V: EVM

CONTACT: PADDY NICOL OR CHARLES FUNK

NEWS RELEASE

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange)

accepts responsibility for the adequacy or accuracy of this release.

Evrim Provides Update on Ermitaño Project

Vancouver B.C. – April 19, 2017: Evrim Resources Corp. (TSX.V:EVM) (“Evrim” or the “Company”) is pleased to

provide an update on recent activity at its Ermitaño gold-silver project in Sonora, Mexico under option to First

Majestic Silver Corp. (TSX:FR: NYSE: AG) (“First Majestic”). First Majestic has completed six additional drill holes

following up discovery hole EW16-04 that intersected 11.4 grams per tonne gold over 18.0 metres at the Ermitaño

West prospect (see News Release dated January 17, 2017). During a site visit, Evrim geologists reviewed holes

EW16-05 to EW16-07 and report intersections of wide veins with near identical vein mineralogy and textures to

those reported in hole EW16-04.

First Majestic is in receipt of the assay results and has indicated that it would make the results available to Evrim

subsequent to successful completion of its community engagement process at Ermitaño. Under the terms of the

Agreement, First Majestic has to deliver a production notice supported by the required permits and a detailed

mining and construction schedule by January 10, 2019 to earn 100% of the Ermitaño project, at which time Evrim

will retain a 2% NSR.

The Ermitaño West prospect is located approximately 3.5 kilometres southeast of First Majestic’s operating Santa

Elena gold-silver mine.

Ermitaño West Drilling Highlights

The following summary of drilling results at the Ermitaño West prospect is based on detailed field observations

made by Evrim geologists during a site visit. Evrim has not received assay results for these drill holes. These field

observations will be corroborated by assay results if and when received by Evrim. Readers are cautioned that

visual inspections of gold and silver bearing drill core by professional geologists are not always indicative of actual

mineral composition or assay results.

Drill Hole EW16-05

• 19.8 metre vein intersected at 130.7 metres downhole and located 200 metres west and 75 metres higher

in elevation than hole EW16 -04. The vein is hosted in strongly silicified rhyolite tuff and is composed of

green- to cream-coloured, colloform banded, chalcedonic with minor crystalline quartz, common adularia

bands, zones of quartz- healed breccia with milled vein fragments, iron oxides after sulphide and minor

manganese oxide.

Drill Hole EW16-06

• 14.4 metre vein intersected at 268.9 metres downhole and located 120 metres west and 60 metres deeper

than hole EW16 -04. The vein is composed of abundant quartz veinlets up to 50 centimetres wide with

slivers of wallrock from 268.9 to 274.4 metres and competent quartz vein from 274.4 to 283.2 metres. The

vein is hosted at the contact between strongly silicified rhyolite tuff and andesite tuff and is composed of

dominantly green -coloured, vein breccia with colloform bands and bladed quartz replacing calcite,

chalcedonic with rare crystalline quartz, adularia, iron oxides after sulfide, common manganese oxide and

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange)

accepts responsibility for the adequacy or accuracy of this release.

rare visible native silver. Native silver is observed from 280.4 to 281.6 metres. Quartz healed milled breccia

with clasts of vein material are common.

Drill Hole EW16-07

• 9.0 metre vein intersected at 217.2 metres downhole within a 103.5 metre zone of widespread vein

stockwork beginning at 175.6 metres downhole. The main vein is intersected 110 metres northeast and 70

metres deeper than hole EW16-02. The vein and stockwork is hosted in silicified rhyolite tuff and andesite

dyke and composed of white, massive to rarely banded chalcedonic quartz with manganese oxide.

Further information is required to determine accurate true widths though holes 4 -6 are estimated to be 70% of

reported intervals and holes 1-3 and 7 are estimated to be 90-100% of reported intervals.

Figure 1 – Location map of Ermitaño project and Santa Elena mine

Holes EW16-06 and EW16-05 step out 110 and 200 metres west, respectively of the discovery hole EW16 -04, and

intersect similarly wide veins with near identical mineralogy and textures to holes EW16 -03 and EW16- 04. Hole

EW16-05 appears to intersect the top of the boiling zone while hole EW16 -06 is in the core of the boiling zone.

These holes define a strike length of approximately 440 metres between hole EW16-02 in the east and hole EW16-

05 in the west with boiling textures present and a depth range of 140 metres. The boiling zone defined by assays

in holes EW16-02, -03 and -04 and mineralogical textures in holes EW16-05 and -06 remains open to the west and

at depth.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange)

accepts responsibility for the adequacy or accuracy of this release.

Hole EW16-07 is the easternmost intersection and cut through quartz stockwork not seen in previous holes. The

main vein has mineralogy and textures more similar to the white massive quartz observed in hole EW16-01.

Pierce points of the vein indicate a post -mineral fault may be present between holes EW16 -04 and EW16-03 that

rotates the eastern portion of the vein to dip at an average of 70° to the north while the western portion is sub -

vertical.

Figure 2 – Plan map of Ermitaño West showing surface geology and drilling

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange)

accepts responsibility for the adequacy or accuracy of this release.

Figure 3 – Ermitaño West Long Section

Qualified Person Statement

Evrim's disclosure of technical or scientific information in this press release has been reviewed and approved by

Stewart Harris, P.Geo. Vice President, Technical Services for the Company. Mr. Harris serves as a Qualified Person

under the definition of National Instrument 43-101.

About Evrim Resources

Evrim Resources is a mineral exploration company whose goal is to participate in significant exploration discoveries

supported by a sustainable business model. The Company has a diverse range of quality projects and a database in

Mexico and portions of southwestern United States. The existing projects, and generation of quality exploration

targets and ideas, are advanced through option and joint venture agreements with industry partners to create

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange)

accepts responsibility for the adequacy or accuracy of this release.

shareholder value. Evrim’s business plan also includes royalty creation utilizing the Company’s exploration

expertise and existing projects.

On Behalf of the Board

EVRIM RESOURCES CORP.

Paddy Nicol

President & CEO

To find out more about Evrim Resources Corp. , please contact Paddy Nicol, President or Charles Funk , VP New

Opportunities and Exploration at 604-248-8648, or visit www.evrimresources.com.

Forward Looking Information

This news release includes certain statements that may be deemed "forward looking statements". All statements in this news release, other

than statements of historical facts, that address events or developments that Evrim Resources Corp. (the "Company“) ex pects to occur, are

forward looking statements. Forward looking statements are statements that are not historical facts and are generally, but no t always,

identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "proje cts", "potential" and similar expressions,

or that events or conditions "will", "would", "may", "could" or "should" occur.

Although the Company believes the expectations expressed in such forward looking statements are based on reasonable assumptions, such

statements are not guarantees of future performance and actual results may differ materially from those in the forward looking statements.

Factors that could cause the actual results to differ materially from those in forward looking statements include market prices, exploitation

and exploration successes, and continued availability of capital and financing, and general economic, market or business conditions. Investors

are cautioned that any such statements are not guarantees of future performance and a ctual results or developments may differ materially

from those projected in the forward looking statements. Forward looking statements are based on the beliefs, estimates and opinions of the

Company’s management on the date the statements are made. Except as required by securities laws, the Company undertakes no obligation

to update these forward looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.