1. Measured and Indicated Mineral Resources are reported inclusive of Mineral Reserves.

Resource Estimates

1. Measured and Indicated Mineral Resources are reported inclusive of Mineral Reserves.

www.oceanagold.com 1

NEWS RELEASE

February 18, 2026

OceanaGold Reports Mineral Reserves and Resources

for the Year Ended 2025

VANCOUVER, BC – OceanaGold Corporation (TSX: OGC) (OTCQX: OCANF) (“OceanaGold” or the

“Company”) is pleased to provide its Mineral Reserves and Mineral Resources statement for the year

ended December 31, 2025.

Highlights

• Total Mineral Reserves of 5.83 million ounces of gold (“Moz Au”) across its four operating assets.

• Total Measured and Indicated Resources of 8.63 Moz Au1 and Inferred Resources of 2.5 Moz Au.

• An initial underground Mineral Reserve of 0.44 Moz gold declared for Ledbetter Underground (“LUG”),

Haile has removed lower margin open pit ounces while increasing asset Net Present Value (“NPV”) by

determining that Ledbetter will be best advanced as an underground mine.

• Gold price assumption increased to a prudent $2,200/oz for reserves and $2,450/oz for resources.

• Reserve additions were driven by open pit extensions at Macraes, supported by a higher gold price that

extends mine life to 2032, and increases at the Horseshoe Underground at Haile.

• At Wharekirauponga , 0.16 Moz of Inferred Resources was added , while a significant increase in

resource conversion and growth drilling is planned for 2026.

• NI 43 -101 Technical Reports for Haile and Macraes w ill be released by March 31, 2026 providing

updated life-of mine plans based on Mineral Reserves only. The Didipio NI 43-101 Technical report will

be released in the first half of 2026.

Gerard Bond, President and CEO of OceanaGold, said " Our 2025 Reserves and Resources reflect the

value added through our successful exploration efforts in 2025, particularly at Horseshoe Underground

at Haile and Wharekirauponga Underground at Waihi. The technical work to convert the final open pit

phase at Ledbetter to an underground Reserve at Haile resulted in increasing Haile’s NPV . We are

recognizing the benefits of operating in a higher gold price environment with the addition of 5 years mine

life at Macraes, while maintaining a prudent $2,200 per ounce Reserve gold price assumption to ensure

we produce profitable gold. We have a tremendous track record of organically growing our Reserve and

Resources through exploration and we are increasing our investment in explorat ion by 50%, with a

planned expenditure of $60M in 2026.”

2

Updated Mine Plans for Haile and Macraes

The updated Mineral Reserves for Haile reflects a change in mining method for the final Ledbetter open

pit phase ( Phase 4) to an underground mine. This change removes low-margin open pit ounces while

improving the NPV of Haile. Beyond the economic benefits, the transition to underground also provides

operational benefits, including significantly less waste movement, less rehandle, lower greenhouse gas

emissions and lower tailings facility capacity requirements. In the upcoming technical report mine plan,

LUG portal construction commences in 2028, with first development ore expected in 202 9 and steady-

state production expected in 20 30. First ore from the Palomino Underground (“PUG”) remains on

schedule for 2028. Mine life for the site will be extended to 2036.

Haile is expected to produce on average 210,000 ounces of gold per year from 2027 through 2031,

providing the mine a more sustainable, de-risked production profile as compared to the previous

technical report. Notably, open pit mining continues at Haile across the other open pits until 2033, which

remain part of the planned mining sequence in conjunction with the underground operation.

The increased reserves at Macraes reflects the leverage the mine has to a higher gold price , with

previously marginal open pits becoming economic in a rising gold price environment , resulting in the

addition of 5 years of reserve mine life. Applying a $2,200 gold price assumption (compared to $1,750

previously), additional open pit cutbacks were economic at Innes Mills, Coronation, Coronation North

and Golden Bar , which, in conjunction with the Golden Point Underground , extends the mine life at

Macraes to 2032.

