Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

OGG.V ·

Osisko Gold Confirms Presence of Mineralized System with Open Pit Potential at the Proserpine Target on the Cariboo Gold Project's Regional Property; Exploration Drilling Highlights Include 95.93 g/t Au over 4.60 m at 71 m Vertical Depth and 5.46

Drill Results

1 of 13

OGG NYSE TSXV

NEWS RELEASE

osiskogold.ca

Osisko Gold Confirms Presence of Mineralized System with Open

Pit Potential at the Proserpine Target on the Cariboo Gold

Project's Regional Property; Exploration Drilling Highlights

Include 95.93 g/t Au over 4.60 m at 71 m Vertical Depth and 5.46

g/t Au over 8.60 m at 77 m Vertical Depth

HIGHLIGHTS

• 6,463 m in 14 drill holes of new surface exploration drilling at the Proserpine regional exploration

target, located 7 km along strike to the southeast of the Cariboo Gold deposit

• Results confirm the presence of a n emerging gold mineralized system comprising high-grade

structures exhibiting similarities to those at the Cariboo Gold deposit that, together with broader

zones of lower-grade mineralization, may indicate potential for open pit mining methods

• Highlight intercepts include: 95.93 g/t Au over 4.60 m at 71 m vertical depth (including 873.00

g/t Au over 0.50 m), 5.46 g/t Au over 8.60 m at 77 m vertical depth, and 2.17 g/t Au over 14.45

m at 431 m vertical depth

• Drilling of an additional 26,500 m planned met res, initially with three rigs , is now resuming

following a seasonal hiatus

Toronto, Ontario, August 5, 2026 – Osisko Gold Group Inc. (NYSE: OGG, TSXV: OGG) (" Osisko Gold" or the

"Company") is pleased to announce its first set of new diamond drilling results consisting of fourteen holes from

the surface exploration program on the Proserpine regional greenfield target, located within the broader Cariboo

Gold Project property boundary and approximately 7 kilometres ("km") from the Company's permitted, 100% -

owned Cariboo Gold Project (the "Project") in central British Columbia, Canada.

Chris Lodder, President, stated, “We are encouraged by the initial results from the drill campaign at Proserpine ,

which highlight the potential for a significant new gold mineralized system of scale located only 7 km from the Cariboo

Gold deposit. Drilling has intersected high-grade structures showing similarities to those at Cariboo , but also

containing areas with broader lower grade mineralization that may indicate potential for bulk mining methods. To

date, drilling has broadly tested an area measuring approximately 1.0 km x 0.5 km within a larger target of 6.0 km x

1.0 km gold-in-soil and rock anomaly. For context, the currently defined Cariboo Gold deposit extends approximately

4.0 km along strike by 0.5 km in width, underscoring the exploration potential that remains to be tested at Proserpine."

DRILL ASSAY HIGHLIGHTS

This news release contains assays from fourteen (14) diamond drillholes ("DD") totalling 6,463 meters ("m") with

depths ranging from 36.0 to 734.3 m (see Table 1 and Figure 3) completed between February and May of 2026. All

holes were collared in HQ (63.5 millimetre diameter) and reduced to NQ (47.6 millimetre diameter) where necessary

to continue advancing. Estimated true widths of intercepts are provided in Table 1. Select highlights include:

• 95.93 grams per tonne ("g/t") gold ("Au") over 4.60 m at 71 m vertical depth in PSP -26-004,

including:

– 873.00 g/t Au over 0.50 m, and

osiskogold.ca

2 of 13

OGG NYSE TSXV

– 3.77 g/t Au over 1.20 m

• 5.46 g/t Au over 8.60 m at 77 m vertical depth in PSP-26-001 (Figure 1), including:

– 16.05 g/t Au over 1.10 m, and

– 12.50 g/t Au over 0.87 m, and

– 10.25 g/t Au over 0.50 m, and

– 5.97 g/t Au over 0.70 m, and

– 5.21 g/t Au over 0.80 m, and

– 3.36 g/t Au over 0.60 m, and

– 1.50 g/t Au over 0.90 m, and

– 1.18 g/t Au over 0.90 m

• 2.17 g/t Au over 14.45 m at 431 m vertical depth in PSP-26-001, including:

– 35.10 g/t Au over 0.65 m, and

– 8.61 g/t Au over 0.50 m, and

– 2.21 g/t Au over 0.50 m, and

– 1.21 g/t Au over 0.50 m

• 1.46 g/t Au over 12.40 m at 295 m vertical depth in PSP-26-003, including:

– 15.40 g/t Au over 1.00 m, and

– 2.02 g/t Au over 0.50 m

• 3.17 g/t Au over 5.45 m at 334 m vertical depth in PSP-26-009, including:

– 19.30 g/t Au over 0.60 m, and

– 9.52 g/t Au over 0.50 m, and

– 1.22 g/t Au over 0.50 m

• 1.30 g/t Au over 12.00 m at 27 m vertical depth in PSP-26-011, including:

