Sunday, September 20, 2026
MiningNewsTerminal
Sunday, September 20, 2026 Admin

NWI.CN ·

Nuinsco Announces Two Intersections of More Than 100m of Continuous Critical Metals & Phosphate Mineralization from Sampling Program at Prairie Lake

Drill Results Exploration Programs

Nuinsco Announces Two Intersections of More Than 100m of Continuous Critical 

Metals & Phosphate Mineralization from Sampling Program at Prairie Lake  

Toronto, August 11, 2021 – Nuinsco Resources Limited (“Nuinsco” or the “Company”) (CSE: NWI), announces two 

additional significant intersections of 122m and 111m respectively, of Critical Metals and phosphate mineralization 

from diamond drilling at its 100%‐owned Prairie Lake project near Terrace Bay, Ontario. 

Additional  sampling  of  diamond  drill  core  from  holes  NP0801  and   NP0802  has  now  produced  continuous 

mineralized  intersections  of  122.7m  (NP0801:  2.3‐125m)  and  111. 2m  (NP0802:  4.8‐116m)  of  niobium  (Nb), 

tantalum (Ta), phosphate (P 2O5), and rare earth elements (REE) including lanthanum (La), ceri um (Ce), samarium 

(Sm), neodymium (Nd) and yttrium (Y). Ten drill holes have been  sampled to date. The ongoing sampling program 

continues to provide information to support the Company’s goal of establishing a mineral resource at Prairie Lake; 

it is focussing on drill holes collared to intercept the Southwest (SW) Area (see map below) – this domain alone has 

an Exploration Target (“ET”) of 435‐530 million tonnes with grades as tabulated in the “Prairie Lake ET” table below. 

“The Company is impressed with the results obtained from the infill sampling program.  The expanded domains of 

continuous  rare  earth,  niobium,  tantalum  and  phosphate  mineraliz a t i o n  p r o v i d e  g r e at  s c op e  f o r  c o n t i n u i t y  a n d  

grade evaluation necessary to develop a resource,” said Paul Jo nes, Nuinsco’s CEO. “The value of the Prairie Lake 

project as an asset to the Company is emphasized by the REE neo dymium alone; it is just one of several contained 

elements of interest and has increased in price from circa US$60/kg to circa $140/kg between 1 August 2020 and 1 

August  2021  (source:  kitco.com).    The  mineralization  at  Prairie Lak e  occ u r s at su r f ac e and  extends  to  unknown 

depth below the deepest drilling conducted to date (circa 500m)  – it represents a very significant domain of rock 

mineralized with a number of elements and compounds of economic  interest including those defined as Critical 

E l e m e n t s  d e f i n e d  u n d e r  t h e  C a n a d i a n  M i n e r a l s  a n d  M e t a l s  P l a n  ( “CMMP” )  f o r  w h i c h  d e m a n d  i s  p r o j e c t e d  t o  

substantially increase and for which secure supply chains are sought.” 

2

Hole ID  From 

(m) 

To 

(m) 

Width 

(m) 

Rock 

Type 

P2O5

(%) 

Nb2O5

(%) 

Ta2O5 

(%) 

(g/t) 

La  

(g/t) 

Ce  

(g/t) 

Nd 

(g/t) 

Sm 

(g/t) 

∑REE

(g/t) 

New intersections: 

NP0801  2.3  27  24.7 

CRBT/IJ‐

PYX BX  2.83  0.220  0.0040  65  262  633  310  52  1322 

89  125  36 

CRBT/IJ‐

PYX BX  2.83  0.168  0.0032  59  233  516  243  42  1093 

NP0802 

4.8  29.19  24.39  CRBT  3.09  0.240  0.0044  74  304  726  343  58  1504 

32.13  41  8.87  CRBT  2.89  0.274  0.0021  68  234  575  290  51  1218 

78.6  87.38  8.78  MEL‐IJ  6.47  0.054  0.0026  137  367  803  401  74  178 2 

91.6  96.12  4.52  MEL‐IJ  9.16  0.027  0.0017  140  562  1174  566  95  25 37 

100.5  109.33  8.83  MEL‐IJ  2.34  0.145  0.0046  90  286  657  322  59  14 13 

Combined extended intersection: 

NP0801  2.3  125  122.7     2.19  0.196  0.0027  54  251  603  258  45  1211  

NP0802  4.8  116  111.2     4.62  0.159  0.0029  103  349  797  361  68  167 9 

*Principal rock type: CRBT=carbonatite; IJ‐PYX BX = breccia with crbt matrix & ijolite or pyroxenite clasts; MEL‐IJ = melano‐ijolite. 