Updated National Instrument 43-101 – Standards o f Disclosure for Mineral Projects (“ NI 43 -101”)

technical reports for Haile and Macraes will be filed on SEDAR+ by the end of March 2026 and will include

life-of-mine plans, capital and costs estimates based on Mineral Reserv es only. The Didipio NI 43 -101

Technical report will be released in the first half of 2026.

Mineral Reserves

Mineral Reserves total 5.83 Moz, representing a net decrease of 0.39 Moz from the prior year (see Figure

1). The change was mainly driven by Haile, where reserves declined due to depletion and the change in

mining method at LUG from an open pit to an underground mine , which removes lower margin open pit

inventory while improving overall asset NPV . This was partially offset by additions at depth in the

3

Horseshoe Underground. Additionally, higher gold price assumptions allowed for multiple new open pit

phases at Macraes.

Figure 1: Changes to Proven and Probable Reserves

Notes:

• "Depletion" refers to 2025 mining depletion.

• "Reserve Model Updates" represent drilling and/or model updates to reserve or initial reserve declarations.

• "Economic Factors" relate to gold price, mining cost and cut-off grade changes.

• "Adjustments" relate to changes not captured in other categories. This includes the LUG mining method change.

4

The Proven and Probable Mineral Reserves estimates as at December 31, 2025 are presented in Table 1 below.

Table 1: Proven and Probable Reserves as at December 31, 2025

Proven Probable Proven & Probable

Gold

Tonnes

(Mt)

Au

(g/t)

Contained

Ozs (Moz)

Tonnes

(Mt)

Au

(g/t)

Contained

Ozs (Moz)

Tonnes

(Mt)

Au

(g/t)

Contained

Ozs (Moz)

Haile

Horseshoe Underground 1.52 4.39 0.21 2.63 4.24 0.36 4.14 4.29 0.57

Palomino Underground - - - 3.62 2.96 0.34 3.62 2.96 0.34

Ledbetter Underground - - - 4.00 3.39 0.44 4.00 3.39 0.44

Open Pits 2.47 1.23 0.10 16.1 1.62 0.84 18.6 1.57 0.94

Haile Total 3.99 2.43 0.31 26.3 2.33 1.98 30.3 2.35 2.29

Didipio

Didipio Underground 13.5 1.39 0.60 14.7 0.85 0.40 28.3 1.11 1.01

Didipio Open Pit Stockpile 13.2 0.30 0.13 - - - 13.2 0.30 0.13

Didipio Total 26.7 0.85 0.73 14.7 0.85 0.40 41.5 0.85 1.13

Macraes

Macraes Underground 0.04 2.01 0.00 2.57 1.90 0.16 2.62 1.90 0.16

Macraes Open Pit 11.5 0.55 0.20 19.7 0.64 0.40 31.2 0.61 0.61

Macraes Total 11.5 0.56 0.21 22.3 0.78 0.56 33.8 0.71 0.77

Waihi

Martha Underground - - - 3.43 3.85 0.42 3.43 3.85 0.42

Wharekirauponga - - - 4.10 9.20 1.21 4.10 9.20 1.21

Waihi Total - - - 7.53 6.76 1.64 7.53 6.76 1.64

Total Gold 42.3 0.92 1.25 70.9 2.01 4.58 113 1.60 5.83

Proven Probable Proven & Probable

Silver

Tonnes

(Mt)

Ag

(g/t)

Contained

Ozs (Moz)

Tonnes

(Mt)

Ag

(g/t)

Contained

Ozs (Moz)

Tonnes

(Mt)

Ag

(g/t)

Contained

Ozs (Moz)

