Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NWI.CN ·

Nuinsco Provides Update to Initial Mineral Resource Estimate on the Prairie Lake Critical Minerals & Phosphate Project

Resource Estimates

Nuinsco Provides Update to Initial Mineral Resource Estimate on the  

Prairie Lake Critical Minerals & Phosphate Project 

HIGHLIGHTS: 

 Very large Mineral Resource located in the heart of North America: 

o 871.8  million  tonne  Inferred  Mineral  Resource  including  2.01  kg /t  total  rare  earth  oxides 

(“TREO”), plus niobium and phosphate. 

o 15.6  million  tonne  Indicated  Mineral  Resource  including  1.67  kg /t  TREO,  plus  niobium  and 

phosphate. 

 Located in the heart of North America in Ontario, Canada, a stable, mining friendly, jurisdiction 

 Near to transport and power infrastructure – ready access to markets, both domestic and international. 

 P o s i t i o n e d  t o  b e  a  k e y  N o r t h  A m e r i c a n  s o u r c e  o f  C r i t i c a l  M i n e r als  as  identified  by  the  Canadian 

government (rare earth elements (“REEs”) and niobium) to meet a n anticipated enormous expansion in 

demand for such products. 

Toronto, June 15, 2022  – Nuinsco Resources Limited (“ Nuinsco” or the “ Company”) (CSE: NWI) today provided 

supplemental  information,  highlighting  the  development  potentia l  of  the  recently  announced  initial  Mineral 

Resource Estimate (“ MRE”) on its Prairie Lake Critical Minerals and Phosphate Project  located near Terrace Bay, 

Ontario, Canada (“Prairie Lake” or the “Project”).   

2

The significance of the size of the Prairie Lake MRE and the implications of this for a large, secure, domestic supply 

of Critical Minerals is readily apparent.  Reports of expanding demand for such minerals, in a myriad of applications 

in  transportation,  power  distrib ution,  green  technologies  and  a   host  of  others  (including  agriculture)  are 

innumerable.  In fact demand has already begun to expand and is projected to increase rapidly in the coming years.  

A large, well located, source of Critical Minerals in North America is of immense added value to the security of the 

supply chain; an issue identified by both the Canadian and US governments both of which are attempting to address 

with incentives and programs to encourage development of the Critical Minerals sector.  The Project is located near 

the north shore of Lake Superior, putting it in close or easily accessible reach of: 

 The towns of Terrace Bay and Marathon and other smaller villages, able to supply a local workforce 

and equipment. 

 Highway 17 and Highway 11. 

 Canadian Pacific Railway and Canadian National Railway networks. 

 High‐capacity (500kV) electrical power transmission line. 

 Deep‐water ports at Thunder Bay and Sault Ste. Marie, able to handle ocean going ships. 

“With the recent announcement of the initial Prairie Lake MRE, it is important to reiterate some of the factors that 

add to the significance of the mineral endowment,” said Paul Jo nes, Nuinsco’s CEO.  "First off, the size of the MRE 

is  remarkable,  and  the  deposit  remains  open  for  potential  future  increase.  The  Project  is  very  well  located  in 

northwestern Ontario in a stable, mining‐friendly jurisdiction able to provide secure supply for the projected rapid 

expansion  in  demand  for  Critical  Minerals  by  North  American,  an d  global,  industry.    Infrastructure  is  well 

established and located nearby, which will positively impact ca pital costs.  The Critical  Minerals are required to 

meet  the  demands of globally expanding electrification and impl ementation  of “green” technologies to combat 

climate change, and the phosphate  to sustain and improve agricu ltural productivity.  We are obviously extremely 

pleased  with  the  recent  developments  on  the  Project  and  the  impl i c at i o n s  f o r  d e v e l o p i n g  s u c h  a l a r g e  M i n e r a l 

Resource in such a geographically and logistically favourable location.  The Company is aggressively moving forward 

with other aspects of technical and economic evaluation on the Project. 

As tabulated below, the pit‐constrained MRE consists of a 15.6 million tonne Indicated Mineral Resource and a very 

large 871.8 million tonne Inferred Mineral Resource. The MRE also includes niobium and phosphate in oxides which, 

along with the TREO, are expected to be key drivers of a Preliminary Economic Assessment on the Project that will 

commence shortly.   