∑REE = Sum of Y, La, Ce, Nd, Sm; Y ‐ yttrium, La ‐ lanthanum, Ce ‐ cerium, Nd ‐ neodymium, Sm – samarium. 

P2O5 ‐ phosphate, Nb2O5 – niobium oxide, Ta2O5 – tantalum oxide, 1g/t = 1 ppm 

When combined with previous sampling, the new results extend th e continuous intersect ion in hole NP0801 to 

112.7m of 0.196% Nb 2O5 and 2.19% P 2O5 with 0.0027 % (27 g/t) Ta 2O5 and 1211 g/t  ∑REE and in hole NP0802 to 

111.2m of 0.159% Nb2O5 and 4.62% P2O5 with 0.0029 % (29 g/t) Ta2O5 and 1679 g/t ∑REE. 

In total of 86 drill core samples were collected from NP0801 and NP0802; two of ten holes from the southeast half 

of the SW Area target from which samples have been submitted for analyses so far this year (see map). Additional 

sampling, primarily from the northwest half of the SW Area target, will be completed later this summer. 

Previous diamond drilling on the Prairie Lake property (2007 to 2010) has returned assays up to: 

 1.008 % Nb2O5 over 1.0m (NP0711; 97.5‐98.5m; carbonatite) 

 23.08 % P2O5 over 0.44m (NP1005; 336.27‐336.71m; carbonatite) 

 474 g/t Ta over 1.0m (NP0711; 23.75‐24.75m; ijolite) 

 2380 g/t Nd, 1910 g/t La and 4160 g/t Ce over 1.06m (NP1007; 428.0‐429.06m; carbonatite) 

 590 g/t Sm and 887 g/t Y over 1.38m (NP1006; 165.92‐167.3m; carbonatite) 

The Prairie Lake project consists of 46 mineral claims covering an area of ~630 ha. Logistically Prairie Lake is superbly 

located, with ready access to power, road, rail, and shipping i nfrastructure; it is easily accessed by an all‐weather 

road from the TransCanada Highway 28 kilometres to the south. The mineralization identified is entirely contained 

within the Prairie Lake carbonatite complex; the ET of 515‐630  million tonnes is defined by 59 diamond drill holes 

with grades as tabulated below. 

All samples were analysed by Activation Laboratories (ActLabs)  in Ancaster, Ontario. Samples were analysed for a 

whole rock and trace element ICP analytical package as well as  for niobium, tantalum, and zirconium oxides using 

a fusion XRF method. An internal Quality Control Quality Assura nce (QAQC) program was implemented with four 

QAQC samples (blanks and reference standards) added into the sampling stream. 

3

Prairie Lake Drilling & Trenching by Target Area1: 

1 Trench lengths are calculated as cumulative length of samples along trench. 

Prairie Lake ET2: 

2 The potential quantity and grade of the ET is conceptual in nature and there has been insufficient exploration to define a mineral resource. 

It is uncertain if further exploration will result in the discovery of a mineral resource. There is no National Instrument 43‐101 – Standards of 

Disclosure for Mineral Projects preliminary economic assessment in respect of the Prairie Lake ET. 

Laura Giroux, P.Geo, Chief Geologist, acts as Nuinsco's Qualifi ed  Person under National Instrument 43‐101. Ms. 

Giroux has reviewed and approved the technical contents of this news release.  

About Nuinsco Resources Limited 

Nuinsco Resources has over 50 years of exploration success and  is a growth‐oriented, multi‐commodity mineral 

exploration  and  development  company  focused  on  prospective  oppo rtunities  in  Canada  and  internationally. 

Currently the Company has four properties in Ontario – the high ‐grade Sunbeam gold property near Atikokan, the 

Dash Lake gold property near Terrace Bay, the large multi‐commodity (rare‐earths, niobium, tantalum, phosphate) 

Prairie Lake project near Terrace Bay, and the Zig Zag Lake property (lithium, tantalum) near Armstrong. In addition, 

Nuinsco has an agreement for gold exploitation at the El Sid project in the Eastern Desert of Egypt. 

