Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NWI.CN ·

Nuinsco Announces Seventh Intersection of More than 100m of Continuous Critical Elements & Phosphate Mineralization at Prairie Lake

Drill Results

Nuinsco Announces Seventh Intersection of More than 100m of Continuous Critical 

Elements & Phosphate Mineralization  at Prairie Lake 

Toronto,  September  1,  2021  –  Nuinsco  Resources  Limited  (“Nuinsco”  or  the  “Company”)  (CSE:  NWI)  today 

announced an intersection of 118. 6m of Critical Elements and ph osphate mineralization obtained from on‐going 

drill‐core sampling at its 100%‐owned Prairie Lake project near Terrace Bay, Ontario. 

“We  continue  to  see  extensive  intersections  of  elements  of  significant  economic  interest  from  the  Prairie  Lake 

carbonatite complex. This most r ecent result brings to seven th e number of drill‐holes identified by this sampling 

program  with  intercepts  of  100m  or  more  of  Critical  Elements  – of  note  this  most  recent  intersection  contains 

118.6m grading more than 2000g/t combined REEs (see below for tabulated individual REE values)” said Paul Jones, 

Nuinsco’s CEO.  “The intersections received to date have been o btained from near surface mineralization that the 

Company is expecting to use for a resource estimate, there is n o indication that mineralization diminishes with 

depth  and  the  seven  intersections  reported  to  date  occur  over  a n  interval  of  530m  in  the  Southwest  Area 

Exploration Target (see map and table below), highlighting the  potential scope and value of the mineralization on 

the project.     

As previously reported the mineralization in the Prairie Lake i ntrusion occurs at surface and extends to unknown 

depth below the deepest drilling  conducted to date (circa 500m  vertically). The Prairie Lake complex hosts a suite 

of elements of economic interest identified as Critical Element s defined under the Canadian Minerals and Metals 

Plan (“CMMP”) contained within a very large domain of mineralized rock that is extremely favourably located from 

a  logistical  perspective  with  rail,  road,  shipping,  and  power  in f r ast r u ct u r e  al r ead y  i n  p l ace .  T h e  p r oj ec t h ost s a  

number  of  elements  and  compounds  of  economic  interest  including t h o s e  f o r  w h i c h  d e m a n d  i s  p r o j e c t e d  t o  

substantially increase and for which secure supply chains are sought. 

Sampling of diamond drill core from holes NP0806 produced continuous mineralized intersections of 118.6m (from 

6.4‐125m) of niobium (Nb), tantalum (Ta), phosphate (P 2O5), and rare earth elements (REE) including lanthanum 

(La),  cerium  (Ce),  samarium  (Sm),  neodymium  (Nd)  and  yttrium  (Y)  –  analytical  results  are  tabulated  below.  

Eighteen drill‐holes have been sampled to date, focussing on dr ill‐holes collared to intercept the Southwest (SW) 

Area (see map below) – this domain measures 1km in length and is between 150m and 750m wide at surface. The 

SW Area alone hosts an Exploration Target (“ET”) of 435‐530 million tonnes with grades as tabulated in the “Prairie 

Lake  ET”  table  below.    The  sampling  will  provide  information  to  support  the  Company’s  goal  of  establishing  a 

mineral resource at Prairie Lake. 

Hole ID  From 

(m) 

To 

(m) 

Width 

(m) 

Rock 

Type* 

P2O5

(%) 

Nb2O5

(%) 

Ta2O5

(%) 

Y 

(g/t) 

La  

(g/t) 

Ce  

(g/t) 

Nd  

(g/t) 

Sm 

(g/t) 

∑REE

(g/t) 

NP0806  6.4  36  29.6  CRBT/PYX  3.34  0.100  0.0045  85  325  802  422  73  1707 

80  96  16  CRBT  4.14  0.034  0.0014  91  352  796  404  70  1713 

Combined extended intersection: 

NP0806  6.4  125  118.6     4.83  0.040  0.0020  117  384  970  476  93  204 0 

Principal rock type: CRBT=carbonatite; IJ‐PYX BX = breccia with crbt matrix & ijolite or pyroxenite clasts; MEL‐IJ = melano‐ijolite. 

