Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NVX.V ·

NV Gold Mobilizes to Slumber Gold Project in Nevada to Initiate CSAMT Geophysical Survey

Exploration Programs

580 Hornby Street, Suite 588

Vancouver, British Columbia, V6C 3B6

Tel: +1 888 363 9883

www.nvgoldcorp.com

NV Gold Mobilizes to Slumber Gold Project in Nevada

to Initiate CSAMT Geophysical Survey

August 10, 2020 - Vancouver, British Columbia – NV Gold Corporation (TSXV: NVX;

US: NVGLF) (“NV Gold” or the “ Company”) is pleased to announce that a controlled

source audio -magnetotelluric (“ CSAMT”) geophysical survey will commence at the

Slumber Gold Project in Nevada by August 13, 2020.

“NV Gold completed an initial drill program at the Slumber Gold Project in the fall of

2019, which identified what we believe to be a significant buried epithermal gold system,”

commented Peter A. Ball, President & CEO of NV Gold. “Based on proven success of

the use of the CSAMT technology at other epithermal projects , our technical team

consisting of Dr. Quinton Hennigh and Dr. Odin Christensen, believe the survey will help

us vector in on potential mineralized structures at depth . Given the similar geology of

Slumber to other epithermal s ystems in the area, we believe Slumber has the potential to

host high-grade structures at depth , and we look forward to drill testing any CSAMT-

generated targets this fall.”

NV Gold has engaged Zonge International, of Reno, Nevada to execute the CSAMT

geophysical program at the Slumber Gold Project . Based on results from the CSAMT

survey, a more defined drill program may be developed to test for the potential feeder

structures at depth commencing later in the fall of 2020.

About CSAMT

CSAMT is a low -impact, ground geophysical survey method that involves determining

electrical resistivity of rocks. CSAMT data is desirable as it provides critical information

about geologic structure, and in the case of epithermal systems such as Slumber, identifying

areas of silicification that develop around the structural ‘plumbing’ of the hot spring, places

where mineralized veins might be found . CSAMT is useful for mapping resistivity to

around the 1,000-meter depth range. The prospective boiling zone, where high -grade

mineralization can occur within an epithermal system, is commonly at depths ranging from

300-500 m below paleo-surface.

Quinton Hennigh (Ph.D., P.Geo.) is a Qualified Person pursuant to National Instrument

43-101 and has reviewed and approved the technical information contained in this news

release. Dr. Hennigh is a director of NV Gold and is not i ndependent and is also the

President, Chairman and a Director of Novo Resources Corp.

About NV Gold Corporation

NV Gold ( TSXV: NVX, US: NVGLF ) is a junior exploration company based in

Vancouver, British Columbia that is focused on delivering value through mineral

discoveries in North America, leveraging its highly experienced in -house technical

knowledge, and identifying and drilling 2 -3 priority projects per year. NV Gold controls

multiple drill-ready projects in Nevada, and has entered into an Opt ion Agreement on the

high-grade Exodus Gold Project in British Columbia, Canada.

On behalf of the Board of Directors,

Peter A. Ball

President & CEO

For further information, visit the Company’s website at www.nvgo ldcorp.com or

contact:

Peter A. Ball, President & CEO

Phone: 1 -888-363-9883

Email: [email protected]

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward Looking Statements

This news release includes certain forward -looking statements or information. All statements other than

statements of historical fact included in this release, including, without limitation, and other future plans and

objectives of the Company including further drilling at the Slumber Gold Project , are forward -looking

statements that involve various risks and uncertainties. There can be no assurance that such statements will

prove to be accurate and actual results and future events could differ materially from those anticipated in

such statements. Important factors that could cause actual results to differ ma terially from the Company's

plans or expectations include regulatory issues, market prices, availability of capital and financing, general

economic, market or business conditions, timeliness of government or regulatory approvals and other risks

detailed herein and from time to time in the filings made by the Company with securities regulators. The

Company disclaims any intention or obligation to update or revise any forward-looking statements whether

as a result of new information, future events or otherwis e except as otherwise required by applicable

securities legislation.