NexGen Significantly Extends Mineralization in the A2 and A3 Shears to the Northeast
NexGen Significantly Extends Mineralization in the A2 and A3 Shears
to the Northeast
Vancouver, BC, February 23, 2017 – NexGen Energy Lt d. (“NexGen” or the “Company”) (TSX:NXE,
OTCQX:NXGEF) is pleased to report the first results from the 35 ,000 m winter 2017 drilling program at our
100% owned, Rook I property, Athabasca Basin, Saskatchewan.
Several drill holes have intersected significant mineralization in previously untested areas located outside the
maiden A2 and A3 resource grade shells of the Arrow Deposit to the northeast, including some of the mo st
intense mineralization encountered in the A3 shear to date.
Highlights:
A2 Shear Northeast Extension
• Drill hole AR-17-119c1 has extended mineralization 120 m to the northeast of the maiden A2
resource grade shell intersecting 21.5 m of total composite mineralization including 1.15 m of total
off-scale radioactivity (>10,000 to 53,000 cps) within a 95.0 m section (485.0 to 580.0 m).
• Scissor hole AR-17-116c2 drilled 35 m northeast from the edge of the maiden A2 grade shell
intersected 47.0 m of total composite mineralization including 3.05 m of total off-scale
radioactivity (>10,000 to >61,000 cps) within a 111.0 m section (642.0 to 753.0 m).
A3 Shear Northeast Extension
• Scissor hole AR-17-116c1 was drilled up-dip and northeast in a previously u ntested area
approximately 45 m to the northeast boundary of the maiden A3 resource grade shell intersecting
64.0 m of total composite mineralization including 6.5 m of total off-scale radioactivity (>10,000 to
>61,000 cps) within an 84.5 m section (425.5 to 510.0 m).
• Scissor hole AR-17-114c2 intersected 54.0 m of total composite mineralization including 6.55 m of
total off-scale radioactivity (>10,000 to >61,000 cps) within a 139.0 m section (437.5 to 576.5 m).
• Scissor hole AR-17-118c1 intersected 55.0 m of total composite mineralization including 6.55 m of
total composite off-scale radioactivity (>10,000 to >61,000 cps) within a 104.0 m section (571.5 to
675.5 m).
A2 High Grade Domain
• Scissor hole AR-17-117c1 (25 m southwest and up-dip from AR-15-44b) interse cted 72.0 m of total
composite mineralization including 11.05 m of total composite off-scale radioactivity (>10,000 to
>61,000 cps) within a 151.5 m section (461.0 to 612.5 m).
• Scissor hole AR-17-114c2 (115 m northeast and down-dip from AR-15-44b) inte rsected 41.0 m of
total composite mineralization including 7.35 m of total composite off-scale radioactivity (>10,000
to >61,000 cps) within a 109.0 m section (626.0 to 735.0 m).
• Scissor hole AR-17-114c1 (87 m northeast and down-dip from AR-15-44b) inter sected 77.0 m of
total composite mineralization including 5.7 m of total composite off-scale radioactivity (>10,000
to >61,000 cps) within a 105.5 m section (607.5 to 713.0 m).
Arrow, Activities & Financial
• The 2017 winter program comprising a minimum of 35, 000 m of drilling with seven drill rigs is
underway.
• An updated NI 43-101 resource estimate on the Arrow Deposit is scheduled for the first half of 2017.
• The Company has cash on hand of approximately $70 million.
The A2 and A3 long sections as well as a map showing drill hole locations are shown in Figures 1 to 3. Table 1
is a summary of the mineralized intervals.
Garrett Ainsworth, Vice-President, Exploration and Development, commented: “The objectives of the 2017
winter drill program are weighted towards expanding the area of mineralization at Arrow and subsequent
infilling of the deposit. The first batch of results from the 2017 program have materially expanded the A2 and
A3 shears to the northeast demonstrating continuity of these broad mineralized shears and include high
grade sub-intervals. High grade sub-intervals in th e A2 led us to discover the high grade A2 sub-zone. The
northeast extension of the A2, the up-dip northeast extension of the A3 shear, and the southwest gap
between Arrow and the 180 m southwest area are all high priorities given their growth profiles.”
Leigh Curyer, Chief Executive Officer, commented: “ These initial 2017 results suggest the ultimate ext ent of
Arrow is still in the early stages of definition. I t’s quite remarkable considering the maiden Inferre d mineral
resource estimate published in March 2016 ranks Arr ow as the largest undeveloped uranium deposit in
Canada. The updated resource estimate incorporating 2016 drilling at Arrow is on schedule for release in the
coming months. The 2017 program will continue to ag gressively test the boundaries of the known area of
mineralization which, to date, have continually ext ended the boundaries of Arrow.”