Haile

Horseshoe Underground 1.52 1.5 0.1 2.63 1.8 0.2 4.14 1.7 0.2

Palomino Underground - - - 3.62 2.7 0.3 3.62 2.7 0.3

Ledbetter Underground - - - 4.00 11 1.3 4.00 11 1.3

Open Pits 2.47 2.1 0.2 16.1 2.3 1.2 18.6 2.2 1.3

Haile Total 3.99 1.9 0.2 26.3 3.5 3.0 30.3 3.3 3.2

Didipio

Didipio Underground 13.5 1.7 0.7 14.7 1.3 0.6 28.3 1.5 1.4

Didipio Open Pit Stockpile 13.2 1.9 0.8 - - - 13.2 1.9 0.8

Didipio Total 26.7 1.8 1.6 14.7 1.3 0.6 41.5 1.7 2.2

Waihi

Martha Underground - - - 3.43 17 1.9 3.43 17 1.9

Wharekirauponga - - - 4.10 16 2.1 4.10 16 2.1

Waihi Total - - - 7.53 17 4.0 7.53 17 4.0

Total Silver 30.7 1.8 1.8 48.6 4.9 7.6 79.3 3.7 9.5

Proven Probable Proven & Probable

Copper

Tonnes

(Mt)

Cu

(%)

Contained

Tonnes

(Mt)

Tonnes

(Mt)

Cu

(%)

Contained

Tonnes

(Mt)

Tonnes

(Mt)

Cu

(%)

Contained

Tonnes

(Mt)

Didipio

Didipio Underground 13.5 0.38 0.05 14.7 0.31 0.05 28.3 0.35 0.10

Didipio Open Pit Stockpile 13.2 0.28 0.04 - - - 13.2 0.28 0.04

Didipio Total 26.7 0.33 0.09 14.7 0.31 0.05 41.5 0.32 0.13

Total Copper 26.7 0.33 0.09 14.7 0.31 0.05 41.5 0.32 0.13

5

Notes:

• Mineral Reserves are defined by mine designs based upon the following assumptions: metal prices of US$ 2,200/oz gold, US$4.00/lb copper

and US$25/oz silver; NZD/USD exchange rate of 0.60.

• Reported estimates of contained metal are not depleted for processing losses.

• For underground reserves, cut-offs applied to diluted grades.

• Mineral Reserves are reported on a 100% basis. OceanaGold holds an 80% attributable interest in the Didipio Mine.

• Haile:

o Open Pit: the primary cut-off grade is 0.5 g/t Au, while oxide material is assigned a cut-off grade of 0.6 g/t Au.

o Underground: the cut-off grade is 1.86 g/t Au.

• Didipio:

o Gold equivalence (AuEq) is based upon the presented gold and copper prices as well as processing recoveries. AuEq = Au g/t + 1.27 x Cu%.

o The 13.2 Mt surface stockpile inventory includes 5.3 Mt of low-grade stocks mined at an approximate cut-off grade of 0.27 g/t AuEq.

o Underground: cut-off grade of 1.16 g/t AuEq is used. Incremental stopes proximal to development already planned to access main stoping

areas are reported to a lower cut-off grade of 0.76 g/t AuEq

• Macraes:

o Open Pit: Primary cut-off grade is 0.25 g/t while Golden Bar is 0.30 g/t

o Underground: Golden Point cut-off grade is 1.08 g/t Au. Stopes for which access already exists are reported to a lower cut-off grade of 0.94

g/t.

• Waihi:

o Martha Underground cut-off grade for previously unmined stoping areas is 2. 60 g/t Au, increasing to 3. 2 g/t Au for stoping areas in close

proximity to remnant workings.

o Wharekirauponga Underground cut-off grade for stopes is 2.40 g/t Au.

Mineral Resources

Measured and Indicated Resources (inclusive of reserves) total 8.63 Moz, a net decrease of 0.31 Moz from

the prior year (Figure 2). The change was mainly driven by mining depletion at all operations, and at Haile,

resources decreased due to the change in mining method of Ledbetter to an underground mine. This was

partially offset by growth at Macraes, where resources increased as higher gold price assumptions

allowed for multiple open pit expansions , with increases from model updates at Innes Mills and

Coronation particularly contributing to growth. Additional increases came from the Horseshoe

Underground at Haile and from Waihi, with increases at Wharekirauponga.

6

Figure 2: Changes to Measured and Indicated Resources

Notes:

• "Depletion" refers to 2025 mining depletion.