Prairie Lake Project Pit‐Constrained Mineral Resource Estimate(1‐6) 

      Rare Earth Oxides  Niobium  Phosp

hate 

Class  Cut‐Off  Tonnes  Nd 2O3 P r 6O11 S c 2O3 C e O 2 L a 2O3 S m 2O3 T a 2O5 Y 2O3 T R E O   N b 2O5 P 2O5 

  NSR C$/t  M  g/t  g/t  g/t  g/t  g/t  g/t  g/t  g/t  kg/t  %  % 

Indicated  30  15.6  344  96  15  754  300  58  28  100  1.67  0.16  3.71 

Inferred  30  871.8  409  82  18  905  388  79  17  127  2.01  0.10  3.39 

*TREO = Total Rare Earth Oxides: neodymium, Nd2O3 ; praseodymium, Pr6O11; scandium, Sc2O3; Cerium, CeO2; lanthanum, La2O3; samarium, 

Sm2O3; yttrium, Y2O3. 

1.  Mineral Resources that are not  Mineral Reserves do not have demonstrated economic viability. 

The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio‐

political, marketing, or other relevant issues. 

3.  The Inferred Mineral Resource  in this estimate has a lower level of confidence than that applied to an Indicated Mineral 

Resource and must not be converted to a Mineral Reserve. It is  reasonably expected that the  majority of the Inferred 

Mineral Resource could potentially be upgraded to an Indicated Mineral Resource with continued exploration. 

4. The Mineral Resources were estimated in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum 

(CIM),  CIM  Standards  on  Mineral  Resources  and  Reserves,  Definitions  (2014)  and  Best  Practices  Guidelines  (2019) 

prepared by the CIM Standing Committee on Reserve Definitions and adopted by the CIM Council. 

3

5.  US$ Metal prices used were $80/Kg Nd 2O3, $80/Kg Pr6O11, $1,500/Kg Sc2O3, $50/Kg Nb2O5, $250/t P2O5, $1.35/Kg CeO2, 

$1.35/Kg La2O3, $3.50/Kg Sm2O3, Nil$/t Ta2O5 and $13.00/kg Y 2O3, 0.78 FX all with combine d process recoveries and 

payables of 50%,  except P2O5 at 75%.  

6.  The constraining pit optimization parameters were C$2.50/t m ining cost for all material, C$25/t process cost, C$5/t 

G&A cost and 45‐degree pit slopes with a C$30/t NSR cut‐off. 

The Government of Canada has identified 31 Critical Minerals, including the REEs and niobium identified at Prairie 

Lake, that are considered essential for the sustainable economic success of Canada and its allies under its Canadian 

Minerals and Metals Plan (“ CMMP”). As part of its commitment under the CMMP, the Government is  identifying 

initiatives designed to bolster Canadian Critical Minerals proj ects and supply chain development to help advance 

the competitiveness of the country’s minerals and metals sector. 

The Prairie Lake MRE was conducted in accordance with National  Instrument 43‐101 (" NI 43‐101") standards of 

disclosure and the CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014).  The Project 

consists of 46 mineral claims covering an area of ~630 ha and i s superbly located in a politically stable jurisdiction; 

is exceptionally well located near available rail, road, shippi ng, and power infrastructure; and is ideally placed in 

North America with respect to current supply chain concerns for critical minerals.  The mineralization of economic 

interest contained within the Prairie Lake complex occurs at su rface and extends to unknown depths below the 

deepest drilling yet conducted (circa 525 metres vertically). T here is no indication that mineralization diminishes 

with depth and is known to occur at surface throughout the extents of the complex.   

Eugene Puritch, P.Eng., FEC, CET  acts as Nuinsco's independent Qualified Person under National I nstrument 43‐

101. Mr. Puritch has reviewed and approved the technical contents of this news release. A technical report, which 

is being  prepared in accordance with  National Instrument 43‐101 , will be available on SEDAR ( www.sedar.com) 

under the Company's issuer profile within 45 days of the May 31, 2022 announcement of the MRE. 

