Santo Tomás Project Presentation
April 15, 2025 NEWS RELEASE
SANTO TOMÁS PROJECT PRESENTATION
VANCOUVER, British Columbia – Oroco Resource Corp. (TSX-V: OCO, OTC: ORRCF) (“Oroco”
or the “Company”). Last week Oroco presented at the Mexican Discoveries 2025 Conference to update
the Mexico resource sector on our corporate progr ess and the planned commencement of environmental
baseline studies and the community consultation process relating to the Santo Tomas Project.
As a part of a general corporate update, Oroco is participating in a Webinar hosted by Red Cloud Securities
Inc. tomorrow, April 16 th at 2:00pm EDT. Interested particip ants may register for the Webinar titled
“Oroco Resource Corp.: Why Santo Tomas is the most buildable Copper Asset in the Americas” via
https://redcloudfs.com/events/rcwebinar-oco/. We look forward to updating present and prospective
shareholders regarding Oroco’s near-term priorities and plans.
“The results of our recent meetings with Mexican federal and state officials have prompted the immediate
commencement of our environment baseline studies and the community consultation process,” stated Craig
Dalziel, Oroco’s Executive Chairman. “Now that th e Mexican government support for the Santo Tomas
Project has been made clear, we are confident that development activity can now resume, beginning with
the environmental and social programs which are essential to the project’s permitting process.”
ABOUT OROCO
The Company holds a net 85.5% interest in those ce ntral concessions that comprise 1,173 hectares “the
Core Concessions” of The Santo Tomas Project, located in northwestern Mexico. The Company also holds
an 80% interest in an additional 7,861 hectares of mineral concessions surrounding and adjacent to the Core
Concessions (for a total Project area of 9,034 hectares, or 22,324 acres). The Project is situated within the
Santo Tomas District, which extends up to the Jinchuan Group’s Bahuerachi Project, approximately 14 km
to the northeast. The Project hosts significant c opper porphyry mineralization initially defined by prior
exploration spanning the period from 1968 to 1994. During that time, the Project area was tested by over
100 diamond and reverse circulation drill holes, tota ling approximately 30,000 meters. Commencing in
2021, Oroco conducted a drill program (Phase 1) at Santo Tomas, with a resulting total of 48,481 meters
drilled in 76 diamond drill holes.
The drilling and subsequent resource estimates and engineering studies led to a revised MRE and an updated
PEA being published and filed in August of 2024, wh ich studies are available at the Company’s website
www.orocoresourcecorp.com and by reviewing the Company profile on SEDAR+ at www.sedarplus.ca.
The Santo Tomás Project is located within 170 km of the Pacific deep-water port at Topolobampo and is
serviced via highway and proximal rail (and parallel co rridors of trunk grid power lines and natural gas)
through the city of Los Mochis to the northern city of Choix. The property is reached, in part, by a 32 km
access road originally built to service Goldcorp’s El Sauzal Mine in Chihuahua State.
Additional information about Oroco can be found on its website and by reviewing its profile on SEDAR+
at www.sedarplus.ca.
For more information, please contact:
Craig Dalziel, Chairman
Oroco Resource Corp.
Tel: 604-688-6200
Email: [email protected]
www.orocoresourcecorp.com
Neither TSXV nor its Regulation Services Provider (as that term is defined in policies of the TSXV) accepts
responsibility for the adequacy or accuracy of this release.
Cautionary Note Regarding Forward-Looking Information
This news release includes certain “forward-look ing information” and “forward-looking statements”
(collectively “forward-looking statements”) with in the meaning of applicable Canadian securities
legislation. All statements, other than statements of historical fact included herein, including, without
limitation, statements relating to future events or achievements of the Company, and the use of funds from
the Offering, are forward-looking statements. There is no assurance that the proceeds of the Offering will
be expended as contemplated. Many factors, both known and unknown, coul d cause actual results,
performance or achievements to be materially different from the results, performance or achievements that
are or may be expressed or implie d by such forward-looking statements. Readers should not place undue
reliance on the forward-looking statements and information contained in this news release concerning these
matters. Oroco does not assume any obligation to upd ate the forward-looking statements should they
change, except as required by law.