• "Resource Model Updates" represent drilling and/or model updates to reserve or initial reserve declarations

• "Economic Factors" relate to gold price, mining cost and cut-off grade changes.

• "Adjustments" relate to changes not captured in other categories.

Inferred Resources total 2.5 Moz, a net increase of 0.3 Moz from the prior year (Figure 3). The increase was

largely driven by additions at Wharekirauponga Underground at Waihi, gold price -related open pit

expansions at Macraes and additions at depth at Didipio, offsetting the decreases from Inferred

Resources conversion.

Figure 3: Changes to Inferred Resources

Notes: See notes for figure 1.

The Measured, Indicated and Inferred Mineral Resource estimates (inclusive of Mineral Reserves) as of

December 31, 2025 are presented in Table 2 below.

7

Table 2: Measured, Indicated and Inferred Resources as of December 31, 2025

Gold

Measured Indicated Measured & Indicated Inferred

Tonnes

(Mt)

Au

(g/t)

Contained

Ozs (Moz)

Tonnes

(Mt)

Au

(g/t)

Contained

Ozs (Moz)

Tonnes

(Mt)

Au

(g/t)

Contained

Ozs (Moz)

Tonne

s (Mt)

Au

(g/t)

Contained

Ozs (Moz)

Haile

Horseshoe

Underground 1.98 5.11 0.33 2.76 5.11 0.45 4.74 5.11 0.78 0.5 2.7 0.0

Palomino

Underground . . . 4.19 3.38 0.45 4.19 3.38 0.45 0.8 2.5 0.1

Ledbetter

Underground . . . 4.07 4.12 0.54 4.07 4.12 0.54 1.2 2.9 0.1

Open Pits 2.58 1.21 0.10 16.1 1.64 0.85 18.7 1.58 0.95 0.6 0.9 0.0

Haile Total 4.56 2.91 0.43 27.1 2.63 2.30 31.7 2.67 2.72 3.1 2.4 0.2

Didipio

Didipio

Underground 14.3 1.53 0.71 17.7 0.89 0.51 32.0 1.18 1.21 9.2 0.9 0.3

Open Pit

Stockpiles 13.2 0.29 0.12 . . . 13.2 0.29 0.12

Didipio Total 27.5 0.94 0.83 17.7 0.89 0.51 45.2 0.92 1.34 9.2 0.9 0.3

Macraes

Macraes

Underground 0.08 3.02 0.01 6.37 2.28 0.47 6.45 2.29 0.47 2.4 1.8 0.1

Open Pits 12.6 0.62 0.25 35.7 0.67 0.76 48.3 0.65 1.01 25 0.7 0.5

Macraes Total 12.7 0.63 0.26 42.1 0.91 1.23 54.8 0.85 1.49 27 0.8 0.7

Waihi

Martha

Underground 6.33 5.24 1.07 6.33 5.24 1.07 2.2 4.6 0.3

Wharekirauponga 2.63 17.3 1.46 2.63 17.3 1.46 2.9 8.5 0.8

Open Pits 9.72 1.78 0.56 9.72 1.78 0.56 3.2 1.8 0.2

Waihi Total 18.7 5.13 3.08 18.7 5.13 3.08 8.3 4.9 1.3

Total Gold 44.8 1.05 1.51 106 2.10 7.11 150 1.78 8.63 48 1.6 2.5

Silver

Measured Indicated Measured & Indicated Inferred

Tonnes

(Mt)

Ag

(g/t)

Contained

Ozs (Moz)

Tonnes

(Mt)

Ag

(g/t)

Contained

Ozs (Moz)

Tonnes

(Mt)

Ag

(g/t)

Contained

Ozs (Moz)

Tonne

s (Mt)

Ag

(g/t)

Contained

Ozs (Moz)

