Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

OCO.V ·

Santo Tomas Drilling Success Continues

Drill Results

January 13, 2022 NEWS RELEASE

SANTO TOMAS DRILLING SUCCESS CONTINUES

VANCOUVER, British Columbia – (Janua ry 12, 2022) Oroco Resource Corp. ( TSX-V: OCO, OTC:

ORRCF) (“Oroco” or “the Company” ) is pleased to announce the receipt of additional assay results from

its drilling campaign at the Santo Tomas property (the “Property”) in northwestern Mexico, having received

the drill results from Holes N004 to N008 in the North Zone deposit. Assay results through the first eight drill

holes have now been received (see Table 1, below, and Figure 1, attached or at the Company’s website Figure

1).

Notably, the best intersection in the 2021 drill program was returned by drill hole N008: a true thickness of

328.3 m of 0.45% Copper Equivalent (see Table 1). A nearby hole, N004, was drilled to test the strong

Chargeability anomaly that extends westward from N008 and the known Nort h Zone deposit. A zone of

Laramide intrusion and altered and c opper mineralized volcanic rocks in N 004 confirms the prospectivity of

the strong Chargeability anomaly, more than doubling the width of the North Zone deposit target at the 200 m

elevation, (see Figure 2, attached or Figure 2). This newly confirmed target lies on the western flank of the

North Zone deposit, concealed beneath a blanket of limestone beds.

Table 1: Significant Assay Intervals in the Santo Tomas 2021 Program, Holes N001 to N008:

Drill Hole 

No. 

From 

(m) 

To 

(m) 

Length 

(m)  Cu %  Mo %  Au g/t  Ag g/t*  CuEQ % 

N001  272.6  299.6  27.0  0.18  0.012  0.018  0.82  0.24 

"  310.0  565.0  255.0  0.39  0.010  0.045  2.20  0.46 

"  571.0  620.0  49.0  0.17  0.003  0.008  1.31  0.18 

N002  349.9  630.0  280.1  0.38  0.012  0.025  2.85  0.44 

N003  295.0  306.8  11.8  0.31  0.009  0.014  2.85  0.36 

"  315.3  333.0  17.7  0.33  0.008  0.017  1.49  0.37 

"  339.0  364.5  25.5  0.29  0.015  0.020  2.81  0.36 

"  370.0  384.3  14.3  0.50  0.008  0.026  3.33  0.56 

"  390.0  597.7  207.7  0.39  0.014  0.019  2.82  0.45 

"  601.8  678.0  76.2  0.18  0.002  0.007  2.53  0.20 

N004  434.3  498.0  63.7  0.38  0.012  0.017  2.12  0.44 

N006  31.0  219.5  188.5  0.39  0.004  0.051  2.29  0.44 

"  223.4  277.0  53.7  0.17  0.005  0.011  1.55  0.20 

N007  213.9  405.2  191.3  0.32  0.005  0.029  2.93  0.37 

"  408.1  518.0  109.9  0.32  0.012  0.018  3.06  0.38 

N008  159.8  488.0  328.3  0.38  0.010  0.038  2.60  0.45 

Cu Equivalent (CuEq) % = Cu % + (Mo %*3.75) + (Au ppm*0.752). The commodity prices (3-year

Average) used are in $US: Cu $3.20 /lb, Mo $12.00 /lb, and Au $1,650.00 /troy oz. * Ag values are not

used in the CuEq calculations.

OROCO RESOURCE CORP.

1201-1166 Alberni Street, Vancouver, BV V6E 3Z3

T: 604.688.6200 F: 604.688.6260

www.orocoresourcecorp.com

 Drill Holes N001 to N003 and N005 to N011 were drilled to test the North Zone deposit perpendicular

to its structural attitude. Core intervals for those holes are within approximately 10% of true

thicknesses.

 Hole N004 was drilled to test a geophysical target a nd did not test the North Zone deposit. Core

intervals are not true thickness for that hole.

 Hole N005 was ended early, in uns table ground at 38m depth. Ho le N006 was collared adjacent to

that of N005 and was drilled to completion.

 Holes N009 to N011 in the North Zone and B001 in the Brasiles Zone are completed.

Before ending drilling operations for the seasonal break, 12 drill holes were completed (11 in the North Zone),

totalling 8,455 m of diamond drilling, mostly in HQ core size. Drilling operations will re-commence on the

North Zone within two weeks. Drilling on the Brasiles Zone has re-commenced with Hole B002, which was

in progress prior to the break.

The Company is very pleased that drilling results continue to confirm the following:

 Copper grades in holes N001 to N003, and N006 to N008 are comparable to the historical drilling

reported on each of the cross-sections drilled to date (see Figures 1 to 6, attached or Figures 1-6).

Results continue to confirm the geological conclusions and the 2009 Gradeshell model of Cu > 0.3%

(the “2009 Gradeshell Model”) contained in the current Technical Report (the “Technical Report”)

(Bridge, 2019: See SEDAR, or the Company’s website

www.orocoresourcecorp.com/projects/technical-reports/).

 Geological logging indicates copper is present as ch alcopyrite and bornite dissemination and vein

fillings. Pyrite is relatively sparse in the main drill intersections. Sulphide mineralization in the main

intersections on the North Zone are hosted in st rongly potassic-altered volcanic and intrusive rocks

with an overprint of phyllic alteration.

 Molybdenum, gold, and silver are elevated in the core across the width of the North Zone and provide

an approximate 15% contribution to the copper equiva lent grade, without factoring for metallurgical

recoveries.

