Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NVX.V ·

Nv GOLD Announces Phase I Drll Program at Its Sandy GOLD Project IN Nevada

Exploration Programs

580 Hornby Street, Suite 588

Vancouver, British Columbia, V6C 3B6

Tel: +1 888 363 9883

www.nvgoldcorp.com

NV GOLD ANNOUNCES PHASE I DRLL PROGRAM AT ITS

SANDY GOLD PROJECT IN NEVADA

September 29, 2020 - Vancouver, British Columbia – NV Gold Corporation (TSX.V:

NVX; US : NVGLF) (“NV Gold ” or the “ Company”) is pleased to announce it has

received necessary drill approvals for its 100% owned Sandy Gold Project (“Sandy”)

located within the Walker Lane , Lyon County, Nevada, USA . NV Gold ’s first drill

program at Sandy encompasses up to 1,500 m in up to 10 drill holes.

A property-wide geophysical program was recently completed consisting of 198 line-kms

of electromagnetic (resistivity and conductivity), magnetic, and radiometric surveys. Raw

data is currently being analyzed by senior geophysicists from Goldspot Discoveries Corp.

and will assist in delineating high priority drill targets testing this low-sulphidation

epithermal gold system.

"We look forward to completing our first drill program at the Sandy Gold Project , which

last saw drilling in the early 1990s. We are currently finalizing our drill program that

is expected to commence in October 2020 ," commented Peter A. Ball, President and

CEO of NV Gold. "At the same time we are preparing our drill at the Sandy Gold Project,

we have recently submitted our drill permit for our 100% owned Slumber Gold Project in

Humboldt County, Nevada, which was leased in 2019. We also continue to advance the

optioned Exodus Gold Project in BC, Canada , where we can earn up to an 85% interest .

This is shaping up to be a very exciting and busy second half of 2020 at NV Gold, with

potentially three drill programs to be undertaken."

About the Sandy Gold Project

• 20 unpatented lode claims encompassing approximately 400 acres acquired for

minimal staking costs in 2019 utilizing NV Gold’s internal geological database .

• Strategically within a highly prospective low sulfidation epithermal gold district

located in Lyon County, Nevada, USA.

• Staked prior to and now surrounded by the Hercules Gold Project claim block

controlled by Eclipse Gold Mining (TSXV: EGLD). Eclipse Gold Mining has

raised approximately $20 million to explore and advance its Hercules Project.

• Originally explored in 1993 -1994 through work including geologic mapping,

rock-chip and soil sampling, and drilling. Refer to the Company’s press release

September 5, 2019 for additional information on historical data.

About NV Gold Corporation

NV Gold ( TSXV: NVX, US: NVGLF) is a well-financed junior exploration company

based in Vancouver, British Columbia that is focused on delivering value through mineral

discoveries in North America, leveraging its highly experienced in -house technical

knowledge, and identifying and drilling 2 -3 priority projects per year. NV Gold controls

multiple drill-ready projects in Nevada, and has entered into an Option Agreement on the

high-grade Exodus Gold Project in British Columbia, Canada.

On behalf of the Board of Directors,

Peter A. Ball

President & CEO

For further information, visit the Company’s website at www.nvgoldcorp.com or

contact:

Peter A. Ball, President & CEO

Phone: 1 -888-363-9883

Email: [email protected]

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this release.

Forward Looking Statements

This news release includes certain forward -looking statements or information. All statements other than

statements of historical fact included in this release, including, without limitation, statements regarding the

Company’s planned exploration activities , including executing a drill program at the Sandy , Slumber and

Exodus Gold Projects in the Fall of 2020, are forward-looking statements that involve various risks and

uncertainties. There can be no assurance that such statements will prove to be accurate and actual results

and future events could differ materially from those anticipated in such statements. Important factors that

could cause actual results to differ materially from the Company's plans or expectations include regulatory

issues, market prices, availability of capital and financing, general economic, market or business conditions,

timeliness of government or regulatory approvals and other risks detailed herein and from time to time in

the filings made by the Company with securities regulators. The Company disclaims any intention or

obligation to update or revise any forward-looking statements whether as a result of new information, future

events or otherwise, except as otherwise required by applicable securities legislation.