Haile

Horseshoe

Underground 1.98 1.9 0.1 2.76 2.1 0.2 4.74 2.0 0.3 0.5 1.0 0.0

Palomino

Underground . . . 4.19 2.8 0.4 4.19 2.8 0.4 0.8 2.1 0.1

Ledbetter

Underground . . . 4.07 12 1.6 4.07 12 1.6 1.2 7.5 0.3

Open Pits 2.58 2.5 0.2 16 .1 2.5 1.3 18.7 2.5 1.5 0.6 2.4 0.0

Haile Total 4.56 2.2 0.3 27.1 4.0 3.5 31.7 3.7 3.8 3.1 4.0 0.4

Didipio

Didipio

Underground 14 .3 1.8 0.8 17.7 1.4 0.8 32.0 1.6 1.6 9.2 1.2 0.4

Open Pit

Stockpiles 13 .2 1.9 0.8 . . . 13.2 1.9 0.8

Didipio Total 27.5 1.8 1.6 17.7 1.4 0.8 45.2 1.7 2.4 9.2 1.2 0.4

Waihi

Martha

Underground 6.33 20 4.1 6.33 20 4.1 2.2 24 1.7

Wharekirauponga 2.63 27 2.3 2.63 27 2.3 2.9 13 1.2

Open Pits 9.72 10 3.2 9.7 10 3.2 3.2 9.6 1.0

Waihi Total 18.7 16 9.6 18.7 16 9.6 8.3 15 3.9

Total Silver 32 .1 1.9 1.9 63.5 6.8 14 95.6 5.1 16 21 7.1 4.7

8

Copper

Measured Indicated Measured & Indicated Inferred

Tonnes

(Mt)

Cu

(%)

Contained

Tonnes

(Mt)

Tonnes

(Mt)

Cu

(%)

Contained

Tonnes

(Mt)

Tonnes

(Mt)

Cu

(%)

Contained

Tonnes

(Mt)

Tonne

s (Mt)

Cu

(%)

Contained

Tonnes

(Mt)

Didipio

Didipio

Underground 14.3 0.43 0.06 17.7 0.33 0.06 32.0 0.37 0.12 9.2 0.3 0.02

Open Pit

Stockpiles 13.2 0.28 0.04 . . . 13.2 0.28 0.04

Didipio Total 27.5 0.36 0.10 17.7 0.33 0.06 45.2 0.35 0.16 9.2 0.3 0.02

Total Copper 27.5 0.36 0.10 17.7 0.33 0.06 45.2 0.35 0.16 9.2 0.3 0.02

Notes:

• Mineral Resources are reported inclusive of Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have dem onstrated

economic viability.

• All resources are based on the following assumptions: metal prices of US$2,450/oz gold, US$4.50/lb copper and US$28.50/oz silver; NZD/USD

exchange rate of 0.60.

• Macraes Open Pit resources are constrained by optimised shells based upon economic assumptions above. Waihi Open Pit resources reported

within a pit design limited by infrastructural considerations. Haile Open Pit resources reported within the reserve design pit.

• Underground resources are reported within volumes guided by conceptual stope designs which are based upon economic assumptions above

and exclude dilution.

• Mineral Resources are reported on a 100% basis. OceanaGold holds an 80% attributable interest in the Didipio Mine.

• Haile

o Open Pit primary cut -off grade is 0.50 g/t Au, while oxide cut -off grade is 0.60 g/t Au. Horseshoe, Ledbetter and Palomino underground

resources at 1.70 g/t Au cut-off.

• Didipio

o 13.2 Mt surface stockpile inventory based on mining cut-off grades at the time ranging from 0.27 g/t to 0.40 AuEq.

o Underground resources reported at a cut-off grade of 0.67 g/t AuEq between the 2,460mRL and 1,800mRL with AuEq cut-off grade based

on presented gold and copper prices. AuEq = Au g/t + 1.27 x Cu %.

• Macraes

o Open Pits cut-off grades between 0.25 g/t Au and 0.40 g/t Au.

o Golden Point underground cut-off grade is 0.97 g/t Au.

• Waihi

o Martha underground cut-off grade is 2.15 g/t Au, Wharekirauponga cut-off grade is 1.70 g/t Au.

o Martha Open Pit cut-off grade is 0.5 g/t Au and Gladstone Open Pit cut-off grade is 0.56 g/t Au.