– 9.92 g/t Au over 0.70 m, and

– 6.19 g/t Au over 0.50 m, and

– 3.63 g/t Au over 0.50 m, and

– 3.75 g/t Au over 0.50 m, and

– 1.50 g/t Au over 0.65 m

• 2.93 g/t Au over 5.15 m at 233 m vertical depth in PSP-26-001, including:

– 15.60 g/t Au over 0.95 m

• 4.30 g/t Au over 3.10 m at 226 m vertical depth in PSP-26-001, including:

– 18.75 g/t Au over 0.50 m, and

– 7.54 g/t Au over 0.50 m

• 2.79 g/t Au over 4.00 m at 184 m vertical depth in PSP-26-014, including:

– 11.55 g/t Au over 0.90 m

• 2.30 g/t Au over 4.50 m at 17 m vertical depth in PSP-26-007, including:

osiskogold.ca

3 of 13

OGG NYSE TSXV

– 12.25 g/t Au over 0.50 m, and

– 5.62 g/t Au over 0.50 m, and

– 1.73 g/t Au over 0.50 m, and

– 1.09 g/t Au over 0.50 m

Results to date have expanded the footprint of known mineralization at Pros erpine to approximately 1.0 km along

strike by 0.5 km in width , with mineralization remaining open in all directions. All drill holes that reached their

intended target depths encountered mineralization, providing a compelling basis for systematic follow-up drilling.

Mineralization was encountered from near surface to vertical depths exceeding 400 metres. In particular, hole PSP-

26-001 returned several notable mineralized intercepts beginning at a vertical depth of approximately 55 metres

and with the deepest at more than 400 metres from surface.

FIGURE 1: 5.46 g/t Au over 8.6 m in PSP-26-001 at approximately 77 m vertical depth.

osiskogold.ca

4 of 13

OGG NYSE TSXV

Drilling also intersected significant intervals of the prospective siliceous sandstone unit, confirming its presence

within the target area and providing additional information to refine the geologic model. Based on preliminary

observations to date, the siliceous sandstone is believed to represent a more favourable host for mineralization than

the calcareous sandstone (see Figure 3).

Diamond drilling at Proserpine has resumed with three active drill rigs following a brief, planned seasonal hiatus.

Additional drill rigs may be mobilized as warranted as the planned drill program continues to expand the

mineralized footprint and increase drillhole density at Proserpine Southeast, while initiating first -pass drilling at

previously untested targets at Proserpine Northwest.

FIGURE 2: Cariboo Gold regional overview.

osiskogold.ca

5 of 13

OGG NYSE TSXV

FIGURE 3: Plan view of Proserpine diamond drilling with select intercept highlights.

osiskogold.ca

6 of 13

OGG NYSE TSXV

FIGURE 4: Proserpine diamond drilling select intercept highlights in long section.

TABLE 1: Select manual composite and individual sample highligh ts greater than or equal to 1.0 g/t Au.

Drillhole ID From (m) To (m) Length (m) Au g/t Est. True

Width (m)

Approx.

Vertical

Depth (m)

PSP-26-001 71.50 72.15 0.65 1.16 0.42 55

79.70 83.60 3.90 1.18 2.95 62

Including 80.20 81.30 1.10 2.71

and 83.05 83.60 0.55 1.67

97.00 105.60 8.60 5.46 6.51 77

Including 97.50 98.20 0.70 5.97

and 98.20 99.00 0.80 5.21

and 100.73 101.60 0.87 12.50

and 101.60 102.70 1.10 16.05

and 102.70 103.20 0.50 10.25

and 103.20 104.10 0.90 1.50

and 104.10 105.00 0.90 1.18

and 105.00 105.60 0.60 3.36

146.40 147.10 0.70 1.49 0.35 112

osiskogold.ca

7 of 13

OGG NYSE TSXV

Drillhole ID From (m) To (m) Length (m) Au g/t Est. True

Width (m)

Approx.

Vertical

Depth (m)

