Nuinsco Announces Eighth Intersection of More than 100m of Continuous Critical Elements & Phosphate Mineralization at Prairie Lake
Nuinsco Announces Eighth Intersection of More than 100m of Continuous Critical
Elements & Phosphate Mineralization at Prairie Lake
Toronto, September 9, 2021 – Nuinsco Resources Limited (“Nuinsco” or the “Company”) (CSE: NWI) today
announced an eighth successive intersection of 100m or more of Critical Elements and phosphate mineralization
at its 100%‐owned Prairie Lake project near Terrace Bay, Ontari o with the receipt of an alyses producing a 122.7m
intersection in DDH NP0807.
“The ongoing drill core sampling program (the “Program”) at Prairie Lake continues to produce exceptional
mineralized widths that are defining a very extensive domain of much sought‐after rare earth elements, niobium,
tantalum and phosphate,” said Paul Jones, Nuinsco’s CEO. “Our intent is to use the results from the Program to
upgrade the existing Exploration Target (“ET”) to a resource in the near term.”
The mineralization of economic interest contained within the Pr airie Lake intrusion occurs at surface and extends
to unknown depths below the deepest drilling conducted to date (circa 500m vertically). There is no indication that
mineralization diminishes with depth and the eight intersections from the Program reported to date occur over an
interval of 530m, oriented southea st‐northwest, in the Southwes t (“SW”) Area (see map below). The Prairie Lake
complex hosts a suite of elements of economic interest identified as Critical Elements defined under the Canadian
Minerals and Metals Plan (“CMMP”) contained within the very large domain of mineralized rock t hat is extremely
favourably located from a logist ical perspective with rail, roa d, shipping, and power infrastructure already
established. Prairie Lake hosts a number of elements and compounds of economic interest including those for
which demand is projected to substantially increase and for which secure supply chains are sought.
Analytical results from the 122.7 metres of continuous minerali zation (from 2.3‐125m) of niobium (Nb), tantalum
(Ta), phosphate (P2O5), and rare earth elements (REE) including lanthanum (La), ceriu m ( C e ) , s a m a r i u m ( S m ) ,
neodymium (Nd) and yttrium (Y) – analytical results are tabulated below. Eighteen drill‐holes have been sampled
to date as part of the Program, focussing on drill‐holes collar ed to intercept the SW area which measures 1km in
length and is between 150m and 750m wide at surface. The SW are a alone hosts 435‐530 million tonnes of the
total 515‐630 million tonne ET, with grades as tabulated in the “Prairie Lake ET” table below.
Hole ID From
(m)
To
(m)
Width
(m)
Rock
Type*
P2O5
(%)
Nb2O5
(%)
Ta2O5
(%)
Y
(g/t)
La
(g/t)
Ce
(g/t)
Nd
(g/t)
Sm
(g/t)
∑REE
(g/t)
New intersections:
NP0807
2.3 9.88 7.58 SILCARB 4.60 0.028 0.004 111 407 1057 614 111 230 0
15.1 21.73 6.63 PYX 1.80 0.179 0.003 47 159 374 181 33 794
38.5 87.64 49.14 CRBT/PYX 2.64 0.154 0.002 70 194 470 242 45 10 22
98 110 12 PYX/CRBT 2.17 0.120 0.003 75 208 487 254 49 1073
Combined extended intersection:
NP0807 2.3 125 122.7 3.20 0.145 0.0018 81 233 576 281 54 1225
Principal rock type: CRBT=carbonatite; IJ‐PYX BX = breccia with crbt matrix & ijolite or pyroxenite clasts; MEL‐IJ = melano‐ijolite.
∑REE = Sum of Y, La, Ce, Nd, Sm; Y ‐ yttrium, La ‐ lanthanum, Ce ‐ cerium, Nd ‐ neodymium, Sm – samarium.
P2O5 ‐ phosphate, Nb2O5 – niobium oxide, Ta2O5 – tantalum oxide, 1g/t = 1 ppm
2
The Prairie Lake project consists of 46 mineral claims covering an area of ~630 ha. Prairie Lake is superbly located,
easily accessed by an all‐weather road from the TransCanada Hig hway located 28 kilometres to the south. The ET
is defined by 59 diamond drill holes.
All samples were analysed by Activation Laboratories (ActLabs) in Ancaster, Ontario. Samples were analysed for a
whole rock and trace element ICP analytical package as well as for niobium, tantalum, and zirconium oxides using
a fusion XRF method. An internal Quality Control Quality Assura nce (QAQC) program was implemented with four
QAQC samples (blanks and reference standards) added into the sampling stream.
Prairie Lake Drilling & Trenching by Target Area1:
1 Trench lengths are calculated as cumulative length of samples along trench.
S W Jim's Showing East NE Other
Areas Total
Historic Drill Holes
(1969‐1983)
Drill Holes 16 11 1 0 17 45
Metres 1351.7 938.4 34.1 0 1528.5 3852.7
Drill Holes (2007‐
2010)
Drill Holes 21 10 0 0 1 32
Metres 6632 1692.4 0 0 101 8425.4
Trenches (2010) Trenching 1 0 2 2 0 5
Metres 377.7 0 433.0 754.55 0 1562.2
3
Prairie Lake ET2:
2 A full description of methodology used to estimate the Prairie Lake Project Exploration Target is contained in the Technical Report dated 30
November 2018 prepared by P&E Mining Consultants Inc. that is filed on SEDAR. The potential quantity and grade of the ET is conceptual in
nature and there has been insufficient exploration to define a mineral resource. It is uncertain if further exploration will result in the discovery
o f a m i n e r a l r e s o u r c e . T h e r e i s n o N a t i o n a l I n s t r u m e n t 4 3 ‐ 1 0 1 – Standards of Disclosure for Mineral Projects preliminary economic
assessment in respect of the Prairie Lake ET.
