Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NXE.TO ·

NexGen Announces Best Hole (RK-24-207) to Date and Material Expansion of Mineralized Zone at Patterson Corridor East

Drill Results

NexGen Announces Best Hole (RK-24-207) to Date and Material Expansion of Mineralized

Zone at Patterson Corridor East

Vancouver, BC, August 8, 2024 – NexGen Energy Ltd. ("NexGen" or the "Company") (TSX: NXE)

(NYSE: NXE) (ASX: NXG) is pleased to announce the mineralized zone at Patterson Corridor East (PCE)

has materially expanded since the original discovery in the 2024 Winter Program (see NexGen News

Release dated March 11, 2024) . The Summer Drill Program commenced May 21st, with eight (8) out of

twelve (12) drillholes intersecting mineralization to date (Figures 1 and 2, Table 1). Extensive mineralization

plunges to the east with a span of 540 m along strike and 600 m vertical extent, showing wide intervals of

elevated radioactivity that remain open at depth and along strike. In comparison, previously reported holes

from PCE had identified two mineralized holes, 275 m apart.

Off-scale (>61,000 cps) high-grade uranium mineralization has been intersected in four drillholes to date,

including RK-24-183, -197, -202, and -207. The most recent intersection in RK -24-207 contains the first

instance of massive replacement by uraninite, a key indicator of a strongly mineralized system (Figures 3

and 4, Table 1) with 1.5 m >10,000 cps (inc luding 0.3 m >61,000 cps) within cumulative interval

mineralization of 26.2 m > 500 cps (Table 2).

Results include the best and most recent intercept in RK-24-207, that confirms continuity of mineralization,

massive replacement uranium and significant high grade at PCE (Table 1) . The high -intensity style

mineralization is indicative of exceptional formation conditions linked to significant orebodies within the

Athabasca Basin and most notably the Arrow Deposit 3.5 km to the west. In addition, this zone of high -

intensity mineralization in RK-24-207 is at a similar depth to Arrow’s A2 high-grade heart. PCE, like Arrow,

is contained solely in the competent basement rock which is the ideal underground setting. The mineralized

signature is expressed as very analogous to Arrow, localized veins (up to off-scale >61,000 cps ) within

elevated radioactivity that extends over more than 100 m.

Summer drilling to date totals 10,045.5 m of the planned 22,000 m from 12 completed drillholes. Assays

from disclosed mineralized intersections are pending and due in Q4 2024.

As a consequence of these results, the focus of the summer program has substantially elevated with two

primary objectives:

- continue to test the extent of the mineralized system through bold step outs, and

- vector in on the high-grade zones within the broader mineralized system.

Leigh Curyer, Chief Executive Officer, commented: “ In the first two months of the summer program , the

results have rapidly indicated an expansive, mineralized footprint with remarkable continuity. Geological

characteristics are very analo gous to Arrow indicating a large, pervasive and high -grade system. The

summer program has been purposely bold with very large drill step outs and has intersected mineralization

in an additional 8 of the 12 holes drilled. Important to note, PCE has currently hit 4 holes with intense

mineralization >61,000 cps, with this occurring at Arrow for the first time in the 15 th hole - which led to

subsequently delineating broad ultra-high grade zones in the A2 shear of Arrow.

Discoveries of the calibre of Arrow all take their own path in terms of time and extent of drilling to fully

define. PCE is now commencing its path showing all the characteristics of Arrow at the same stage . PCE

validates the continued prospectivity of the NexGen land package is immense and underpins the southwest

Athabasca Basin as the future of Canada’s uranium industry growth over the balance of this century.

NexGen is at an incredibly exciting stage , focused on concluding the Federal Environmental Assessment

for the Rook I Project, construction readiness on receipt of final approvals and in parallel drilling a newly

discovered zone of mineralization.”

Mineralization is hosted as semi -massive to massive pitchblende veins, fracture coatings, and

disseminations. Structures focus the mineralization via reactivated shears and faults while competent wall

rock (silicified orthogneiss) acts as a physical trap. The mineralization and alteration patterns depict a well-

developed hydrothermal fluid system. Typical alteration associated with the mineralization includes the

formation of iron -rich minerals ( hydrothermal hematite ), iron oxide (limonite), clay, and chlorite. These

characteristics combined with the size of the mineralized footprint, as well as the presence of >61,000 cps,

demonstrates the similarities between PCE and Arrow at the same stage.

