Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NWST.V ·

NORTHWEST COPPER DISCOVERS NEW MINERALIZED ZONE AT THE LORRAINE-TOP CAT PROJECT First Ever Drill Assays from the Road IP Target Return 104.7 metres at 0.13% Copper

Drill Results

News Release

NORTHWEST COPPER DISCOVERS NEW MINERALIZED ZONE AT THE

LORRAINE-TOP CAT PROJECT

First Ever Drill Assays from the Road IP Target Return 104.7 metres at 0.13% Copper

Vancouver, BC – October 10th, 2024 – NorthWest Copper (“NorthWest” or “the Company”) (TSX-V: NWST)

is pleased to announce the discovery of a new mineralized zone at the Lorraine -Top Cat pro ject ( the

“Project”). The first ever drill assays from the Project’s Road IP Target returned 104.7 metres of 0.13%

copper (“Cu”). This area has never been drilled before and the closest historical drill hole is 6.3 kilometres

away. Highlights from the Project’s 2024 drill program include:

• IP-24-002: 104.7 metres1 of 0.13% Cu from 58.3 metres downhole;

o including 7.4 metres of 1.10% Cu from 147.6 metres downhole.

• IP-24-001: 60.0 metres of 0.06% Cu from 127.0 metres downhole.

• NV-24-001: 24.0 metres of 0.08% Cu from 241.0 metres downhole.

“We are very encouraged by the results from holes drilled at the Road IP and Nova Targets this summer,”

said Tyler Caswell, NorthWest Copper’s VP Exploration. “ We drilled two new target areas and hit base

metal mineralization in all of the holes.”

“The results from this drilling support our thesis that we can find more mineralized centres outside of the

existing Lorraine resource,” commented Mr. Caswell. “There is still a lot of discovery potential at Lorraine-

Top Cat. The geology we are seeing at the Road IP target area is similar in style to a calc-alkalic porphyry

copper system, analogous to the Central Zone at our Kwanika-Stardust project, and which is potentially a

large tonnage, high-grade target type.”

Exercise of Top Cat Option

As of the date of this news release, the Company has now made all required cash payments, issued all

required common share payments, and incurred the required exploration expenditures under an option

agreement entered in July 2019. The Company has now acquired 100% ownership of the Top Cat claims,

subject to a 3% net smelter royalty (NSR). The Company may purchase 2% of the NSR for $2,000,000 at

any time prior to the first anniversary of commercial production on the Top Cat property.

2024 Lorraine-Top Cat Program

Approximately 800 m etres of drilling was completed in July 2024 at the regional Nova and Road IP

Targets2. The objective of th e program was to expand known mineralization to areas outside of the

current Lorraine mineral resource estimate (“MRE”) (indicated resources of 12.952 million tonnes (“Mt”)

grading 0.55% Cu and 0.16 g/t gold (“Au”), and inferred resources of 45.252 Mt grading 0.43% Cu and 0.10

1 True widths of the reported mineralized intervals have not been determined

2 See news releases dated July 4, 2024 and August 1, 2024 available at www.northwestcopper.ca and www.sedarplus.com.

Page 2 of 10

g/t Au at 0.20% copper cut -off grade)3,4. Three holes were drilled, one at the Nova Target (356 metres)

and two at the Road IP Target (456 metres total). The program was successful in its objective as it

discovered mineralization in two previously un-drilled target areas. Follow-up drilling is recommended at

these targets to delineate size potential and the potential high-grade core of the system.

Figure 1. Location of the Nova and Road IP Targets relative to NorthWest’s mineral tenure at Lorraine- Top Cat.

Road IP Target

The Road IP Target is defined by an IP chargeability anomaly that is coincident with a magnetic low (630 x

425 metres) with a subtle magnetic high in the middle ( Figure 2). Additionally, historical surface

geochemical samples show a geochemical anomaly coincident with these geophysical anomalies. Outcrop

has not been identified in the area and the target area remains covered by a veneer of glacial sediments.

The closest historical drill hole at Lorraine-Top Cat is 6.3 km away from this target area. Two diamond drill

holes were completed from a single drill pad at the Road IP Target and both encountered mineralization.

3 See NI 43 -101 technical report titled “Lorraine Copper -Gold Project NI 43 -101 Report & Mineral Resource Estimate Omineca Mining Division, B.C”,

dated September 12, 2022 with an effective date of June 30, 2022, filed under the Company’s SEDAR + profile at www.sedarplus.com.

