• Vertical extent of high-grade subdomain increased +33% to 550m with a strike length of

210m

• High-grade extension in RK-26-280c1 with cumulative 4.2m of >10,000 cps including 0.6m

of >61,000 cps

• Continuity of intense mineralization in RK-26-271c1 with cumulative 12.6m of >10,000 cps

including 2.3m of >61,000 cps 80m down plunge of RK-25-256 (5.5m at 21.4% U3O8)

• Progressive high-grade continuity at depth in RK-26-276 with cumulative 11.2m of >10,000

cps including 0.6m of >61,000 cps and RK-26-285 with cumulative 9.0m of >10,000 cps

including 0.7m of >61,000 cps

Vancouver, BC, April 22, 2026 - NexGen Energy Ltd. (TSX: NXE) (NYSE: NXE) (ASX: NXG) ("NexGen"

or the "Company") announces results from the 2026 winter drill program at Patterson Corridor East

(“PCE”) that recently concluded, highlighting significant vertical growth and strong internal continuity of

high-grade mineralization.

Within the mineralized zone of PCE, the high- grade subdomain has now grown to 550 m in vertical extent,

a 33% increase, with a strike length of 210 m. This expansion was primarily driven by hole RK-26-280c1

which returned cumulative 4.2m of >10,000 cps including 0.6m of >61,000 cps at 834m below surface

(Figures 1-3). The hole successfully intersected mineralization 230m down plunge along a high-grade shoot

interpreted to connect with RK-26-271c1 (Figure 4).

Holes RK-26-271c1, RK-26-276, and RK -26-285 returned strong mineralized intercepts between 600 to

700m below surface, where the system remains open for expansion (Figures 1 and 2, Table 1). Results from

RK-26-271c1 include cumulative 12.6m of >10,000 cps including 2.3m of >61,000 cps 80m down plunge of

RK-25-256 (5.5m at 21.4% U 3O8) indicat ing continuity of intense high- grade mineralization (Figure 3) .

Further, the intersections from RK-26-276 (cumulative 11.2m of >10,000 cps including 0.6m of >61,000 cps)

and RK-26-285 (cumulative 9.0m of >10,000 cps including 0.7m of >61,000 cps ) add progressive high-

grade continuity to the base of this growing subdomain.

Drilling 600m to the southeast of PCE along a separate parallel trend, prospective structure and alteration

features are vectoring the Company toward potential repetition of mineralization within the overall PCE

system (Figure 5).

Summer drilling of ~29,200m is schedule to commence the week of May 25, 2026. All samples from 2026

drilling are submitted to the independent Saskatchewan Research Council Geoanalytical Laboratory (SRC),

with results to follow.

Leigh Curyer, Founder & Chief Executive Officer, commented: “ Today’s results from the 2026 winter

program confirm both the scale and growth of PCE continues to advance at pace . Increasing the vertical

extent of the high- grade subdomain by 33 % during the winter program, suggests substantial drilling is

required going forward to fully understand the extent of this mineralized zone. In parallel, drilling focused

on vectoring into additional zones of mineralization will be incorporated into the summer program based on

these winter results.

“With the Rook I P roject commencing construction this summer and the significance of PCE materializing

rapidly, we look forward to future drilling and evaluation of PCE and its potential position in the long -term

profile of NexGen’s uranium portfolio. NexGen is positioned to meet the strong demand for Canadian

uranium for many decades into the future, whilst setting a new industry standard in the safe, efficient and

reliable delivery of offtake to utility customers around the world.”

A total of 12,758.2m of the planned 42,000m has been completed in 2026, focusing on high-grade growth

and expansion of mineralization. Thirteen drill holes totalling 9,131.7 m were dedicated to advancing the

mineralization at PCE and six drill holes totalling 3,626.5m tested the parallel trend. Since discovery (see

news release date March 11, 2024), 115 drillholes totalling 72,464.7m targeted PCE mineralization (Figure

4) with 79 of the 115 drill holes being mineralized, including 54 intersecting high-grade (>10,000 cps)

and 21 intersecting off-scale (>61,000 cps).