About Nuinsco Resources Limited 

Nuinsco Resources has over 50 years of exploration success and  is a growth‐oriented, multi‐commodity mineral 

exploration company focused on prospective opportunities in Can ada and internationally. Currently the Company 

has four properties in Ontario – the high‐grade Sunbeam Gold Property near Atikokan, the Dash Lake Gold Property 

near Terrace Bay, the large multi‐commodity (rare‐earths, niobium, tantalum, phosphate) Prairie Lake Project near 

Terrace  Bay,  and  the  Zig  Zag  Lake  Property  (lithium,  tantalum)  near  Armstrong.  In  addition,  Nuinsco  has  an 

agreement for gold exploitation at the El Sid Project in the Eastern Desert of Egypt. 

Cautionary Note Regarding Forward‐Looking Information 

This press release contains forward‐looking statements or infor mation (collectively, “FLI”) within the meaning of 

applicable Canadian securities legislation. FLI is based on exp ectations, estimates, projections and interpretations 

as at the date of this press release.  

All  statements,  other  than  statements  of  historical  fact,  inclu d e d  h e r e i n  a r e  F L I  t h a t  i n v o l v e  v a r i o u s  r i s k s ,  

assumptions,  estimates  and  uncertainties.  Generally,  FLI  can  be id e n ti f i e d b y  th e  us e  o f s tat e me n ts  t ha t i n c l u de 

words  such  as  “seeks”,  “believes” ,  “anticipates”,  “plans”,  “con tinues”,  “budget”,  “scheduled”,  “estimates”, 

“expects”, “forecasts”, “intends”, “projects”, “predicts”, “pro poses”, "potential", “targets” and variations of such 

words and phrases, or by statements that certain actions, events or results “may”, “will”, “could”, “would”, “should” 

or “might”, “be taken”, “occur” or “be achieved.” 

FLI  herein  includes,  but  is  not  limited  to:  future  drill  results;  the  Company’s  ability  to  convert  Inferred  Mineral 

Resources into Measured and Indicated Mineral Resources; enviro nmental matters; stakeholder engagement and 

relationships; parameters and methods used to estimate the Mineral Resources (each an “MRE”) at the Fenelon and 

Martiniere  properties  (collectively  the  “Deposits”);  the  prospects,  if  any,  of  the  Deposits;  future  drilling  at  the 

Deposits; and the significance of historical exploration activities and results.  

FLI is designed to help you understand management’s current vie ws of its near‐ and longer‐term prospects, and it 

4

may not be appropriate for other purposes.  FLI by their nature  are based on assumptions and involve known and 

unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of 

the Company to be materially different from any future results, performance or achievements expressed or implied 

by such FLI. Although the FLI contained in this press release i s based upon what management believes, or believed 

at the time, to be reasonable assumptions, the Company cannot assure shareholders and prospective purchasers of 

securities of the Company that actual results will be consisten t with such FLI, as there may be other factors that 

cause  results  not  to  be  as  anticipated,  estimated  or  intended, and  neither  the  Company  nor  any  other  person 

assumes responsibility for the accuracy and completeness of any such FLI.  Except as required by law, the Company 

does not undertake, and assumes no obligation, to update or rev ise any such FLI contained herein to reflect new 

events or circumstances, except as may be required by law. Unle ss otherwise noted, this press release has been 

prepared based on information available as of the date of this press release. Accordingly, you should not place undue 

reliance on the FLI or information contained herein.  

Furthermore,  should  one  or  more  of  the  risks,  uncertainties  or other  factors  materialize,  or  should  underlying 

assumptions prove incorrect, actual results may vary materially from those described in FLI. 

Assumptions upon which FLI is based, without limitation, includ e: the ability of exploration activities to accurately 

predict  mineralization;  the  accuracy  of  geological  modelling;  the  ability  of  the  Company  to  complete  further 

exploration activities; the legitimacy of title and property interests in the Deposits; the accuracy of key assumptions, 

parameters or methods used to estimate the MREs; the ability of  the Company to obtain required approvals; the 

results  of  exploration  activities;  the  evolution  of  the  global  economic  climate;  metal  prices;  environmental 

expectations;  community  and  non‐governmental  actions;  and  any  i m p a c t s  o f  C O V I D ‐ 1 9  o n  t h e  D e p o s i t s ,  t h e  

Company’s  financial  position,  the  Company’s  ability  to  secure  r equired  funding,  or  operations.  Risks  and 

uncertainties  about  the  Company’s  business  are  more  fully  discussed  in  the  disclosure  materials  filed  with  the 

securities regulatory authorities in Canada, which are available at www.sedar.com. 