4 Indicated and inferred mineral resources are not mineral reserves. Mineral resources which are not mineral reserves do not have demonstrated economic

viability. There is no guarantee that any part of the mineral resources discussed herein will be converted into a mineral reserve in the future. The estimate

of mineral resources may be materially affected by environmental, permitting, legal, marketing or other relevant issues.

Page 3 of 10

The first hole IP -24-001 was drilled to a depth of 1 87 metres and stopped in mineralization due to

challenging ground conditions, whereas the second was drilled to a depth of 269 metres.

Drill hole IP-24-001 (Road IP Target)

IP-24-001 was the first of two diamond drill holes drilled at the Road IP Target (Figure 2 & Figure 3). Drilling

was terminated prior to planned target depth due to difficult ground conditions. D rilling results show a

broad zone of anomalous copper-silver mineralization with 60.0 metres of 0.06% Cu and 0.2 g/t Ag from

127.0 metres to the end of hole. Mineralization remains open downhole. Chalcopyrite occurs on fracture

coatings and within quartz- sulphide veinlets hosted by a quartz monzodiorite to quartz monzonite

intrusion. The mineralized interval starts within a fault zone that marks a significant change to a more

intense potassium feldspar alteration that hosts chalcopyrite-pyrite and trace molybdenite

mineralization.

Figure 2. Plan view of the Road IP magnetics anomaly with lithology and copper grade plotted downhole.

Page 4 of 10

Figure 3. Cross-section of Road IP Drill hole IP-24-001 with lithology and copper grade plotted downhole.

Drill hole IP-24-002 (Road IP Target)

Hole IP-24-002 was the second of two diamond drill holes at the Road IP T arget. Assay results show a

broad zone of anomalous copper-silver mineralization with 104.7 metres of 0.13% Cu , 0.01 g/t Au and

0.5 g/t Ag from 58.3 metres , which includes 7.4 metres of 1.10% Cu , 0.04 g/t Au and 5.6 g/t Ag from

147.6 metres downhole . Mineralization occurs as chalcopyrite and pyrite hosted in quartz- sulphide

veinlets and as fine disseminations and fracture coatings in quartz monzodiorite to quartz monzonite

intrusion. Higher grade mineralization is coincident with zones of increased quartz-sulphide vein density

and an increase in potassium feldspar alteration intensity.

Page 5 of 10

Figure 4. Cross-section of Road IP Drill hole IP-24-002 with lithology and copper % plotted downhole

Drill hole NV-24-001 (Nova Target)

NV-24-001 was drilled at the Nova target and was designed to test a highly chargeable Induced

Polarization (IP) anomaly that is coincident with a very strong magnetic high (Figure 5). Historical surface

geochemical samples also showed polymetallic mineralization coincident with the anomaly. The closest

historical drill hole on the Lorraine-Top Cat project is 11 km away from this drill collar. Assay results show

discrete zones of anomalous precious and base metal mineralization, including 12.0 metres of 0.07% Cu,

0.2 g/t Ag, and 0.04 g/t Pd from 208.0 metres, and 24.0 metres of 0.08% Cu, 0.4 g/t Ag, and 0.02 g/t Pd

from 241.0 metres downhole (Figure 6). Mineralization in both zones occurs as finely disseminate d

chalcopyrite and pyrite in fine -grained pyroxenite with abundant chlorite and magnetite, and patchy

biotite and epidote alteration. In the lower interval, c halcopyrite also occurs within a 1.5-metre interval

of sheared quartz- carbonate-sulphide veins at the end of the intersection , which could demonstrate a

structurally controlled zone of mineralization.

Page 6 of 10

There are two additional zones with anomalous palladium-silver mineralization with 7.15 metres of 0.15

g/t Pd and 0.5 g/t Ag from 54.0 metres, and 16.0 metres of 0.11 g/t Pd and 0.4 g/t Ag from 172.0 metres

(Figure 6). There is also a weak correlation in these zones with copper, with each intersection returning

0.03% Cu & 0.04% Cu , respectively. Mineralization in both intersections is also hosted in fine -grained

pyroxenite with abundant chlorite and magnetite, with patchy biotite and epidote alteration.

Figure 5. Plan view of Nova target area with magnetics.

