Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NXE.TO ·

NexGen Intersects High-Grade Mineralization in all Twenty A2 and A3 Targets from the 2019 Feasibility Stage Drilling Program

Drill Results

NexGen Intersects High-Grade Mineralization in all Twenty A2 and A3

Targets from the 2019 Feasibility Stage Drilling Program

Vancouver, BC, May 28, 2019 – NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE)

is pleased to report radioactivity for an additional twenty holes comprising 7,969.5 m from the Company’s

Feasibility stage drilling program at our 100% owned, Rook I property in the Athabasca Basin Saskatchewan.

Objective I: Conversion of Indicated Mineral Resources to Measured Category

This current phase of the 2019 drilling program is targeting the A2 and A3 High -Grade Domain mine planning

sections at a spacing between 9.0 m and 16.7 m. The target spacing incorporates the results of a geostatistical

data spacing report compiled by Clayton V. Deutsch from Resource Modeling Solutions based on 189 drill holes,

totaling 121,923.15 m, which forms the basis of the Indicated Mineral Resource of 256.6 M lbs at 4.04 % U3O8.

All drill holes are collared at a steep inclination, then shallowed out between -55° and -60° before intersecting

the target by utilizing the latest in directional drilling technology.

Highlights:

A2 High-Grade Domains and Sub-zone

• AR-19-229c2 intersected 46.5 m of total composite mineralization including 12.05 m of total composite

off-scale radioactivity (>10,000 to >61,000 cps) within an 86.0 m section (602.0 to 688.0 m);

• AR-19-229c4 intersected 39.0 m of total composite mineralization including 8.55 m of total composite

off-scale radioactivity (>10,000 to >61,000 cps) within an 88.0 m section (578.0 to 666.0 m);

• AR-19-230c3 intersected 30.5 m of total composite mineralization including 7.55 m of total composite

off-scale radioactivity (>10,000 to >61,000 cps) within a 93.0 m section (564.0 to 657.0 m). Additionally,

of the 7.55 m of off -scale mineralization intersected in the hole , 0.5 m of massive -to-semi massive

pitchblende with minimum-greater-than-61,000 cps;

• AR-19-235c1 intersected 43.0 m of total composite mineralization including 7.15 m of total composite

off-scale radioactivity (>10,000 to >61,000 cps) within a 93.0 m section (517.0 to 610.0 m). Additionally,

of the 7.15 m of off -scale mineralization intersected in the hole , 3.0 m of massive -to-semi massive

pitchblende with minimum-greater-than-61,000 cps;

• AR-19-236c2 intersected 26.0 m of total composite mineralization including 6.35 m of total composite

off-scale radioactivity (>10,000 to >61,000 cps) within an 89.0 m section (579.0 to 668.0 m.

A3 High-Grade Domains

• AR-19-231c2 intersected 48.0 m of total composite mineralization including 5.75 m of total composite

off-scale radioactivity (>10,000 to >61,000 cps) within a 102.0 m section (469.0 to 571.0 m);

• AR-19-232c3 intersected 26.0 m of total composite mineralization including 5.1 m of total composite

off-scale radioactivity (>10,000 to >61,000 cps) within an 89.0 m section (560.0 to 649.0 m).

Drill hole locations and schematics are shown in Figures 1 to 2, drilling results can be found in Table 1. Drill hole

descriptions can be found at www.nexgenenergy.ca

Development, Permitting, Appointments, Activities & Financial

• Expediting Arrow to Feasibility by a 2-stage (10 rig) high density drilling program focused on mine

optimization plans based on Measured and Indicated mineral resources.

• As reported on April 29, 2019, NexGen received acceptance of the Rook I Project Description (Technical

Proposal) by the Canadian Nuclear Safety Commission ("CNSC") and the Saskatchewan Ministry of

Environment ("MOE"). The acceptance marked the commencemen t of an Environmental Assessment

("EA") on the Rook I Project (the "Project") in accordance with the requirements of both The

Environmental Assessment Act (Province of Saskatchewan) and the Canadian Environmental

Assessment Act, 2012 "CEAA 2012" (Governmen t of Canada). The EA is being conducted through a

coordinated process between the MOE and the CNSC, which is the Federal life -cycle regulator for all

uranium mine and mill projects in Canada. In addition, NexGen filed an Initial Licence Application with

the CNSC under the Nuclear Safety and Control Act in order to obtain a Licence to Prepare Site and

Construct for the Project.