Information Concerning Estimates of Mineral Resources 

The disclosure in this press release and referred to herein was  prepared in accordance with NI 43‐101 which differs 

significantly  from  the  requirements  of  the  U.S.  Securities  and  Exchange  Commission  (the  "SEC").    The  terms 

"Measured  Mineral  Resource",  "Indicated  Mineral  Resource"  and  "Inferred  Mineral  Resource"  used  in  this  press 

release are in reference to the mining terms defined in the Canadian Institute of Mining, Metallurgy and Petroleum 

Standards  (the  "CIM  Definition  Standards"),  which  definitions  have  been  adopted  by  NI  43‐101.    Accordingly, 

information contained in this press release providing descriptions of our mineral deposits in accordance with NI 43‐

101 may not be comparable to similar information made public by other U.S. companies subject to the United States 

federal securities laws and the rules and regulations thereunder. 

Investors are cautioned not to assume that any part or all of Mineral Resources will ever be converted into Mineral 

Reserves. Pursuant to CIM Definition Standards, "Inferred Miner al Resources" are that part of a Mineral Resource 

for which quantity and grade or quality are estimated on the ba sis of limited geological evidence and sampling.  

Such geological evidence is sufficient to imply but not verify geological and grade or quality continuity.  An Inferred 

Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and must not 

b e  c o n v e r t e d  t o  a  M i n e r a l  R e s e r v e .  H o w e v e r ,  i t  i s  r e a s o n a b l y  e xpected  that  the  majority  of  Inferred  Mineral 

Resources could be upgraded to Indicated Mineral Resources with  continued exploration.  Under Canadian rules, 

estimates of Inferred Mineral Resources may not form the basis  of Feasibility or Pre‐Feasibility studies, except in 

rare cases.  Investors are cautioned not to assume that all or any part of an Inferred Mineral Resource is economically 

or legally mineable.  Disclosure of "contained ounces" in a Mineral Resource is permitted disclosure under Canadian 

regulations;  however,  the  SEC  normally  only  permits  issuers  to report  mineralization  that  does  not  constitute 

"Mineral Reserves" by SEC standards as in place tonnage and grade without reference to unit measures. 

Canadian standards, including the CIM Definition Standards and NI 43‐101, differ significantly from standards in the 

SEC Industry Guide 7.  Effective February 25, 2019, the SEC adopted new mining disclosure rules under subpart 1300 

5

of Regulation S‐K of the United  States Securities Act of 1933,  as amended (the "SEC Modernization Rules"), with 

compliance required for the first fiscal year beginning on or a fter January 1, 2021.  The SEC Modernization Rules 

replace the historical property disclosure requirements included in SEC Industry Guide 7.  As a result of the adoption 

of the SEC Modernization Rules, the SEC now recognizes estimate s of "Measured Mineral Resources", "Indicated 

Mineral  Resources"  and  "Inferred  Mineral  Resources".    Information  regarding  Mineral  Resources  contained  or 

referenced in this press release may not be comparable to similar information made public by companies that report 

according to U.S. standards.  While the SEC Modernization Rules  are purported to be "substantially similar" to the 

CIM Definition Standards, readers are cautioned that there are  differences between the SEC Modernization Rules 

and the CIM Definitions Standards. Accordingly, there is no assurance any Mineral Resources that the Company may 

report as "Measured Mineral Resources", "Indicated Mineral Resources" and "Inferred Mineral Resources" under NI 

43‐101 would be the same had the Company prepared the Mineral Resource Estimates under the standards adopted 

under the SEC Modernization Rules. 

To learn more, please visit www.nuinsco.ca or contact:    

Paul Jones, CEO  Sean Stokes, Executive VP  Cathy Hume, Consultant  Instagram: 

@nuinscoresources 

[email protected]   [email protected]    [email protected] 

Twitter: 

@NWIResources