PCE Expansion:

 Vertical extent of high-grade subdomain has increased by 23% from 335 m to 412 m with

210 m of strike length.

 Additional expansion of the mineralized footprint to 700 m vertical extent (from 600 m) and

to 620 m strike length (from 600 m).

 Additional high-grade subdomain building at 850 m below surface, extending high-grade in

this portion of the mineralization and opening it to further growth.

2026 Drilling Program Commencement:

 42,000 meters (“m”) of diamond drilling at PCE in 2026 to be largest program conducted at

the discovery to date building on the highly successful 2025 growth and results

 Inaugural drilling at NexGen’s 100% owned SW3 property with 3,500 m to advance high-

priority targets.

Vancouver, BC, January 15, 2026 - NexGen Energy Ltd. ("NexGen" or the "Company") (TSX: NXE)

(NYSE: NXE) (ASX: NXG) is pleased to announce the concluding holes of the 2025 PCE program and the

commencement of the 2026 Exploration Program.

2025 PCE

Final drill holes of the 2025 PCE program delivered continued expansion of mineralization with high-grade

growth and assessment of extents advancing significantly since the Company’s last scintillometer report

(see news release dated August 28, 2025). The primary high-grade subdomain grew to 412 m in vertical

extent (increase of 77 m) and a strike length of 210 m. An additional high-grade subdomain is developing

with hole RK-25-257 intersecting local off-scale (>61,000 cps) at the base of the currently outlined

mineralized footprint, indicating significant expansion potential at depth (Figures 1-4, Table 1).

The overall mineralized footprint expanded to 620 m (increase of 20 m) of strike length and 700 m (increase

of 100 m) of vertical extent, remaining open in most directions. Step out testing has provided critical

information regarding extents of the system and opportunities for continued growth.

Internal continuity within the subdomain was most recently highlighted by RK-25-271 with 5.8 m of

cumulative high-grade (>10,000 cps) and 0.8 m of off-scale (>61,000 cps) that increases the mineralized

zone in the lower half of this subdomain (Figure 3, Table 1). Hole RK-25-271 is located 65 m down-dip from

hole RK-25-256 (see news release dated December 1, 2025) which returned 5.5 m at 21.4% U 3O8,

including 2.5 m at 46.1% U 3O8 and 0.5 m at 74.8% U 3O8.

The 2025 drilling program successfully completed 35,366.2 m, the largest reported in the Athabasca Basin

in 2025. Since discovery (see news release date March 11, 2024), 102 drillholes totalling 69,042.2 m have

been completed (Figure 1). A dual focused approach was taken in 2025 to both grow and define multiple

high-grade subdomains as well as expand the overall mineralized footprint. To date, 67 of the 102 drill

holes are mineralized, including 45 intersecting high-grade (>10,000 cps) and 17 intersecting off-

scale (>61,000 cps).

Figure 1: Interpreted model of mineralization at PCE (as of this release); new holes emphasized by larger diameter pierce points and

bold labels; view is a long section that looks perpendicular to the primary mineralized plane; total mineralized footprint in orange and

the high-grade subdomains in red; drillholes with pending assays are underlined, 32% of 2025 drillholes have fully received results

(as of this release)

Figure 2: Comparison of mineralization at PCE over time with the model evolving based on new geological data; dimensions are

measured from confirmed mineralized intercepts along strike and vertical extent; view is a long section that looks perpendicular to

the primary mineralized plane; total mineralized footprint in orange and the high-grade subdomains in red

Figure 3: Core photo from RK-25-271 displays mineralization from 624.7 to 640.6 m down hole with abundant high-grade and

several instances of off-scale in competent basement rock; yellow outlines >1,000 cps, red outlines >10,000 cps, >61,000 cps

outlined in purple

Figure 4: Representative geological cross-section through high-grade subdomain looking northeast with confirmed dip extent of 450

m and width up to 135 m; uranium mineralization shown as red overlay; interpretation of features extending beyond drillholes aided

by drilling information outside of cross-section width (25 m).

