Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NXE.TO ·

NexGen Continues to Intersect High-Grade Mineralization in all A2 and A3 Targets Highlighting Strength of Continuity at Arrow

Drill Results

NexGen Continues to Intersect High-Grade Mineralization in all A2 and

A3 Targets Highlighting Strength of Continuity at Arrow

Vancouver, BC, July 10, 2019 – NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE)

is pleased to report radioactivity results for an additional forty holes comprising 18,166.5 m from the Company’s

Feasibility stage drilling program at our 100% owned, Rook I property in the Athabasca Basin, Saskatchewan.

Conversion of Indicated to Measured

This current phase of the 2019 drilling program is targeting the A2 and A3 High -Grade Domain mine planning

sections at a spacing between 9.0 m and 16.7 m based on a geostatistical data spacing report compiled by Clayton

V. Deutsch from Resource Modeling Solutions. All drill holes are collared at a steep inclination, then shallowed

out between -55° and -60° before intersecting the target by utilizing the latest in directional drilling technology.

Highlights:

A2 High-Grade Domains and Sub-Zone

The highlights below include composite and off -scale radioactivity results from the A2 only, for radioactivity

results for the entire hole see Table 1: Arrow Deposit Drill Hole Data.

• AR-19-229c5 intersected 44.0 m of total composite mineralization including 14.05 m of total composite

off-scale radioactivity (>10,000 to >61,000 cps) within a 98.0 m section (573.0 to 678.0 m). Additionally,

of the 14.05 m of off -scale mineralization int ersected in the hole 3.35 m of massive -to-semi massive

pitchblende with minimum-greater-than-61,000 cps;

• AR-19-239c2 intersected 45.5 m of total composite mineralization including 7.60 m of total composite

off-scale radioactivity (>10,000 to >61,000 cps) within a 107.0 m section ( 642.0 to 749.0 m).

Additionally, of the 7.60 m of off-scale mineralization intersected in the hole 1.65 m of massive-to-semi

massive pitchblende with minimum-greater-than-61,000 cps;

• AR-19-241c1 intersected 10.0 m of total composite mineralization including 4.65 m of total composite

off-scale radioactivity (>10,000 to >61,000 cps) within a 91.0 m section (492.0 to 583.0 m) in the A2 sub-

zone. Additionally, of the 4.65 m of off-scale mineralization intersected in the hole 0.5 m of massive-to-

semi massive pitchblende with minimum-greater-than-61,000 cps;

• AR-19-243c3 intersected 24.5 m of total composite mineralization including 4.45 m of total composite

off-scale radioactivity (>10,000 to >61,000 cps) within a n 85.5 m section ( 593.0 to 678.5 m).

Additionally, of the 4.45 m of off-scale mineralization intersected in the hole 0.5 m of massive-to-semi

massive pitchblende with minimum-greater-than-61,000 cps;

• AR-19-246c1 intersected 52.0 m of total composite mineralization including 6.70 m of total composite

off-scale radioactivity (>10,000 to >61,000 cps) within a 107.5 m section ( 628.0 to 735.5 m).

Additionally, of the 6.7 m of off-scale mineralization intersected in the hole 0.65 m of massive-to-semi

massive pitchblende with minimum-greater-than-61,000 cps;

• AR-19-247c1 intersected 27.0 m of total composite mineralization including 4.30 m of total composite

off-scale radioactivity (>10,000 to >61,000 cps) within an 85.0 m section (605.0 to 690.0 m).

A3 High-Grade Domains and Sub-Zone

The highlights below include composite and off -scale radioactivity results from the A 3 only, for radioactivity

results for the entire hole see Table 1: Arrow Deposit Drill Hole Data.

