Oroco Closes Non-Brokered Private Placement
March 17, 2023 NEWS RELEASE
OROCO CLOSES NON-BROKERED PRIVATE PLACEMENT
VANCOUVER, British Columbia – (March 17, 2023) Oroco Resource Corp. (TSX-V: OCO, OTC:
ORRCF) (“Oroco” or “the Company”) is pleased to announce that it has closed a non-brokered
private placement (the “ Private Placement ”) raising gross proceeds of $4,758,727.55 through
the sale of a total of 6,344,970 units at a price of $0.75 per unit. Each unit consists of one share
and one-half of one share purchase warrant. Each whole share purchase warrant entitles the
holder to purchase one share for a period of 24 months from closing at a price of $1.05 per share.
The shares and any shares issued pursuant to the exercise of the warrants are subject to a hold
period expiring July 18, 2023.
ATM Mining Corp. (ATM”), a company controlled by Craig Dalziel, Executive Chairman of the
Company, participated in the Private Placement, purchasing 200,000 units. ATM’s participation
in the Private Placement is exempt from the valuation and minority shareholder approval
requirements of Multilateral Instrument 61-101 as the fair market value of it’s participation is
less than 25% of the market capitalization of the Company.
The Company paid a total of: (i) $78,500 cash; (ii) 60,000 common shares: (iii) 10,000 share
purchase warrants which entitle the holder to purchase one share for two years at a price of
$0.75; and (iv) 50,000 share purchase warrants which entitle the holder to purchase one share
for two years at a price of $1.05 per share, in finder’s fees to RFC Ambrian Limited and Vertigo
Partners Ltd. in connection with the Private Placement.
The proceeds of the financing will be used for exploration and development activities, working
capital and corporate overhead.
ABOUT OROCO:
The Company holds a net 85.5% interest in the collective 1,172.9 ha Core Concessions of the
Santo Tomas Project in NW Mexico. The Company also holds an 80% interest in 8,154.3 ha of
mineral concessions surrounding and adjacent to the Core Concessions (for a total project area
of 23,048 acres). The Project is situated within the Santo Tomas District, which extends from
Santo Tomas up to the Jinchuan Group’s Bahuerachi project, approximately 14 km to the
northeast. Santo Tomas hosts a significant copper porphyry deposit defined by prior exploration
spanning the period from 1968 to 1994. During that time, the property was tested by over 100
diamond and reverse circulation drill holes, totalling approximately 30,000 meters. Based on
data generated by these drill programs, a historical Prefeasibility Study was completed by
Bateman Engineering Inc. in 1994. The Company is nearing the completion of its 2021-2023 drill
program at Santo Tomas with a total of approximately 49,000 meters drilled in 76 diamond drill
holes.
OROCO RESOURCE CORP.
1201-1166 Alberni Street, Vancouver, BC V6E 3Z3
T: 604.688.6200 F: 604.688.6260
www.orocoresourcecorp.com
The Santo Tomas Project is located within 160 km of the Pacific deep-water port at Topolobampo
and is serviced via highway and proximal rail (and parallel corridors of trunk grid power lines and
natural gas) through the city of Los Mochis to the northern city of Choix. The property is reached
by a 32 km access road originally built to service Goldcorp’s El Sauzal Mine in Chihuahua State.
For further information, please contact:
Richard Lock, CEO
Oroco Resource Corp.
Tel: 604-688-6200
Email: [email protected]
www.orocoresourcecorp.com
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this
release.
Cautionary Note Regarding Forward-Looking Information
This news release includes certain “forward-looking information” and “forward-looking
statements” (collectively “forward-looking statements”) within the meaning of applicable
Canadian securities legislation. All statements, other than statements of historical fact included
herein, including, without limitation, statements relating to future events or achievements of the
Company, are forward-looking statements. There can be no assurance that such forward-looking
statements will prove to be accurate, and actual results and future events could differ materially
from those anticipated or implied in such statements. Many factors, both known and unknown,
could cause actual results, performance or achievements to be materially different from the
results, performance or achievements that are or may be expressed or implied by such forward-
looking statements. Readers should not place undue reliance on the forward-looking statements
and information contained in this news release concerning these matters. Oroco does not assume
any obligation to update the forward-looking statements should they change, except as required
by law.