2026 Exploration Program Commencement

Advancement of PCE mineralization with 42,000 m of drilling (Figure 5):

Drilling activity will primarily focus on high-grade growth and the continued expansion of the mineralized

footprint. At least eight (8), 200 m spaced tests will also investigate for repetition of basement-hosted

mineralization within the same hydrothermal system approximately 600 m southeast of the PCE discovery.

Figure 5: Map of PCE with ground gravity in background, target areas are hosted within gravity low denoted by blue colours,

interpreted faults are shown as black dashed lines; primary focus in the immediate vicinity of PCE mineralization with additional

secondary investigation of local system

Regional drilling of 3,500 m at SW3 (Figure 6):

An inaugural, drill program will take place on the SW3 land package with regional greenfield testing of highly

prospective target areas. This marks the first drilling on any SW3 mineral claims by NexGen and an exciting

step in the direct investigation of geophysical anomalies identified. The SW3 package is one of the three

core packages NexGen owns 100% of in the southwest Athabasca Basin and is situated 20 km southeast

of the SW2 package which hosts the Rook I Project.

Figure 6: Map of SW3 with inset of overall NexGen land packages; 3,500 m will investigate highest priority target areas, outlined in

red, in this greenfield setting

Leigh Curyer, Chief Executive Officer, commented: “We are extremely pleased with the 2025 outcomes

from the 2025 drill program at PCE that delivered on our dual-purpose objectives of expanding the overall

mineralized footprint and expand the high-grade subdomain within it. These results systematically outline

mineralization that continues to deliver growth and strong continuity, characteristics synonymous with

Arrow deposit 3.5 km west. The 2025 drill program has rapidly advanced this new discovery, while

underscoring the tremendous prospectivity of NexGen’s 100% owned dominant land holdings which is

driving the expanded activity in 2026. The 2026 program is designed to continue the dual track focus at

PCE and in parallel, test for a repetition of PCE within the same system. In addition, drilling for the first time

at our SW3 property is a reflection of the south western section of the Athabasca Basin world class

prospectivity.

At a pivotal moment for global energy security, nuclear power is being recognized as an indispensable pillar

for reliable, clean, cost efficient energy. The NexGen team is laser focused on concluding the final Federal

permitting and licensing for the Rook I Project and immediately advancing through construction into

production whilst simultaneously advancing the exciting PCE discovery and other high priority targets.

Jason Craven, Vice President, Exploration, commented : “Last year’s highly transitional and successful

program positions NexGen to enter 2026 with an even deeper understanding of this broad and growing

high-grade system. A multitude of targets remain to be tested as we continue to systematically advance

PCE with a dual priority track of expanding both the high-grade subdomains as well as the overall

mineralized system. The comprehensive 2026 program strategically positions all three land packages on

an exciting path toward expansion of PCE as well as additional discoveries as NexGen works to sustainably

supply the world with uranium in the face of mounting and persistent deficits.”

Table 1: Spectrometer results since August 28, 2025 release

Drillhole

Unconformity

Depth (m)

Handheld Spectrometer Results (RS-125)

Hole ID Azimuth Dip Total

Depth (m)