Figure 1: Interpreted 3D model of PCE shown looking northwest (across strike) and northeast (along strike); previously reported in

December 1, 2025 release, now with RK-26-271c1, RK-26-276, RK-26-280c1, and RK-26-285 intersections outlined in purple

Figure 2: Interpreted model of mineralization at PCE (as of this release); new holes emphasized by larger diameter pierce points and

bold labels; view is a long section that looks perpendicular to the primary mineralized plane; total mineralized footprint in orange and

the high-grade subdomains in red

Figure 3: Core photo from RK-25-280c1 displays semi-massive, off-scale (>61,000 cps) from uranium vein at 834m down hole

Figure 4: Core photo from RK-25-271c1 displays mineralization from 630.3 to 646.5m down hole with abundant high-grade and

several instances of off-scale in competent basement rock; yellow outlines >1,000 cps, red outlines >10,000 cps, >61,000 cps

outlined in purple

Figure 5: Map of PCE with completed 2026 drill holes; ground gravity in background, interpreted fault shown as black dashed line

Table 1: Spectrometer results since January 15, 2026 release

Drillhole

Unconformity

Depth (m)

Handheld Spectrometer Results (RS-125)

Hole ID Azimuth Dip

Total

Depth

(m)

From (m) To (m) Width

(m) CPS Range

RK-26-271c1 275 -75 730.0 - 615.0 616.5 1.5 <500

618.0 619.0 1.0 <500

619.5 627.5 8.0 <500

627.5 627.7 0.2 600 - 2000

627.7 627.8 0.1 >61000

627.8 628.0 0.2 800 - 3000

628.0 630.0 2.0 <500

630.0 630.5 0.5 <500 - 1400

630.5 631.0 0.5 <500

631.0 632.0 1.0 <500 - 900

632.0 632.5 0.5 600 - 1200

632.5 633.0 0.5 <500 - 2200

633.0 633.5 0.5 <500 - 1000

633.5 634.5 1.0 <500 - 900

634.5 635.0 0.5 500 - 40000

635.0 635.5 0.5 <500

635.5 636.0 0.5 <500 - 720

636.0 636.5 0.5 500 - 13000

636.5 636.8 0.3 10000 - 42000

636.8 636.9 0.1 >61000

636.9 637.0 0.1 24000 - 35000

637.0 637.2 0.2 17000 - 50000

637.2 637.4 0.2 >61000

637.4 637.5 0.1 30000 - 50000

637.5 638.0 0.5 500 - 38000

638.0 638.5 0.5 600 - 45000

638.5 638.6 0.1 50000 - 55000

638.6 638.9 0.3 >61000

638.9 639.0 0.1 500 - 55000

639.0 639.3 0.3 >61000

639.3 639.5 0.2 19000 - 57700

639.5 640.0 0.5 <500 - 46200

640.0 640.1 0.1 12200 - 51000

640.1 640.6 0.5 >61000

640.6 641.0 0.4 <500 - 58700

641.0 641.5 0.5 <500 - 49800

641.5 641.8 0.3 >61000

641.8 642.0 0.2 6700 - 41300

642.0 642.1 0.1 >61000

642.1 642.2 0.1 12200 - 51000

642.2 642.3 0.1 >61000

642.3 642.4 0.1 9300 - 51400

642.4 642.7 0.3 >61000

642.7 643.0 0.3 14300 - 46700

643.0 643.5 0.5 <500 - 7300

643.5 644.0 0.5 <500 - 8000

644.0 644.5 0.5 <500 - 1400