• The Company also announces the appointments of Gillian McCombie, Vice President Human Resources

and Arthur Lieu, MSc., P.Eng., Vice President Processing and Metallurgy. Gillian brings over 25 years of

experience in human resources in the international mining and telecommunications sectors. Gillian most

recently as Vice President Human Resources at Capstone Mining and prior to that with Telus and Placer

Dome. Arthur joins NexGen having spent 20 years in mine processing and metallurgy. Most recently, he

was the Chief Metallurgist at Cameco’s Rabbit Lake mill and Orano’s McClean Lake mill. Arthur holds a

Bachelor of Science degree in Chemical Engineering and a Master of Science degree in Geochemistry,

with a focus on source -term characteristic of uranium was te rock piles at Cameco Key Lake uranium

mine. Mr. Lieu is also trained in Lean Six Sigma Black Belt process improvement and optimization.

Mr. Lieu is a registered Professional Engineer (P. Eng) with the Association of Professional Engineers and

Geoscientists of Saskatchewan (APEGS).

• The Company had cash-on-hand of approximately $90 million which fully funds NexGen for all drilling,

feasibility and development programs planned this year.

Leigh Curyer, Chief Executive Officer, commented: “These continuing high grade results received from sections

of the ore body focused on the mine plan , highlight the extraordinary high grade and robustness of Arrow. In

parallel, the Feasibility-stage engineering, metallurgical and environmental studies are all advancing extremely

well, together with permitting and our community programs. I would like to take the opportunity to also welcome

Arthur and Gill to the dedicated NexGen team. Two highly experienced and successful professionals in their

respective fields joining NexGen at an incredibly exciting time as we begin to see positive signs emerging in the

uranium market.”

Troy Boisj oli, Vice -President, Operations and Project Development, commented: “The cont inuity of

mineralization within the high-grade core of Arrow is remarkable and these results highlight the technical

advantages at the Arrow Deposit: mineralization hosted within stacked shear system (allowing holes to intersect

multiple targets with one drill hole, minimizing total meterage), stable crystalline basement host rock, and

extremely high-grades. These high grade results in all twenty holes will be incorporated into an updated Mineral

Resource Estimate which will form the basis of the Feasibility Study, scheduled for release in H1 2020.”

Figure 1: Arrow Deposit Drill Hole Locations

Figure 2: A2 and A3 Indicated Shells with Mine Schematic and Drill Hole Traces

Table 1: Arrow Deposit Drill Hole Data

Drill Hole

Athabasca Group - Basement

Unconformity Depth (m)

Handheld Scintillometer Results (RS-120)

Hole ID Azimuth Dip Total

Depth (m)

From

(m)

To

(m)