Laura Giroux, P.Geo, Chief Geologist, acts as Nuinsco's Qualifi ed Person under National Instrument 43‐101. Ms.
Giroux has reviewed and approved the technical contents of this news release.
About Nuinsco Resources Limited
Nuinsco Resources has over 50 years of exploration success and is a growth‐oriented, multi‐commodity mineral
exploration and development company focused on prospective oppo rtunities in Canada and internationally.
Currently the Company has four properties in Ontario – the high ‐grade Sunbeam gold property near Atikokan, the
Dash Lake gold property near Terrace Bay, the large multi‐commodity (rare‐earths, niobium, tantalum, phosphate)
Prairie Lake project near Terrace Bay, and the Zig Zag Lake property (lithium, tantalum) near Armstrong. In addition,
Nuinsco has an agreement for gold exploitation at the El Sid project in the Eastern Desert of Egypt.
Forward‐Looking Statements
This news release contains certain "forward‐looking statements." All statements, other than statements of historic fact, that address activities, events or
developments that Nuinsco believes, expects or anticipates will or may occur in the future are forward‐looking statements. For ward‐looking statements are
often, but not always, identified by the use of words such as " seek," "anticipate," "believe," "plan," "estimate, “expect," an d "intend" and statements that an
event or result "may," "will," "can," "should," "could," or "might" occur or be achieved and other similar expressions. These forward‐looking statements reflect
the current expectations or beliefs of Nuinsco based on information currently available to Nuinsco. Forward‐looking statements are subject to a number of risks
and uncertainties that may cause the actual results of Nuinsco to differ materially from those discussed in the forward‐lookin g statements, and even if such
actual results are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on Nuinsco. Factors
that could cause actual results or events to differ materially from current expectations include, among other things, failure to successfully complete financings,
capital and other costs varying significantly from estimates, p roduction rates varying from estimates, changes in world copper and/or gold markets, changes
in equity markets, uncertainties relating to the availability a nd costs of financing needed in the future, equipment failure, unexpected geological conditions,
imprecision in resource estimates, success of future developmen t initiatives, competition, operating performance of facilities , environmental and safety risks,
delays in obtaining or failure to obtain tenure to properties and/or necessary permits and approvals, and other development and operating risks. Any forward‐
looking statement speaks only as of the date on which it is mad e and, except as may be required by applicable securities laws, Nuinsco disclaims any intent or
obligation to update any forward‐looking statement, whether as a result of new information, future events or results or otherw ise. Although Nuinsco believes
that the assumptions inherent in the forward‐looking statements are reasonable, forward‐looking statements are not guarantees of future performance and
accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.
SW Jim's Showing East NE Total
REEs
La (ppm) Lanthanum 275 ‐ 340 295 ‐ 360 305 ‐ 370 200 ‐ 250 280 ‐ 340
Ce (ppm) Cerium 650 ‐ 790 670 ‐ 820 670 ‐ 820 450 ‐ 550 650 ‐ 790
Sm (ppm) Samarium 55 ‐ 70 55 ‐ 70 55 ‐ 70 50 ‐ 60 55 ‐ 70
Nd (ppm) Neodymium 295 ‐ 360 290 ‐ 360 320 ‐ 390 235 ‐ 290 300 ‐ 360
Y (ppm) Yttrium 85 ‐ 100 90 ‐ 110 80 ‐ 100 135 ‐ 170 85 ‐ 100
La+Ce+Sm+Nd+Y (ppm) 1360 ‐ 1660 1400 ‐ 1720 1430 ‐ 1750 1070 ‐ 1320 1370 ‐ 1660
Additional Elements (as oxides)
P2O5 (%) Phosphate 3.0 ‐ 4.0 3.5 ‐ 4.5 2.5 ‐ 3.0 2.5 ‐ 3.5 3.0 ‐ 4.0
Nb2O5 (%) Niobium 0.095 ‐ 0.115 0.100 ‐ 0.120 0.040 ‐ 0.050 0.085 ‐ 0.105 0.090 ‐ 0.110
Ta2O5 (ppm) Tantalum 18 ‐ 25 25 ‐ 30 5 ‐ 7 10 ‐ 12 18 ‐ 21
Volume ‐ m3 (million) 140 ‐ 175 12 ‐ 14 13 ‐ 16 2 ‐ 3 170 ‐ 210
Tonnes (million) 435 ‐ 530 35 ‐ 45 40 ‐ 50 7 ‐ 8 515 ‐ 630
To learn more, please visit www.nuinsco.ca or contact:
Paul Jones, CEO Sean Stokes, Executive VP Cathy Hume, Consultant Instagram:
@nuinscoresources
[email protected] [email protected] [email protected]
Twitter: @NWIResources