Figure 1: Schematic plan view of mineralized footprint at Arrow and PCE at the same stage of drilling; gravity as

background with low values in blue

Figure 2: Schematic long section of mineralized footprint at Arrow and PCE at the same stage of drilling

Figure 3: Core photo from RK-24-207; high grade mineralization is hosted across 7.1 m from 523.9 to 531 m with

outer low grade disseminated uranium extending above to 519.4 and below to 534.4 m; Narrow secondary veins are

hosted nearby in the footwall below

Figure 4: RK-24-207 close-up of off-scale (>61,000 cps) massive replacement by uraninite at 525.1 m

Figure 5: RK-24-202 uraninite as blebs along foliation and fracture coating at 934.4 m, max peak of >61,000 cps

Figure 6: RK-24-202 mineral replacement by uraninite within shear zone at 967.5 m, max peak of 49,000 cps

Table 1: 2024 Summer program spectrometer results to date

Drillhole

Unconformity

Depth (m)

Handheld Spectrometer Results (RS-125)

Hole ID Azimuth Dip

Total

Depth

(m)

From

(m) To (m) Width

(m) CPS Range

RK-24-195 310 -70 588.0 N/A 171.5 172.0 0.5 <500 - 1,500

172.0 172.5 0.5 <500

192.0 192.5 0.5 <500

216.0 216.5 0.5 <500

RK-24-196 310 -70 841.0 103.4 701.5 703.0 1.5 <500

703.0 703.5 0.5 1,600 - 2,500

703.5 704.0 0.5 <500

704.0 704.5 0.5 570 - 1,320

705.5 706.0 0.5 <500 - 520

723.5 724.0 0.5 <500 - 600

731.0 731.7 0.7 <500

731.7 731.8 0.1 3,380 - 4,180

731.8 731.9 0.1 10,000 - 14,000

731.9 732.0 0.1 <500

732.0 732.1 0.1 <500 - 3,100

732.5 736.5 4.0 <500 - 3,100

741.0 741.5 0.5 <500 - 4,000

742.5 743.0 0.5 <500 - 1,000

744.5 745.0 0.5 <500

745.0 745.5 0.5 <500 - 1,350

745.5 746.0 0.5 <500

746.0 746.5 0.5 <500 - 520

746.5 747.0 0.5 <500 - 530

747.0 748.0 1.0 <500

748.5 749.0 0.5 <500

749.5 750.0 0.5 <500 - 3,200

750.0 750.5 0.5 <500 - 2,100

757.0 757.5 0.5 <500 - 2,350

758.0 758.5 0.5 <500

760.0 760.5 0.5 <500

765.5 766.6 1.1 <500

RK-24-197 310 -70 792.0 117.7 241.0 241.5 0.5 <500

518.0 521.5 3.5 <500

523.5 524.0 0.5 <500

524.0 524.5 0.5 <500 - 990

524.5 525.0 0.5 <500 - 2990

525.0 525.5 0.5 <500 - 2510

525.5 526.0 0.5 <500 - 660

526.0 526.4 0.4 <500 - 10,000

526.4 526.6 0.2 10,000 - 13,050

526.6 527.0 0.4 510 - 6,550

527.0 527.5 0.5 1,040 - 9,560

527.5 527.6 0.1 9,580 - 10,000

527.6 527.8 0.2 10,000 - 26,400

527.8 528.5 0.7 <500

528.5 528.8 0.3 940 - 10,000

528.8 528.9 0.1 10,000 - 46,400

528.9 529.0 0.1 865 - 2,250

529.0 529.5 0.5 <500

530.5 535.5 5.0 <500

536.0 536.5 0.5 <500

546.0 546.5 0.5 <500