• AR-19-248c2 intersected 45.5 m of total composite mineralization including 7.30 m of total composite

off-scale radioactivity (>10,000 to >61,000 cps) within an 89.0 m section (487.0 to 576.0 m);

• AR-19-242c2 intersected 51.5 m of total composite mineralization including 5.85 m of total composite

off-scale radioactivity (>10,000 to >61,000 cps) within a 92.5 m section (511.0 to 603.5 m);

• AR-19-238c3 intersected 28.0 m of total composite mineralization including 5.25 m of total composite

off-scale radioactivity (>10,000 to >61,000 cps) within a 101.0 m section (440.0 to 541.0 m);

• AR-19-248c1 intersected 42.0 m of total composite mineralization including 5.85 m of total composite

off-scale radioactivity (>10,000 to >61,000 cps) within an 88.0 m section (474.0 to 562.0 m).

Drill hole locations are shown in Figure 1, drilling results can be found in table 1. Drill hole descriptions can be

found at www.nexgenenergy.ca

Development, Activities & Financial

• Expediting Arrow to Feasibility by initiation of a 2-stage (10 rig) high density drilling program that

commenced in mid -December 2018 to focus on mine optimization plans based on Measured and

Indicated mineral resources.

• NexGen commenced an Environmental Assessment on the Rook I Project on April 29, 2019 in accordance

with the requirements of both the Environmental Assessment Act and the Canadian Environmental

Assessment Act, 2012 (“CEAA 2012”) after receiving acceptance of the Rook I Project Description

(Technical Proposal) by the Canadian Nuclear Safety Commission (“CNSC”) and the Saskatchewan

Ministry of Environment (“SMOE”). In addition, NexGen filed an Initial Licence Application with the CNSC

under the Nuclear Safety and Control Act in order to obtain a Licence to Prepare Site and Construct for

the Project.

• As of July 1 , 2019, the Company had cash-on-hand of approximately $85 million which fully funds

NexGen for all drilling, feasibility and development programs planned this year.

Leigh Curyer, Chief Executive Officer, commented: “The largest drill program currently in Canada and in the

Company’s history continues to rapidly a dvance Arrow through to Feasibility Study, detailed design and

permitting. These results once again demonstrate the uniqueness of Arrow in terms of high grade and continuity.

With the broader team advancing all aspects of development, community and permitt ing, it is an exciting time

at NexGen.”

Troy Boisjoli, Vice -President, Operations and Project Development, commented: “This latest batch of

radioactivity results from the A2 and A3 High-Grade Domains, again demonstrates our confidence in the

continuation of the high-grade mineralization across the Arrow Deposit. The strength of mineralization seen as

part of this mine plan development drilling is truly unique and something I’ve never seen in my career. Not only

are we seeing continuity of strong mineralization but also in rock competency throughout the mine plan. We are

looking forward to the completion of Phase I (conversion of Indicated Mineral Resource to the measured

category) and the start of Phase II (conversion of Inferred Mineral Resource to the Indicated category).”

Figure 1: Arrow Deposit Drill Hole Locations

Table 1: Arrow Deposit Drill Hole Data

Drill Hole

Athabasca Group - Basement

Unconformity Depth (m)

Handheld Scintillometer Results (RS-

120/125)

Hole ID Azimuth Dip Total

Depth (m)