Figure 1: A2 Mineralized Long Section
Figure 2: A3 Mineralized Long Section
Figure 3: Arrow Deposit Drill Hole Locations
Table 1: Arrow Deposit Drill Hole Data
Drill Hole
Athabasca
Group -
Basement
Unconformity
Depth (m)
Handheld Scintillometer Results (RS-120)
Hole ID Azimuth Dip
Total
Depth
(m)
From (m) To (m) Width (m) CPS Range
AR-17-114c1 327 -70 849.50 130.00 436.00 452.00 16. 00 <500 - 11500
454.50 456.00 1.50 <500 - 7000
472.00 474.50 2.50 <500 - 12000
482.00 489.00 7.00 <500 - 3500
493.00 494.00 1.00 <500 - 960
502.50 509.50 7.00 <500 - 52000
514.00 517.50 3.50 <500 - >61000
532.50 533.00 0.50 <500 - 510
607.50 608.50 1.00 <500 - 1900
612.00 617.00 5.00 <500 - 3300
623.50 640.00 16.50 <500 - >61000
645.50 678.00 32.50 <500 - 54000
683.00 689.50 6.50 <500 - 5100
692.00 695.50 3.50 <500 - 3700
698.50 699.00 0.50 <500 - 14000
701.50 713.00 11.50 <500 - 9900
735.00 738.00 3.00 <500 - 530
AR-17-114c2 327 -70 823.50 130.00 437.50 438.00 0.5 0 <500 - 870
441.00 443.00 2.00 <500 - 530
453.00 456.50 3.50 <500 - 12000
465.00 465.50 0.50 <500 - 13700
471.50 472.00 0.50 <500 - 24000
480.50 481.00 0.50 <500 - 1800
485.50 486.50 1.00 <500 - 18000
494.00 507.00 13.00 <500 - 33000
510.00 517.50 7.50 <500 - 5500
524.00 524.50 0.50 <500 - 2600
529.00 531.00 2.00 <500 - >61000
534.50 535.50 1.00 <500 - 11000
539.50 557.50 18.00 <500 - >61000
561.00 563.00 2.00 <500 - 760
569.50 570.50 1.00 <500 - 1100
576.00 576.50 0.50 <500 - 570
626.00 628.50 2.50 <500 - 1200
639.00 639.50 0.50 <500 - 560
644.50 646.50 2.00 <500 - 4000
679.00 680.00 1.00 <500 - 2800
684.00 717.50 33.50 <500 - >61000
733.50 735.00 1.50 <500 - 7600
AR-17-115c1 327 -70 714.50 118.40 451.50 452.00 0.5 0 <500 - 1200
459.00 460.00 1.00 <500 - 2200
479.00 486.50 7.50 <500 - 6500
524.50 525.00 0.50 <500 - 2600
533.50 534.00 0.50 <500 - 1200
536.50 537.50 1.00 <500 - 5700
560.00 560.50 0.50 <500 - 510
603.00 613.00 10.00 <500 - 40000
615.50 619.00 3.50 <500 - 2700
660.00 663.50 3.50 <500 - 2700
674.50 675.00 0.50 <500 - 800
AR-17-115c2 327 -70 786.50 118.40 458.50 459.00 0.5 0 <500 - 1750
465.00 465.50 0.50 <500 - 1820
468.50 469.00 0.50 <500 - 1400
495.00 496.00 1.00 <500 - 11000
501.00 501.50 0.50 <500 - 13000
517.00 520.00 3.00 <500 - 3500
534.00 534.50 0.50 <500 - 760
541.50 542.00 0.50 500 - 13000
550.50 551.00 0.50 <500 - 18000
572.50 573.00 0.50 <500 - 700
580.50 582.50 2.00 <500 - 1670
601.50 602.50 1.00 <500 - 800
608.00 609.50 1.50 <500 - 5200
613.50 621.50 8.00 <500 - 56000
624.00 628.00 4.00 <500 - 22500
632.50 633.00 0.50 <500 - 710
635.50 640.00 4.50 <500 - 8200
644.00 644.50 0.50 <500 - 4300
649.50 655.50 6.00 <500 - 12500
672.50 673.00 0.50 <500 - 740
675.50 676.50 1.00 <500 - 5200
698.50 700.50 2.00 <500 - 2200
AR-17-116c1 327 -70 879.50 132.00 425.50 429.00 3.50 <500 - 17000
431.50 442.00 10.50 <500 - 15000
449.00 461.00 12.00 <500 - 19000
465.50 466.00 0.50 700 - 17000
469.00 494.00 25.00 <500 - >61000
497.50 510.00 12.50 <500 - 24000
605.00 607.50 2.50 <500 - 50000
625.00 625.50 0.50 <500 - 1100
636.00 637.50 1.50 <500 - 750
659.00 661.00 2.00 <500 - 1100
705.50 707.00 1.50 <500 - 700
796.50 799.00 2.50 <500 - 950
802.00 805.50 3.50 <500 - 1450
AR-17-116c2 327 -70 897.50 132.00 440.00 440.50 0.5 0 <500 - 2200
444.00 445.50 1.50 <500 - 5300
457.00 459.00 2.00 <500 - 6900
485.00 485.50 0.50 <500 - 510
489.00 493.00 4.00 <500 - 35000
497.50 499.00 1.50 1200 - 53000
518.00 519.00 1.00 <500 - 49000
522.00 526.00 4.00 <500 - 6600
532.00 532.50 0.50 <500 - 530
537.50 540.00 2.50 <500 - 5800
547.50 549.00 1.50 <500 - 1280
566.50 568.50 2.00 <500 - 1700
571.50 572.00 0.50 <500 - 1150
578.50 580.00 1.50 <500 - 570
642.00 645.50 3.50 <500 - 760
663.50 670.00 6.50 <500 - 6900
673.50 675.00 1.50 <500 - 2300
678.50 682.50 4.00 <500 - 1700
685.00 685.50 0.50 <500 - 860
693.50 710.50 17.00 <500 - >61000
720.50 732.00 11.50 <500 - 41000
734.50 735.50 1.00 <500 - 3700
747.00 747.50 0.50 <500 - 870
752.00 753.00 1.00 <500 - 2100
860.50 861.00 0.50 <500 - 740
AR-17-117c1 327 -70 621.50 124.20 395.00 395.50 0.5 0 <500 - 530
400.00 400.50 0.50 <500 - 1500
407.50 409.00 1.50 <500 - 670
418.00 418.50 0.50 <500 - 900
427.00 427.50 0.50 <500 - 2100
430.00 431.00 1.00 <500 - 600