From

(m) To (m) Width

(m) CPS Range

RK-25-254c2 275 -65 553.5 - 394.0 394.5 0.5 <500 - 530

394.5 395.0 0.5 <500 - 510

396.5 397.0 0.5 <500

409.5 411.5 2.0 <500

412.0 413.5 1.5 <500

420.5 421.0 0.5 <500

421.0 421.5 0.5 <500 - 900

421.5 422.0 0.5 <500

429.5 430.0 0.5 <500

437.5 438.0 0.5 <500 - 710

438.0 438.5 0.5 <500 - 530

438.5 439.0 0.5 <500 - 6500

439.0 439.5 0.5 <500 - 520

439.5 440.0 0.5 1000 - 4900

440.0 440.5 0.5 1000 - 12000

440.5 441.0 0.5 <500 - 9000

441.0 441.5 0.5 <500 - 1000

441.5 442.0 0.5 <500

442.0 442.5 0.5 <500

442.5 443.0 0.5 <500

446.0 446.5 0.5 <500 - 2000

446.5 447.0 0.5 <500 - 800

447.0 447.5 0.5 <500

447.5 448.0 0.5 <500 - 1000

448.0 448.5 0.5 <500

448.5 449.0 0.5 <500 - 700

449.0 449.5 0.5 <500 - 600

449.5 450.0 0.5 <500 - 700

450.5 451.0 0.5 <500

451.0 451.5 0.5 <500 - 700

451.5 452.0 0.5 <500 - 550

452.0 452.5 0.5 <500

452.5 453.0 0.5 <500 - 540

453.0 453.5 0.5 <500

453.5 454.0 0.5 <500 - 700

454.0 454.5 0.5 <500

457.0 457.5 0.5 <500

481.5 482.0 0.5 <500 - 600

482.0 482.5 0.5 <500 - 1300

482.5 483.0 0.5 <500 - 510

483.0 483.5 0.5 <500

483.5 484.0 0.5 <500

490.5 491.0 0.5 <500 - 1350

491.0 491.5 0.5 <500

491.5 492.0 0.5 <500

492.0 492.5 0.5 <500

492.5 493.0 0.5 <500

493.0 493.5 0.5 <500 - 700

493.5 494.0 0.5 <500

495.5 496.0 0.5 <500

496.0 496.5 0.5 <500 - 3600

496.5 497.0 0.5 <500 - 2000

RK-25-255 4 -70 950.4 112.7 674.5 675.0 0.5 <500

676.5 677.0 0.5 <500

779.5 780.0 0.5 <500 - 770

780.0 780.5 0.5 <500 - 1000

780.5 781.0 0.5 <500 - 2900

781.0 781.5 0.5 <500 - 4400

781.5 782.0 0.5 <500 - 2400

782.0 782.5 0.5 <500 - 550

782.5 783.0 0.5 <500 - 1200

785.5 786.0 0.5 <500 - 1000

786.0 786.5 0.5 <500

787.0 787.5 0.5 <500

789.5 790.0 0.5 <500

790.0 790.5 0.5 <500 - 1200

790.5 792.5 2.0 <500

792.5 793.0 0.5 <500 - 1000

793.0 798.0 5.0 <500

798.0 798.5 0.5 <500 - 1100

799.5 800.0 0.5 <500 - 620

800.5 801.0 0.5 <500

804.0 804.5 0.5 <500

805.0 805.5 0.5 1200 - 6700

807.0 807.5 0.5 <500 - 5000

807.5 807.7 0.2 10000 - 12000

807.7 807.8 0.1 >61000

807.8 808.0 0.2 <500 - 520

808.0 808.5 0.5 <500 - 3900

829.5 830.0 0.5 <500 - 520

830.0 830.5 0.5 <500 - 590

832.0 833.0 1.0 <500

833.0 833.5 0.5 <500 - 560

833.5 835.0 1.5 <500

835.5 836.5 1.0 <500

838.5 839.5 1.0 <500

840.5 841.0 0.5 <500

842.0 842.5 0.5 <500

842.5 843.0 0.5 <500 - 990

844.0 844.5 0.5 <500 - 940

844.5 845.0 0.5 <500 - 1700

845.0 845.5 0.5 <500 - 620

845.5 846.5 1.0 <500

847.5 848.0 0.5 <500 - 870

848.0 848.5 0.5 <500

851.5 852.0 0.5 <500 - 5300

852.0 852.5 0.5 <500 - 18400

885.5 886.0 0.5 <500

886.0 886.5 0.5 <500 - 800

886.5 887.0 0.5 <500 - 600

889.0 889.5 0.5 <500 - 550

889.8 890.1 0.3 6600 - 31000

890.1 890.5 0.4 <500

RK-25-257 337 -68 1085.0 108.0 925.0 925.5 0.5 <500 - 4800

925.5 926.0 0.5 <500 - 1180

929.5 930.0 0.5 <500 - 840

930.5 931.0 0.5 <500

931.0 931.5 0.5 <500 - 510