From

(m) To (m) Width

(m) CPS Range

AR-19-229c5 327 -65 681.00 N/A 464.00 465.00 1.00 <500 - 1900

469.00 469.50 0.50 <500 - 510

472.00 472.50 0.50 <500 - 680

480.50 487.50 7.00 <500 - 5400

490.00 491.00 1.00 <500 - 7200

495.50 501.00 5.50 <500 - 40000

504.50 511.00 6.50 <500 - 9900

513.50 522.50 9.00 <500 - 28300

525.00 537.50 12.50 <500 - 33000

615.00 659.00 44.00 <500 - 61000

AR-19-230c4 327 -65 693.50 N/A 461.50 463.50 2.00 <500 - 930

502.00 502.50 0.50 <500 - 2470

505.00 507.50 2.50 <500 - 3220

514.00 522.50 8.50 <500 - 1700

533.50 534.50 1.00 <500 - 780

559.00 563.50 4.50 <500 - 1800

567.00 567.50 0.50 <500 - 540

601.50 608.50 7.00 <500 - 61000

615.00 617.50 2.50 <500 - 10200

624.00 628.50 4.50 <500 - 1300

639.00 639.50 0.50 <500 - 640

643.00 647.00 4.00 <500 - 7800

655.00 656.00 1.00 <500 - 730

660.00 660.50 0.50 <500 - 530

666.50 668.00 1.50 <500 - 10600

AR-19-232c4 327 -65 645.50 N/A 495.00 496.00 1.00 <500 - 1680

547.00 549.00 2.00 <500 - 26000

551.50 552.00 0.50 <500 - 5100

559.00 572.50 13.50 <500 - 61000

579.50 581.50 2.00 <500 - 51000

584.50 585.00 0.50 <500 - 2300

596.00 598.50 2.50 <500 - 61000

601.50 605.00 3.50 <500 - 47300

609.00 609.50 0.50 <500 - 870

613.50 614.00 0.50 500 - 2700

617.50 618.00 0.50 <500 - 1100

AR-19-233c4 327 -65 558.50 N/A 452.00 458.00 6.00 <500 - 3070

462.00 462.50 0.50 <500 - 530

465.50 466.00 0.50 <500 - 620

484.50 497.00 12.50 <500 - 13400

506.50 521.00 14.50 <500 - 30000

525.00 528.50 3.50 500 - 1350

AR-19-234c3 327 -65 537.00 N/A 460.00 461.50 1.50 <500 - 990

479.00 484.00 5.00 <500 - 1700

487.50 511.00 23.50 <500 - 61000

AR-19-236c3 327 -65 684.50 N/A 461.50 462.50 1.00 <500 - 2100

468.50 469.50 1.00 <500 - 2800

476.50 477.00 0.50 590 - 21000

483.00 486.00 3.00 <500 - 1260

488.50 489.50 1.00 <500 - 1760

498.50 499.50 1.00 <500 - 2700

505.00 506.00 1.00 <500 - 750

515.50 529.50 14.00 <500 - 61000

534.50 535.00 0.50 <500 - 820

542.50 543.50 1.00 <500 - 1100

578.00 586.00 8.00 <500 - 1000

591.00 593.00 2.00 <500 - 1060

596.50 601.50 5.00 <500 - 9300

604.00 617.00 13.00 <500 - 3200

620.50 635.50 15.00 <500 - 61000

638.50 644.50 6.00 <500 - 1430

648.00 649.00 1.00 <500 - 6300

654.00 664.00 10.00 <500 - 53000

677.50 678.00 0.50 <500 - 660

AR-19-236c4 327 -65 699.50 N/A 463.00 463.50 0.50 <500 - 1200

473.50 474.00 0.50 <500 - 800

477.00 478.00 1.00 <500 - 12000

483.00 483.50 0.50 <500 - 1400

490.00 490.50 0.50 <500 - 2000

501.00 502.00 1.00 <500 - 2300

509.00 509.50 0.50 <500 - 2700

515.00 517.00 2.00 <500 - 6800

519.50 533.00 13.50 <500 - 61000

548.00 548.50 0.50 <500 - 620

589.00 589.50 0.50 <500 - 820

594.00 599.00 5.00 <500 - 1800

607.00 609.50 2.50 <500 - 980

616.50 618.00 1.50 <500 - 1500

622.00 624.00 2.00 <500 - 21000