165.95 166.70 0.75 1.60 0.58 126

288.95 289.60 0.65 1.23 0.56 219

290.45 290.95 0.50 1.11 0.45 220

297.80 300.90 3.10 4.30 2.46 226

Including 297.80 298.30 0.50 7.54

and 300.40 300.90 0.50 18.75

304.70 309.85 5.15 2.93 3.95 233

Including 304.70 305.65 0.95 15.60

312.70 313.25 0.55 1.21 0.42 237

334.80 335.30 0.50 1.74 0.38 254

343.95 344.45 0.50 3.98 0.32 261

494.70 495.20 0.50 3.04 0.41 376

559.85 562.35 2.50 1.04 2.11 420

Including 561.85 562.35 0.50 4.53

572.00 586.45 14.45 2.17 11.80 431

Including 574.25 574.75 0.50 1.21

and 574.75 575.25 0.50 2.21

and 577.55 578.20 0.65 35.10

and 585.45 585.95 0.50 8.61

591.50 593.00 1.50 1.10 0.96 440

PSP-26-002 15.50 16.00 0.50 1.00 0.38 12

36.60 37.20 0.60 2.57 0.39 26

47.00 47.50 0.50 3.25 0.32 34

52.10 52.60 0.50 1.20 0.35 37

73.50 74.50 1.00 2.54 0.82 52

Including 74.00 74.50 0.50 4.68

89.70 90.20 0.50 2.83 0.35 63

95.10 95.60 0.50 1.04 0.25 67

165.90 166.40 0.50 1.33 0.25 115

179.60 180.10 0.50 1.61 0.46 124

194.20 194.95 0.75 1.83 0.61 134

PSP-26-003 83.60 84.10 0.50 2.98 0.35 66

145.15 145.65 0.50 2.58 0.39 113

169.35 171.25 1.90 4.93 1.34 133

Including 170.20 170.75 0.55 16.15

183.00 184.00 1.00 1.20 0.77 144

Including 183.00 183.50 0.50 2.27

187.50 191.00 3.50 1.12 2.76 148

Including 187.50 189.00 1.50 1.17

and 190.00 190.50 0.50 3.45

294.10 299.60 5.50 1.03 4.13 235

Including 299.10 299.60 0.50 8.10

329.00 334.00 5.00 1.10 3.97 262

Including 331.25 331.75 0.50 7.78

367.00 379.40 12.40 1.46 10.31 295

Including 370.50 371.50 1.00 15.40

and 373.60 374.10 0.50 2.02

395.80 396.30 0.50 1.18 0.38 313

411.10 417.70 6.60 1.09 5.07 326

Including 412.10 412.60 0.50 1.05

and 412.60 413.10 0.50 1.11

and 413.10 413.60 0.50 6.22

and 413.60 414.20 0.60 1.89

and 415.20 415.70 0.50 1.47

and 415.70 416.20 0.50 1.32

osiskogold.ca

8 of 13

OGG NYSE TSXV

Drillhole ID From (m) To (m) Length (m) Au g/t Est. True

Width (m)

Approx.

Vertical

Depth (m)

419.20 420.30 1.10 1.07 0.60 330

Including 419.70 420.30 0.60 1.80

and 430.10 430.60 0.50 2.30 0.09 338

439.30 442.20 2.90 1.00 2.33 345

Including 439.30 440.00 0.70 1.04

and 440.50 441.15 0.65 2.68

and 474.90 475.40 0.50 2.26 0.32 368

478.50 479.00 0.50 1.53 0.43 370

505.85 506.35 0.50 1.53 0.41 386

533.50 534.00 0.50 6.14 0.29 402

PSP-26-004 110.40 115.00 4.60 95.93 3.25 71

Including 112.30 112.80 0.50 873.00

and 113.80 115.00 1.20 3.77

PSP-26-005 55.05 58.60 3.55 1.08 1.91 42

Including 55.05 55.60 0.55 4.67

and 58.10 58.60 0.50 2.33

76.85 79.05 2.20 3.11 1.07 59

Including 77.35 78.00 0.65 2.77

and 78.00 79.05 1.05 4.58

and 135.35 135.85 0.50 1.05 0.45 101

194.00 194.50 0.50 1.12 0.32 147

227.60 228.20 0.60 1.10 0.10 172

241.50 242.00 0.50 1.24 0.26 182

294.00 294.50 0.50 2.17 0.45 224

312.75 313.75 1.00 1.03 0.89 239

Including 312.75 313.25 0.50 1.04

and 313.25 313.75 0.50 1.02

320.00 321.00 1.00 1.33 0.94 244

402.40 402.90 0.50 1.17 0.43 306

412.20 413.30 1.10 1.43 0.72 314

Including 412.20 412.80 0.60 1.82

414.50 416.45 1.95 1.04 1.05 315

Including 415.75 416.45 0.70 2.34

522.30 523.20 0.90 1.63 0.52 384

PSP-26-006 139.70 140.20 0.50 1.05 0.45 104

161.00 161.50 0.50 1.16 0.29 121

251.60 252.10 0.50 20.20 0.35 194

293.60 294.60 1.00 10.21 0.77 227

Including 293.60 294.10 0.50 20.30

315.50 316.50 1.00 1.82 0.94 243

Including 316.00 316.50 0.50 3.36

and 323.50 324.00 0.50 1.86 0.35 249

468.50 470.00 1.50 4.86 1.27 361

Including 468.50 469.00 0.50 11.50

and 469.50 470.00 0.50 3.06

476.50 477.00 0.50 1.33 0.43 366

499.00 499.50 0.50 1.22 0.43 383

509.90 510.90 1.00 1.15 0.42 392

Including 510.40 510.90 0.50 1.41

513.70 514.50 0.80 2.25 0.34 395

PSP-26-007 25.80 30.30 4.50 2.30 3.95 17

Including 25.80 26.30 0.50 1.73

and 27.30 27.80 0.50 5.62

and 29.30 29.80 0.50 12.25

and 29.80 30.30 0.50 1.09