Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NVX.V ·

NV Gold Corporation Announces Updates on Five Active Projects in

Corporate Updates

NV Gold Corporation Announces

Updates on Five Active Projects in

Nevada, USA

Thursday, October 7, 2021 8:15 AM

Topic:

Company Update

VANCOUVER, BC / ACCESSWIRE / October 7, 2021 / NV Gold

Corporation (TSXV:NVX)(OTCQB:NVGLF) ("NV Gold" or the "Company") is pleased

to announce that the Company has completed 3 Notices of Intent (NOI) to commence

drilling at its 100% owned Slumber, Discovery Bay and Pickhandle projects in north-

central Nevada, USA. The Company also reports that a 2D seismic survey has been

completed at its optioned SW Pipe Project located along the Cortez Gold Belt

approximately 6 km southwest of the Pipeline Gold Complex operated by Nevada Gold

Mines.

Upcoming Plans:

• The upcoming Slumber drill program is designed to determine the extent of

additional near-surface oxide-mineralization at its north-central Nevada (see

Figure 1) project. The 6-8 drill program is expected to commence later this

month.

• The Discovery Bay Project is located approximately 15 km southeast of the Cove-

McCoy gold deposits in Lander County, Nevada (see Figure 1) controlled by I-80

Gold Corp. This North-South structural zone, also known as the "Rabbit Suture",

hosts other significant gold deposits such as Turquoise Ridge, Twin Creeks as

well as the Fortitude, Phoenix and Lone Tree Mines. Drilling of a four-hole recon

program is expected to commence in November.

• The Pickhandle Project is located at the structural intersection of the Rabbit

Suture (Hwy 305) and the Crescent Valley Fault Zone (see Figure 1). Pickhandle

is located 25 kilometers south of the Discovery Bay Project. The 3-4-hole drilling

program is anticipated to begin in December.

• The recently announced IP/Resistivity program at the Sandy Project has added a

highly compelling target that will likely be drilled in Q1 2022. See news release

on 9/28/2021.

• At the SW Pipe, a 2D Seismic survey was recently completed by the optionee to

determine depth to Carlin-type host lithologies and structural drill targets (see

Figure 2). Drilling at SW Pipe is scheduled for mid-2022 depending on core rig

availability.

Our projects are pushing forward, and I am more than pleased to have our drill contract

in place, equipment committed and permits in-hand. NV Gold has high-quality projects

with excellent discovery potential that can now be drill-tested. Besides Slumber,

Discovery Bay and Pickhandle, there are several more projects entering the project

pipeline. These projects are moving toward permitting, fulfilling our goal of drill-testing

multiple, high-potential projects within the next 18 months to deliver value to our

shareholders," commented Thomas Klein, VP Exploration of NV Gold.

Figure 1: NV Gold's projects with NOIs in place and location of SW Pipe with

2D Seismic completed.

Figure 2: 2D Seismic equipment at SW Pipe with Cortez mines in the

background.

On behalf of the Board of Directors,

John E. Watson

President & CEO

For further information, visit the Company's website at www.nvgoldcorp.com or

contact: Freeform Communications Inc. at 604.245.0054

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is

defined in the policies of the TSX Venture Exchange) accepts responsibility for the

adequacy or accuracy of this release.

Forward Looking Statements

This news release includes certain forward-looking statements or information. All

statements other than statements of historical fact included in this release, including,

without limitation, statements regarding the extent and timing of the Company's

planned exploration activities, are forward-looking statements that involve various risks

and uncertainties. There can be no assurance that such statements will prove to be

accurate and actual results and future events could differ materially from those

anticipated in such statements. Important factors that could cause actual results to

differ materially from the Company's plans or expectations include regulatory issues,

market prices, availability of capital and financing, general economic, market or

business conditions, timeliness of government or regulatory approvals, The Company

disclaims any intention or obligation to update or revise any forward-looking statements

whether because of new information, future events or otherwise, except as otherwise

required by applicable securities legislation.

SOURCE: NV Gold Corporation