546.5 547.0 0.5 <500

547.0 547.5 0.5 <500 - 670

547.5 548.0 0.5 <500

548.0 548.5 0.5 <500 - 890

548.5 548.6 0.1 1,000 - 8,200

548.6 548.8 0.2 21,200 - 33,800

548.8 549.0 0.2 42,600 - 52,800

549.0 549.5 0.5 600 - 1,500

549.5 550.0 0.5 2,200 - 4,400

550.0 550.5 0.5 <500 - 1,600

550.5 551.0 0.5 <500

551.0 551.5 0.5 <500 - 620

551.5 552.0 0.5 <500 - 550

552.0 552.5 0.5 1,300 - 2,000

552.5 552.6 0.1 25,000 - 32,000

552.7 552.9 0.2 40,100 - >61,000

552.9 553.0 0.1 17,100 - 25,000

553.0 553.5 0.5 <500 - 1,500

RK-24-198 310 -70 743.2 117.3 333.5 334.0 0.5 <500

669.5 670.0 0.5 <500

RK-24-199 310 -70 807.0 107.1 No Significant Intersections

RK-24-200 310 -70 804.0 112.6 339.0 339.5 0.5 <500

354.0 354.5 0.5 <500 - 750

465.5 466.0 0.5 <500 - 600

611.0 611.5 0.5 <500 - 660

612.0 612.5 0.5 <500

613.0 613.5 0.5 <500 - 970

619.0 619.5 0.5 <500 - 510

619.5 620.0 0.5 <500

623.0 623.5 0.5 <500

RK-24-201 310 -70 939.0 108.9 412.5 413.0 0.5 <500

673.5 674.0 0.5 <500

674.5 675.0 0.5 <500

675.0 675.5 0.5 <500 - 3,800

675.5 676.0 0.5 <500

677.5 678.0 0.5 <500 - 550

678.5 679.0 0.5 650 - 700

679.0 679.5 0.5 <500

680.0 681.0 1.0 <500

693.5 694.0 0.5 700 - 800

694.0 695.0 1.0 <500

695.0 695.5 0.5 700 - 900

695.5 696.0 0.5 <500

696.0 696.5 0.5 500 - 1,800

696.5 697.0 0.5 500 - 2,600

697.0 699.0 2.0 <500

699.5 700.5 1.0 <500

700.5 701.0 0.5 650 - 700

701.0 701.5 0.5 <500 - 550

701.5 702.0 0.5 <500 - 600

702.0 702.5 0.5 <500 - 750

703.0 703.5 0.5 <500

708.0 709.0 1.0 <500

721.5 722.0 0.5 <500

741.0 741.5 0.5 <500

765.5 766.0 0.5 <500 - 1300

819.0 819.5 0.5 <500 - 1800

822.5 823.0 0.5 <500 - 630

837.5 838.0 0.5 <500

867.5 868.0 0.5 <500

RK-24-202 310 -70 1138.2 106.3 622.5 623.0 0.5 <500

623.5 624.0 0.5 <500

732.0 732.5 0.5 <500

780.5 781.0 0.5 <500

846.0 850.3 4.3 <500

886.0 886.2 0.2 <500 - 1,780

886.2 886.3 0.1 10,000 - 14,100

886.3 886.5 0.2 <500 - 1,700

887.5 888.0 0.5 <500 - 1,300

895.5 896.0 0.5 <500 - 3,200

907.0 908.0 1.0 <500

922.5 923.0 0.5 <500 - 650

926.5 927.0 0.5 <500

928.0 928.5 0.5 <500 - 540

931.0 931.5 0.5 <500 - 3,400

931.5 932.0 0.5 <500 - 1,050

932.0 932.5 0.5 <500 - 650

933.5 934.0 0.5 <500 - 2,580

934.0 934.3 0.3 <500 - 6,100

934.3 934.4 0.1 55,500 - >61,000

934.4 934.5 0.1 <500

936.0 936.3 0.3 <500

936.3 936.4 0.1 12,000 - >61,000

936.4 936.5 0.1 530 - 650

943.5 944.0 0.5 <500 - 2,290

944.0 944.5 0.5 <500 - 800

947.0 947.5 0.5 <500

948.5 949.0 0.5 <500

951.0 951.5 0.5 <500

951.5 951.7 0.2 850 - 3,200