∑REE = Sum of Y, La, Ce, Nd, Sm; Y ‐ yttrium, La ‐ lanthanum, Ce ‐ cerium, Nd ‐ neodymium, Sm – samarium. 

2

P2O5 ‐ phosphate, Nb2O5 – niobium oxide, Ta2O5 – tantalum oxide, 1g/t = 1 ppm 

The Prairie Lake project consists of 46 mineral claims covering an area of ~630 ha. Logistically Prairie Lake is superbly 

located, with ready access to power, road, rail and shipping in frastructure; it is easily accessed by an all‐weather 

road from the TransCanada Highway 28 kilometres to the south. The mineralization identified is entirely contained 

within the Prairie Lake carbonatite complex; the ET of 515‐630  million tonnes is defined by 59 diamond drill holes 

with grades as tabulated below. 

All samples were analysed by Activation Laboratories (ActLabs)  in Ancaster, Ontario. Samples were analysed for a 

whole rock and trace element ICP analytical package as well as  for niobium, tantalum, and zirconium oxides using 

a fusion XRF method. An internal Quality Control Quality Assura nce (QAQC) program was implemented with four 

QAQC samples (blanks and reference standards) added into the sampling stream. 

Prairie Lake Drilling & Trenching by Target Area1: 

1 Trench lengths are calculated as cumulative length of samples along trench. 

   S W   Jim's Showing  East  NE  Other 

Areas  Total 

Historic Drill Holes 

(1969‐1983) 

Drill Holes  16  11 1 0  17 45

Metres  1351.7 938.4 34.1 0  1528.5 3852.7

Drill Holes (2007‐

2010) 

Drill Holes  21  10 0 0  1  32

Metres  6632  1692.4 0 0  101 8425.4

Trenches (2010)  Trenching  1  0 2 2  0  5

Metres  377.7 0 433.0 754.55  0  1562.2

3

Prairie Lake ET2: 

2 A full description of methodology used to estimate the Prairie Lake Project Exploration Target is contained in the Technical Report dated 30 

November 2018 prepared by P&E Mining Consultants Inc.that is filed on SEDAR.  The potential quantity and grade of the ET is conceptual in 

nature and there has been insufficient exploration to define a mineral resource. It is uncertain if further exploration will result in the discovery 

o f  a  m i n e r a l  r e s o u r c e .  T h e r e  i s  n o  N a t i o n a l  I n s t r u m e n t  4 3 ‐ 1 0 1  –  Standards  of  Disclosure  for  Mineral  Projects  preliminary  economic 

assessment in respect of the Prairie Lake ET. 

Laura Giroux, P.Geo, Chief Geologist, acts as Nuinsco's Qualifi ed  Person under National Instrument 43‐101. Ms. 

Giroux has reviewed and approved the technical contents of this news release.  

About Nuinsco Resources Limited 

Nuinsco Resources has over 50 years of exploration success and  is a growth‐oriented, multi‐commodity mineral 

exploration  and  development  company  focused  on  prospective  oppo rtunities  in  Canada  and  internationally. 

Currently the Company has four properties in Ontario – the high ‐grade Sunbeam gold property near Atikokan, the 

Dash Lake gold property near Terrace Bay, the large multi‐commodity (rare‐earths, niobium, tantalum, phosphate) 

Prairie Lake project near Terrace Bay, and the Zig Zag Lake property (lithium, tantalum) near Armstrong. In addition, 

Nuinsco has an agreement for gold exploitation at the El Sid project in the Eastern Desert of Egypt. 