 Fracturing, Laramide intrusive dikes, mylonite zones, veining and sulphide mineralization are

controlled by faulting co-eval with the formation of the North Zone deposit. The deposit is confirmed

in drilling to have a strike of N20°E and a dip of 50-55°W, as reported in the Technical Report.

The Santo Tomas Cu-Mo-Au porphyry deposit is an example of the geologic style of Laramide-age porphyry

copper deposits in the southwestern United States and northwestern Mexico. Historical Pre-Feasibility

Studies, recent 3D modelling of historical drilling and several new programs of geophysical surveying have

defined drill targets both for confirmation of historic al mineral resource estimates and for exploration for

additional resources.

The 2021 drill program commenced on the central North Zone mineral deposit and has now spanned 600 m of

strike length on the North Zone. Historical drilling from 1968 to 1994 was primarily vertical and unsuited to

defining the full width and depth of the North Zone. The 2021 program is based on angled drill holes oriented

perpendicular to the re-modelled strike and dip of the deposit and is the first program that features drill holes

that pass from the hanging wall of the North Zone deposit into the footwall and which also features a full suite

of assay information that includes copper, molybdenum, gold and silver.

Drilling confirms that the North Zone is comprised of intensely fractured, potassic- and phyllic-altered andesite

volcanics and Laramide-age porphyritic intrusive dike s. Elevated Mo, Au an d Ag accompany copper assays

along the central axis of the North Zone. Pyrite is relatively low in the core of the North Zone, explaining the

IP response that is in the mid-range of the Chargeability High responses on the Property. In contrast, drilling

into the footwall of the North Zone consistently intersected propylitic-altered andesite. The footwall contains

OROCO RESOURCE CORP.

1201-1166 Alberni Street, Vancouver, BV V6E 3Z3

T: 604.688.6200 F: 604.688.6260

www.orocoresourcecorp.com

abundantly disseminated and vein pyrite, explaining the pronounced Chargeability High and a corresponding

Resistivity Low in the 3D IP modelling.

TECHNICAL INFORMATION AND QUALITY CONTROL & QUALITY ASSURANCE

The historical drilling data employed in this current exploration program was the subject of Data Verification

procedures cited in the current Technical Report. Add itional drill collar verifications were performed in the

current program and collar locations fit closely to th e 2021 survey control. Appropriate QA/QC protocols

governed geological logging, core sampling, sample pr eparation, analyses, and security during the current

program, including quality controls with duplicates, st andards, and blanks. Samp les were submitted to the

Mexican division of ALS Limited in Hermosillo, Mexico, for sample preparation to pulps. Sample pulps are

then sent to ALS Canada Ltd. in Vancouver, Canada, for analysis. Total coppe r and molybdenum contents

are determined by four-acid digestion with AAS finish . Gold was determined by fire assay of a 50-gram

charge, or alternately, for a 30-gram charge (1 Assay ton).

QUALIFIED PERSON

Mr. Paul McGuigan, P. Geo., of Cambria Geosciences Inc., a “Qualified Person” (as defined in NI 43-101 -

Standards for Disclosure for Mineral Projects ) and a senior consulting geosci entist to the Company, has

reviewed and approved the technical disclosures in this news release.

ABOUT OROCO:

The Company holds a net 73.2% interest in the collec tive 1,172.9 ha Core Concessions of the Santo Tomas

Project in NW Mexico. The Company also holds a 77. 5% interest in 7,807.9 ha of mineral concessions

surrounding and adjacent to the Core Concessions (for a total project area of 22,192 acres). The Project is

situated within the Santo Tomas District, which extends from Santo Tomas up to the Jinchuan Group’s

Bahuerachi project, approximately 14 km to the north-east. Santo Tomas hosts a significant copper porphyry

deposit defined by prior exploration spanning the peri od from 1968 to 1994. During that time, the property

was tested by over 100 diamond and reverse circulation drill holes, totaling approximately 30,000 meters.

Based on data generated by these drill programs, a historical Prefeasibility Study was completed by Bateman

Engineering Inc. in 1994.

The Santo Tomas Project is located within 160km of the Pacific deep -water port at Topolobampo and is

serviced via highway and proximal rail (and parallel corridors of trunk grid power lines and natural gas)

through the city of Los Mochis to the northern city of Choix. The property is reached by a 32 km access road

originally built to service Goldcorp’s El Sauzal Mine in Chihuahua State.

For further information, please contact:

Mr. Craig Dalziel, CEO

Oroco Resource Corp.

Tel: 604-688-6200

www.orocoresourcecorp.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of

the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward Looking Information

This news release includes certain “forward-looking information” and “forward-looking statements” (collectively

“forward-looking statements”) within the meaning of applicable Canadian securities legislation. All statements, other

than statements of historical fact included herein, including without limitation, statements relating to future events or

achievements of the Company, are forward-looking statements. There can be no assurance that such forward-looking

statements will prove to be accurate, and actual results and future events could differ materially from those anticipated

OROCO RESOURCE CORP.

1201-1166 Alberni Street, Vancouver, BV V6E 3Z3

T: 604.688.6200 F: 604.688.6260

www.orocoresourcecorp.com

or implied in such statements. Many factors, both known and unknown, could cause actual results, performance or

achievements to be materially different from the results, performance or achievements that are or may be expressed

or implied by such forward-looking statements. Reader s should not place undue reliance on the forward-looking

statements and information contained in this news releas e concerning these matters. Oroco does not assume any

obligation to update the forward-looking statements should they change, except as required by law.