631.50 632.50 1.00 <500 - 1100

635.00 651.50 16.50 <500 - 24000

658.00 665.50 7.50 <500 - 61000

671.00 672.00 1.00 <500 - 3400

AR-19-237c1 327 -65 705.50 128.00 302.00 302.50 0.50 <500 - 560

496.00 497.00 1.00 <500 - 2300

532.50 533.00 0.50 <500 - 1800

545.50 549.50 4.00 <500 - 29000

556.50 558.50 2.00 <500 - 11500

565.50 567.00 1.50 <500 - 6000

570.50 571.50 1.00 <500 - 32000

640.00 645.50 5.50 <500 - 61000

648.00 664.00 16.00 <500 - 52000

667.00 667.50 0.50 <500 - 1200

671.50 672.00 0.50 <500 - 700

677.50 684.50 7.00 <500 - 9800

690.00 690.50 0.50 <500 - 510

AR-19-237c2 327 -65 720.50 N/A 504.00 504.50 0.50 <500 - 2100

520.50 522.00 1.50 <500 - 13500

546.00 546.50 0.50 <500 - 750

554.50 555.00 0.50 <500 - 670

560.50 561.00 0.50 <500 - 1280

563.50 566.50 3.00 <500 - 910

570.00 571.00 1.00 560 - 12800

578.00 580.50 2.50 <500 - 3100

583.50 584.00 0.50 900 - 34000

639.00 648.50 9.50 <500 - 51000

651.00 670.50 19.50 <500 - 20500

678.00 684.00 6.00 <500 - 13600

686.50 688.00 1.50 <500 - 9300

718.00 718.50 0.50 <500 - 700

AR-19-237c3 327 -65 738.50 N/A 450.50 451.00 0.50 <500 - 720

510.00 510.50 0.50 <500 - 9200

526.00 526.50 0.50 <500 - 1100

554.00 560.00 6.00 <500 - 16000

565.00 568.00 3.00 <500 - 5700

573.50 575.50 2.00 <500 - 21000

581.00 583.00 2.00 <500 - 1800

587.00 588.00 1.00 <500 - 1100

595.50 596.00 0.50 <500 - 600

642.00 646.50 4.50 <500 - 3850

652.00 677.50 25.50 <500 - 61000

686.00 686.50 0.50 <500 - 750

691.00 692.50 1.50 <500 - 2900

696.50 697.50 1.00 600 - 13000

700.00 705.00 5.00 <500 - 5000

AR-19-238c1 327 -65 513.50 141.50 438.00 445.00 7.00 <500 - 6000

447.50 448.00 0.50 <500 - 540

454.00 455.50 1.50 <500 - 3700

458.50 463.50 5.00 <500 - 61000

466.50 467.00 0.50 1300 - 61000

471.50 482.50 11.00 <500 - 61000

487.50 491.00 3.50 <500 - 1000

498.00 501.00 3.00 <500 - 780

AR-19-238c2 327 -65 522.50 N/A 426.00 426.50 0.50 <500 - 850

448.50 450.50 2.00 <500 - 2700

455.00 456.50 1.50 <500 - 8300

466.00 467.00 1.00 <500 - 780

472.00 476.50 4.50 <500 - 56400

482.50 492.00 9.50 <500 - 61000

AR-19-238c3 327 -65 540.50 N/A 458.50 461.50 3.00 <500 - 9400

467.00 468.00 1.00 <500 - 8900

477.50 478.00 0.50 <500 - 1000

487.50 490.00 2.50 <500 - 42000

496.50 517.50 21.00 <500 - 61000

AR-19-238c4 327 -65 542.50 N/A 457.00 457.50 0.50 <500 - 2000

473.50 476.50 3.00 <500 - 44000

480.50 481.00 0.50 670 - 28000

499.50 503.00 3.50 <500 - 61000

506.50 522.50 16.00 <500 - 61000

AR-19-239c1 327 -65 729.50 133.00 229.50 230.00 0.50 <500 - 590

452.50 453.00 0.50 <500 - 520

479.00 479.50 0.50 <500 - 650

487.00 488.50 1.50 <500 - 2600

499.50 500.50 1.00 <500 - 3300

513.50 514.00 0.50 <500 - 6800

517.50 520.50 3.00 <500 - 26800

524.50 525.00 0.50 <500 - 650