Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

OCO.V ·

Melbourne, Australia, to undertake a Strategic Option Study (the “Study”) for Oroco’s Santo Tomás porphyry copper project in northwestern Mexico. Strategic Option Study Overview

Corporate Updates

July 2, 2025 NEWS RELEASE

Oroco Engages Whittle Consulting Ltd.

Vancouver, BC – July 2, 2025 – Oroco Resource Corp. (TSX-V: OCO; OTC: ORRCF) (“Oroco”

or the “Company”) is excited to announce that it has retained Whittle Consulting Ltd., based in

Melbourne, Australia, to undertake a Strategic Option Study (the “Study”) for Oroco’s Santo

Tomás porphyry copper project in northwestern Mexico.

Strategic Option Study Overview

Whittle Consulting Ltd. (“Whittle”) will collaborate with Oroco’s team to evaluate innovative

operating strategies and technologies that have the potential to enhance the Project’s value.

Utilizing Whittle’s “Integrated Strategic Planning” methodology, the Study will employ advanced

cost modeling and system constraint analysis to optimize all facets of the Santo Tomás mining

process, including an expanded North Zone mine plan. Key areas of focus will include:

• Alternative power sources

• Mining fleet electrification

• Processing technologies

• Tailings storage options

These analyses will refine pit size, stripping ratios, and cut-off grades, providing critical guidance

for the upcoming Pre-Feasibility Study (PFS) by identifying optimal operational structures and

technologies for further evaluation.

Data and Expertise

The Study will leverage the existing Mineral Resource Estimate from Oroco’s Q3 2024

Preliminary Economic Assessment (PEA) and the Company’s project database, requiring no

additional data collection. Whittle’s proven track record, with over 120 Enterprise Optimization

studies, demonstrates its ability to significantly improve project economics through its proprietary

“Prober-F” software. This advanced tool integrates Linear Programming with a sophisticated

Search Algorithm, utilizing over 300 computer cores to tackle complex, multi-variable mining

challenges.

Whittle’s team of industry experts brings extensive experience in geology, mining engineering,

metallurgy, finance, and operational modeling, ensuring a comprehensive and practical approach

to optimization.

Payment Structure

Whittle will receive 60% of its consulting fee in Oroco common shares (“Fee Shares”), to be

issued in alignment with the Company’s next equity financing, expected in 2025. The issuance is

subject to TSX Venture Exchange approval.

ABOUT OROCO

The Company holds a net 85.5% interest in those central concessions that comprise 1,173 hectares

“the Core Concessions” of The Santo Tomas Project, located in northwestern Mexico. The

Company also holds an 80% interest in an additional 7,861 hectares of mineral concessions

surrounding and adjacent to the Core Concessions (for a total Project area of 9,034 hectares, or

22,324 acres). The Project is situated within the Santo Tomas District, which extends up to the

Jinchuan Group’s Bahuerachi Project, approximately 14 km to the northeast. The Project hosts

significant copper porphyry mineralization initially defined by prior exploration spanning the

period from 1968 to 1994. During that time, the Project area was tested by over 100 diamond and

reverse circulation drill holes, totaling approximately 30,000 meters. Commencing in 2021, Oroco

conducted a drill program (Phase 1) at Santo Tomas, with a resulting total of 48,481 meters drilled

in 76 diamond drill holes.

The drilling and subsequent resource estimates and engineering studies led to a revised MRE and

an updated PEA being published and filed in August of 2024, which studies are available at the

Company’s website www.orocoresourcecorp.com and by reviewing the Company profile on

SEDAR+ at www.sedarplus.ca.

The Santo Tomás Project is located within 170 km of the Pacific deep -water port at Topolobampo

and is serviced via highway and proximal rail (and parallel corridors of trunk grid power lines and

natural gas) through the city of Los Mochis to the northern city of Choix. The property is reached,

in part, by a 32 km access road originally built to service Goldcorp’s El Sauzal Mine in

Chihuahua State.

Additional information about Oroco can be found on its website and by reviewing its profile on

SEDAR+ at www.sedarplus.ca.

For more information, please contact:

Richard Lock, CEO

Oroco Resource Corp.

Tel: 604-688-6200

Email: [email protected]

www.orocoresourcecorp.com

Neither TSX V nor its Regulation Services Provider (as that term is defined in policies of the

TSXV) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Information

This news release includes certain “forward -looking information” and “forward-looking statements”

(collectively “forward -looking statements”) within the meaning of applicable Canadian securities

legislation. All statements, other than statements of historical fact included herein, including, without

limitation, statements relating to future events or achievements of the Company, and the use of funds from

the Offering, are forward -looking statements. There is no assurance that the proceeds of the Offering will

be expended as contemplated. Many factors, both known and unknown, could cause actual results,

performance or achievements to be materially different from the results, performance or achievements that

are or may be expressed or implied by such forward -looking statements. Readers should not place undue

reliance on the forward -looking statements and information contained in this news release concerning

these matters. Oroco does not assume any obligation to update the forward-looking statements should they

change, except as required by law.