 Forward‐Looking Statements 

This  news  release  contains  certain  "forward‐looking  statements."  All  statements,  other  than  statements  of  historic  fact,  that address  activities,  events  or 

developments that Nuinsco believes, expects or anticipates will  or may occur in the future are forward‐looking statements. For ward‐looking statements are 

often, but not always, identified by the use of words such as " seek," "anticipate," "believe," "plan," "estimate, “expect," an d "intend" and statements that an 

event or result "may," "will," "can," "should," "could," or "might" occur or be achieved and other similar expressions. These forward‐looking statements reflect 

the current expectations or beliefs of Nuinsco based on information currently available to Nuinsco. Forward‐looking statements are subject to a number of risks 

and uncertainties that may cause the actual results of Nuinsco  to differ materially from those discussed in the forward‐lookin g statements, and even if such 

actual results are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on Nuinsco. Factors 

that could cause actual results or events to differ materially from current expectations include, among other things, failure to successfully complete financings, 

capital and other costs varying significantly from estimates, p roduction rates varying from estimates, changes in world copper  and/or gold markets, changes 

in equity markets, uncertainties relating to the availability a nd costs of financing needed in the future, equipment failure,  unexpected geological conditions, 

   S W   Jim's Showing  East  NE  Other 

Areas  Total 

Historic Drill Holes 

(1969‐1983) 

Drill Holes  16  11 1 0  17 45

Metres  1351.7 938.4 34.1 0  1528.5 3852.7

Drill Holes (2007‐

2010) 

Drill Holes  21  10 0 0  1  32

Metres  6632  1692.4 0 0  101 8425.4

Trenches (2010)  Trenching  1  0 2 2  0  5

Metres  377.7 0 433.0 754.55  0  1562.2

  SW  Jim's Showing  East  NE  Total 

REEs    

La (ppm) Lanthanum  275 ‐ 340 295 ‐ 360 305 ‐ 370 200 ‐ 250  280 ‐ 340

Ce (ppm) Cerium  650 ‐ 790 670 ‐ 820 670 ‐ 820 450 ‐ 550  650 ‐ 790

Sm (ppm) Samarium  55 ‐ 70 55 ‐ 70 55 ‐ 70 50 ‐ 60  55 ‐ 70

Nd (ppm) Neodymium  295 ‐ 360 290 ‐ 360 320 ‐ 390 235 ‐ 290  300 ‐ 360

Y (ppm) Yttrium  85 ‐ 100 90 ‐ 110 80 ‐ 100 135 ‐ 170  85 ‐ 100

La+Ce+Sm+Nd+Y (ppm)  1360 ‐ 1660 1400 ‐ 1720 1430 ‐ 1750 1070 ‐ 1320  1370 ‐ 1660

Additional Elements (as oxides)    

P2O5 (%) Phosphate  3.0 ‐ 4.0  3.5 ‐ 4.5  2.5 ‐ 3.0  2.5 ‐ 3.5  3.0 ‐ 4.0 

Nb2O5 (%) Niobium  0.095 ‐ 0.115  0.100 ‐ 0.120  0.040 ‐ 0.050  0.085 ‐ 0.105  0.090 ‐  0.110 

Ta2O5 (ppm) Tantalum  18 ‐ 25  25 ‐ 30  5 ‐ 7  10 ‐ 12  18 ‐ 21 

Volume ‐ m3 (million)  140 ‐ 175 12 ‐ 14 13 ‐ 16 2 ‐ 3  170 ‐ 210

Tonnes (million)  435 ‐ 530  35 ‐ 45  40 ‐ 50  7 ‐ 8  515 ‐ 630 

4

imprecision in resource estimates, success of future developmen t initiatives, competition, operating performance of facilities , environmental and safety risks, 

delays in obtaining or failure to obtain tenure to properties and/or necessary permits and approvals, and other development and operating risks. Any forward‐

looking statement speaks only as of the date on which it is mad e and, except as may be required by applicable securities laws,  Nuinsco disclaims any intent or 

obligation to update any forward‐looking statement, whether as  a result of new information, future events or results or otherw ise. Although Nuinsco believes 

that the assumptions inherent in the forward‐looking statements  are reasonable, forward‐looking statements are not guarantees  of future performance and 

accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein. 

To learn more, please visit www.nuinsco.ca or contact:    

Paul Jones, CEO  Sean Stokes, Executive VP  Cathy Hume, Consultant  Instagram: 

@nuinscoresources 

[email protected]   [email protected]    [email protected] 

Twitter: 

@NWIResources