Width

(m) CPS Range

AR-19-225c3 327 -65 283 N/A 452.5 454 1.5 <500 - 46000

481 481.5 0.5 <500 - 800

488 490 2 <500 - 700

494.5 498 3.5 <500 - 1050

501 501.5 0.5 <500 - 1200

586.5 602 15.5 <500 - 61000

610 610.5 0.5 <500 - 550

615.5 618.5 3 <500 - 1800

AR-19-229c1 327 -65 693 132.8 473 475 2 <500 - 1200

480.5 481 0.5 <500 - 600

488.5 489 0.5 1000 - 13000

495 495.5 0.5 <500 - 1240

501 502 1 <500 - 41500

504.5 509 4.5 <500 - 20200

511.5 513 1.5 <500 - 4000

516.5 520 3.5 <500 - 19800

522.5 533 10.5 <500 - 61000

535.5 538.5 3 <500 - 49000

543.5 546.5 3 <500 - 61000

549.5 550 0.5 1230 - 61000

570 570.5 0.5 <500 - 540

628.5 634 5.5 <500 - 61000

638 638.5 0.5 <500 - 610

642 645.5 3.5 <500 - 61000

651 675.5 24.5 <500 - 61000

AR-19-229c2 327 -65 309 N/A 494.5 495 0.5 <500 - 700

500.5 501 0.5 <500 - 2150

505 505.5 0.5 <500 - 680

508 508.5 0.5 <500 - 31000

514 514.5 0.5 <500 - 9400

517.5 519 1.5 <500 - 6000

524.5 525.5 1 <500 - 4000

530 536.5 6.5 <500 - 8590

541.5 542.5 1 580 - 52500

545 545.5 0.5 <500 - 3200

550.5 562.5 12 <500 - 61000

574.5 577 2.5 <500 - 2000

625 671.5 46.5 <500 - 61000

AR-19-229c3 327 -65 240 N/A 494.5 496 1.5 <500 - 14900

502 503 1 <500 - 53300

506.5 507.5 1 <500 - 19500

510 510.5 0.5 <500 - 800

513.5 514 0.5 <500 - 1100

517 518 1 <500 - 12100

522 524.5 2.5 <500 - 2800

529 531 2 <500 - 32600

539.5 541.5 2 <500 - 14100

544.5 549.5 5 <500 - 47900

558 561 3 <500 - 61000

563.5 565 1.5 <500 - 14000

571 573 2 <500 - 2100

579 586 7 <500 - 1500

592.5 594.5 2 <500 - 610

629.5 645.5 16 <500 - 61000

648 651.5 3.5 <500 - 4400

654 680 26 <500 - 61000

683 683.5 0.5 <500 - 1350

705 707 2 <500 - 930

711.5 718 6.5 <500 - 1300

AR-19-229c4 327 -65 465 N/A 404 405.5 1.5 <500 - 600

415.5 416 0.5 <500 - 820

464 466 2 <500 - 3150

471.5 472.5 1 <500 - 2300

480 486.5 6.5 <500 - 61000

489 489.5 0.5 <500 - 1300

494 499 5 <500 - 18600

501.5 505 3.5 <500 - 32000

508.5 510.5 2 <500 - 43000

516.5 531.5 15 <500 - 39000

613.5 652.5 39 <500 - 61000

AR-19-230c1 327 -65 651.5 128.35 499 499.5 0.5 <500 - 4800

502 502.5 0.5 <500 - 1200

515.5 522 6.5 <500 - 3200

524.5 532.5 8 <500 - 1700

566 566.5 0.5 <500 - 550

571 572 1 <500 - 1300

577 598.5 21.5 <500 - 61000

603 605.5 2.5 <500 - 1200

608 608.5 0.5 <500 - 1650

611 611.5 0.5 <500 - 1160

622 628.5 6.5 <500 - 1800

631.5 632 0.5 <500 - 6600

AR-19-230c2 327 -65 252.5 N/A 484 484.5 0.5 <500 - 750

496.5 501 4.5 <500 - 50200

522.5 523 0.5 <500 - 575

552 556.5 4.5 <500 - 740

559 563 4 <500 - 1400

570.5 572 1.5 <500 - 620

586 609.5 23.5 <500 - 61000

613.5 614.5 1 <500 - 3200

617 618 1 <500 - 750

621.5 630 8.5 <500 - 15600

636 636.5 0.5 <500 - 970

AR-19-230c3 327 -65 234 N/A 458 458.5 0.5 <500 - 1030

461.5 463.5 2 <500 - 820

474.5 475 0.5 <500 - 680

487 487.5 0.5 <500 - 910

504 504.5 0.5 <500 - 1030

521.5 524 2.5 <500 - 730

561.5 562.5 1 <500 - 1310

567.5 568 0.5 <500 - 510

592 614.5 22.5 <500 - 61000

619.5 623.5 4 <500 - 1280

626.5 628.5 2 <500 - 14500

654.5 655 0.5 <500 - 540

AR-19-231c1 327 -65 564.5 138 466 470.5 4.5 <500 - 14000

487.5 488 0.5 <500 - 500

497 505 8 <500 - 46000

510.5 511 0.5 <500 - 900

515.5 528 12.5 <500 - 58000

AR-19-231c2 327 -65 222.5 N/A 467.5 472.5 5 <500 - 38000

480.5 481 0.5 500 - 7500

485 488 3 <500 - 2700

491 493.5 2.5 <500 - 3100

498.5 499 0.5 500 - 6200

505.5 546.5 41 <500 - 61000

555 555.5 0.5 <500 - 770