644.5 645.0 0.5 <500

645.0 645.5 0.5 <500 - 1300

645.5 646.5 1.0 <500 - 1200

646.5 647.0 0.5 <500 - 600

647.0 647.5 0.5 <500

647.5 648.0 0.5 <500 - 2200

648.0 648.5 0.5 <500 - 1000

648.5 649.0 0.5 <500 - 8000

649.0 649.5 0.5 3000 - 10000

649.5 650.0 0.5 3000 - 22000

650.0 650.5 0.5 <500 - 7000

650.5 653.0 2.5 <500

653.0 653.5 0.5 <500 - 900

653.5 654.0 0.5 <500

654.0 655.0 1.0 600 - 12000

655.0 655.5 0.5 500 - 7000

655.5 656.0 0.5 500 - 1600

656.0 656.5 0.5 <500 - 2200

656.5 657.0 0.5 <500 - 800

657.0 657.5 0.5 <500 - 700

657.5 658.0 0.5 <500

658.0 658.5 0.5 <500 - 600

658.5 659.0 0.5 <500 - 900

659.0 660.0 1.0 <500

660.0 660.5 0.5 <500 - 1100

660.5 661.0 0.5 <500 - 800

661.0 661.5 0.5 <500 - 1300

661.5 662.0 0.5 <500

662.0 662.5 0.5 <500 - 1000

662.5 663.0 0.5 <500 - 9500

663.0 663.5 0.5 <500 - 650

663.5 665.5 2.0 <500

665.5 666.0 0.5 <500 - 2200

666.0 666.5 0.5 <500 - 1500

670.5 671.0 0.5 <500 - 18300

671.0 671.5 0.5 <500 - 6100

671.5 672.0 0.5 570 - 32400

672.0 672.5 0.5 <500 - 4100

672.5 673.0 0.5 <500 - 7100

673.0 673.5 0.5 <500 - 3800

674.0 674.5 0.5 <500 - 530

674.5 675.0 0.5 <500 - 650

675.5 676.0 0.5 <500 - 900

676.0 676.5 0.5 <500

677.0 677.5 0.5 <500

678.5 679.5 1.0 <500

679.5 680.0 0.5 <500 - 22800

680.0 680.5 0.5 10000 - 42300

680.5 681.0 0.5 2000 - 30000

681.0 681.5 0.5 <500 - 1300

681.5 682.5 1.0 <500

682.5 683.0 0.5 <500 - 2900

683.0 683.5 0.5 <500 - 10400

683.5 684.0 0.5 <500 - 8000

684.0 684.5 0.5 <500

685.5 686.0 0.5 <500 - 1000

688.5 689.0 0.5 <500 - 4400

689.0 689.5 0.5 <500 - 1700

691.0 692.0 1.0 <500

692.5 693.0 0.5 <500 - 1700

695.0 695.5 0.5 <500

696.5 697.0 0.5 <500

698.5 699.0 0.5 <500 - 1600

700.0 700.5 0.5 <500 - 1100

700.5 701.0 0.5 <500 - 2100

701.0 701.5 0.5 <500 - 1500

701.5 702.5 1.0 <500 - 1700

703.0 703.5 0.5 <500 - 1900

706.0 706.5 0.5 <500

709.0 709.5 0.5 <500 - 800

709.5 710.0 0.5 <500

710.5 711.0 0.5 <500 - 1400

711.0 711.5 0.5 <500 - 1700

712.0 713.0 1.0 <500

714.0 715.0 1.0 <500 - 900

715.5 716.0 0.5 <500 - 1000

716.0 716.5 0.5 <500

718.5 719.0 0.5 <500

720.0 720.5 0.5 <500 - 3400

720.5 721.0 0.5 <500 - 1900

721.0 721.5 0.5 <500 - 1400

721.5 722.0 0.5 <500

723.0 723.5 0.5 <500 - 550

RK-26-273 295 -66 390.0 131.5 267.0 267.5 0.5 <500 - 800

RK-26-274 280 -75 546.0 119.9 417.0 418.0 1.0 <500

418.5 419.0 0.5 <500

419.0 419.5 0.5 <500 - 530

419.5 420.0 0.5 <500 - 2300

420.0 420.5 0.5 <500 - 660

420.5 421.5 1.0 <500

430.0 430.5 0.5 <500

431.5 432.5 1.0 <500

433.0 433.5 0.5 <500

435.5 436.0 0.5 <500

437.5 438.0 0.5 <500 - 1050