 Forward‐Looking Statements 

This  news  release  contains  certain  "forward‐looking  statements."  All  statements,  other  than  statements  of  historic  fact,  that address  activities,  events  or 

developments that Nuinsco believes, expects or anticipates will  or may occur in the future are forward‐looking statements. For ward‐looking statements are 

often, but not always, identified by the use of words such as " seek," "anticipate," "believe," "plan," "estimate, “expect," an d "intend" and statements that an 

event or result "may," "will," "can," "should," "could," or "might" occur or be achieved and other similar expressions. These forward‐looking statements reflect 

the current expectations or beliefs of Nuinsco based on information currently available to Nuinsco. Forward‐looking statements are subject to a number of risks 

and uncertainties that may cause the actual results of Nuinsco  to differ materially from those discussed in the forward‐lookin g statements, and even if such 

actual results are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on Nuinsco. Factors 

that could cause actual results or events to differ materially from current expectations include, among other things, failure to successfully complete financings, 

capital and other costs varying significantly from estimates, p roduction rates varying from estimates, changes in world copper  and/or gold markets, changes 

in equity markets, uncertainties relating to the availability a nd costs of financing needed in the future, equipment failure,  unexpected geological conditions, 

imprecision in resource estimates, success of future developmen t initiatives, competition, operating performance of facilities , environmental and safety risks, 

delays in obtaining or failure to obtain tenure to properties and/or necessary permits and approvals, and other development and operating risks. Any forward‐

looking statement speaks only as of the date on which it is mad e and, except as may be required by applicable securities laws,  Nuinsco disclaims any intent or 

obligation to update any forward‐looking statement, whether as  a result of new information, future events or results or otherw ise. Although Nuinsco believes 

that the assumptions inherent in the forward‐looking statements  are reasonable, forward‐looking statements are not guarantees  of future performance and 

accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein. 

  SW  Jim's Showing  East  NE  Total 

REEs    

La (ppm) Lanthanum  275 ‐ 340 295 ‐ 360 305 ‐ 370 200 ‐ 250  280 ‐ 340

Ce (ppm) Cerium  650 ‐ 790 670 ‐ 820 670 ‐ 820 450 ‐ 550  650 ‐ 790

Sm (ppm) Samarium  55 ‐ 70 55 ‐ 70 55 ‐ 70 50 ‐ 60  55 ‐ 70

Nd (ppm) Neodymium  295 ‐ 360 290 ‐ 360 320 ‐ 390 235 ‐ 290  300 ‐ 360

Y (ppm) Yttrium  85 ‐ 100 90 ‐ 110 80 ‐ 100 135 ‐ 170  85 ‐ 100

La+Ce+Sm+Nd+Y (ppm)  1360 ‐ 1660 1400 ‐ 1720 1430 ‐ 1750 1070 ‐ 1320  1370 ‐ 1660

Additional Elements (as oxides)    

P2O5 (%) Phosphate  3.0 ‐ 4.0  3.5 ‐ 4.5  2.5 ‐ 3.0  2.5 ‐ 3.5  3.0 ‐ 4.0 

Nb2O5 (%) Niobium  0.095 ‐ 0.115  0.100 ‐ 0.120  0.040 ‐ 0.050  0.085 ‐ 0.105  0.090 ‐  0.110 

Ta2O5 (ppm) Tantalum  18 ‐ 25  25 ‐ 30  5 ‐ 7  10 ‐ 12  18 ‐ 21 

Volume ‐ m3 (million)  140 ‐ 175 12 ‐ 14 13 ‐ 16 2 ‐ 3  170 ‐ 210

Tonnes (million)  435 ‐ 530  35 ‐ 45  40 ‐ 50  7 ‐ 8  515 ‐ 630 

To learn more, please visit www.nuinsco.ca or contact:    

Paul Jones, CEO  Sean Stokes, Executive VP  Cathy Hume, Consultant  Instagram: 

@nuinscoresources 

4

[email protected]   [email protected]    [email protected] 

Twitter: 

@NWIResources