Page 7 of 10

Figure 5. Cross-section showing lithology and copper assays for drillhole NV-24-001

Table 1: Drill Results from this News Release

Hole From (m) To (m) Interval (m)5 Cu (%) Au (g/t) Ag (g/t) Pd (g/t)

NV-24-001 54.0 61.15 7.15 0.03 0.01 0.5 0.15

NV-24-001 172.0 188.0 16.0 0.04 0.01 0.4 0.11

NV-24-001 208.0 220.0 12.0 0.07 0.01 0.2 0.04

NV-24-001 241.0 265.0 24.0 0.08 - 0.4 0.02

IP-24-001 127.0 187.0 60.0 0.06 0.01 0.2 -

IP-24-002 58.3 163.0 104.7 0.13 0.01 0.5 -

incl. 147.6 155.0 7.4 1.10 0.04 5.6 -

5 True widths of the reported mineralized intervals have not been determined

Page 8 of 10

The Lorraine-Top Cat Project

The Lorraine-Top Cat Project covers 65,000 hectares and is located in north-central British Columbia, 280

km northwest of Prince George, BC and approximately 4 5 km north of NorthWest’s Kwanika -Stardust

Project. The Project comprises the contiguous Lorraine and Top Cat properties.

Rock types across the Project are dominated by intrusions of the Hogem Batholith that were emplaced

into mafic volcanic and sedimentary rocks of the Late Triassic Takla Group. Intrusions include mafic to

felsic phases of the calc-alkalic Thane Creek suite and, possibly, the younger Osilinka suite of the Hogem

Batholith, which was subsequently intruded by Early Jurassic, alkalic ultramafic to felsic rocks of the

Duckling Creek Syenite Complex (“DCSC”). At least 30 exploration targets for copper -gold-silver±PGE

mineralization are distributed across the Project. Most prospects are hosted by the DCSC, with additional

prospects, such as the Steelhead and Road IP targets, hosted by the older phases of the Hogem. A smaller

number of copper-gold targets are associated with Late Triassic intermediate calc-alkalic intrusions on the

east side of the property, including the Dorothy -Rhonda and Cat Mountain targets. Currently, the most

important feature of the Project is the Lorraine deposit. This significant deposit is located near the centre

of the Project tenure and is a silica-undersaturated alkalic copper-gold-silver-PGE porphyry deposit, which

is the same classification as the Galore Creek and Mount Polley deposits. Mineralization at the Lorraine

deposit is hosted mostly by Early Jurassic syenite and pyroxenite intrusions of the DCSC.

A compliant mineral resource estimate (MRE) was completed in 2022 that includes indicated resources of

12.952 Mt grading 0.55% Cu and 0.16 g/t Au, and inferred resources of 45.252 Mt grading 0.43% Cu and

0.10 g/t Au. As described in previous disclosures, h owever, gold concentration is likely under- reported

and silver was not included in the estimation because many historical drill holes were inconsistently

analyzed for the two metals. The MRE extends to surface and includes the Lower Main, Upper Main, and

Bishop Zones and intervening, more sparsely drilled rock. Copper sulphides manifest various combinations

of chalcopyrite, bornite and hypogene chalcocite, and the concentration of pyrite is generally low. Gold,

silver, copper, and palladium in the deposit are all closely related, as illustrated by flotation results on five

scoping metallurgical composites from the Lower Main and Bishop Zones, which returned cleaner

flotation recoveries of up to 94% for copper, 71% for gold, 92% for silver and 76% for palladium to a high-

grade concentrate that contains 31 -54% copper and has low concentrations of potentially deleterious

trace metals6.

Quality Assurance / Quality Control (QA/QC)

Drilling completed at Lorraine-Top Cat in 2024 was supervised by on-site NorthWest personnel. Samples

were collected, tracked and a full QA/QC program was implemented using blanks, standards and field

duplicates to monitor analytical accuracy and precision. The samples were sealed on site and shipped to

Activation Laboratories Ltd. (“Actlabs”) in Kamloops BC. Actlabs quality control system complies with

global certifications for quality ISO 17025. Drill core samples were analyzed using a combination of Actlabs

1F2 process for low level concentrations (4-Acid Digestion, ICP-OES) and the 8-4 Acid ICP-OES process for

higher level concentrations ( 4-Acid Digestion, ICP -OES with automatic overlimits for base metals and

silver). Gold, platinum and palladium assaying was completed with 1C-OES, a 30-gram fire assay with ICP

finish.

6 See news release dated June 24, 2024 available at www.northwestcopper.ca and www.sedarplus.com.