Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NVX.V ·

NV Gold Announces Drill Results at Slumber, including 28.95 m of 0.433 p/t Gold in step out RC hole, over 1.5 Kilometers north of known gold hosting zones.

Drill Results

Suite 250 - 750 West Pender Street

Vancouver, BC V6C 2T7 Canada

Tel: 604-245-0054

www.nvgoldcorp.com

NV Gold Announces Drill Results at Slumber, including 28.95 m

of 0.433 p/t Gold in step out RC hole, over 1.5 Kilometers north of

known gold hosting zones.

August 21, 2025

VANCOUVER, BC / ACCESSWIRE / August 21. 2025 / NV Gold Corporation

(TSXV:NVX)(OTCQB:NVGLF)(FSE:8NV) (“NV Gold” or the “Company”) is pleased to provide

an update on new drill results from its 100%-owned Slumber Gold Project ("Slumber"),

located 80 kilometers (50 miles) west-northwest of Winnemucca and 37 kilometers (23 miles)

west of the Sleeper gold deposit in Humboldt County (see Figure 1). The June 2025 reverse

circulation drilling campaign completed 5 five drillholes, totaling 964.7 meters (3165 feet).

The drill holes were completed to test surface mercury vapor anomalies away from previously

known gold hosting zones.

The 2025 drilling campaign successfully tested mercury vapor anomalies and identified an

extension of the known oxide gold mineralization at least 1.5 kilometers north of the

previously reverse circulation defined gold zones, as reported in the News Release of March

21, 2023.

Results indicate that Slumber reverse circulation drill holes SL-30, SL-31 and SL-32 returned

significant gold values as highlighted below. Table 1 contains all gold intercepts.

• SL-30 from 192.02 m (630') to 195.06 m (645') at 1.092 gpt Au

• SL-31 from 150.9 m (495') to 158.5 m (520') at 0.489 gpt Au

• SL-31 from 163.1 m (535') to 166.1 m (545') at 0.619 gpt Au

• SL-31 from 181.36 m (590') to 190.5 m (625') at 0.490 gpt Au

• SL-32 from 160.0 m (520') to 161.5 m (530') at 0.673 gpt Au

John Watson, NV Gold’s CEO commented – “The Slumber Project continues to expand with

our work in 2025. Hole SL 30 was drilled 1.7 km north of our previous drilling and hole SL 31

was completed 0.33 km north. Both holes returned highly encouraging intercepts of gold

mineralization and both bottomed in grade. The 2025 Program results suggest that the oxide

gold system is much larger than previously established, with potential to be a major

discovery.”

Suite 250 - 750 West Pender Street

Vancouver, BC V6C 2T7 Canada

Tel: 604-245-0054

www.nvgoldcorp.com

Figure 1: Location of Slumber project and nearby active and inactive mining operations.

Slumber Project Highlights:

• The Slumber property comprises 85 lode mining claims, is strategically located near

active gold mining operations.

• The project is volcanic-hosted epithermal gold mineralization found in a structural

corridor along the southern Jackson Mountains.

• Three previous drill campaigns have been conducted by NVX since 2019. 29 RC

holes (reverse circulation) were completed, totaling 5,200.9 m (17,063.3 ft).

• Geophysical surveys, including the CSAMT survey conducted in 2019 and an induced

polarization (IP) survey in 2022, have identified a continuous north-south to north-

northeast-trending resistivity zone correlated with gold mineralization. The resistivity

anomaly indicates hydrothermally brecciated, highly silicified volcanics with broad

thicknesses returning gold values (see Figure 3).

• On November 1st, 2022, NV Gold announced the identification of five new mercury

vapor targets at the Slumber Gold Project at Humboldt County, Nevada. Three of

these anomalies were successfully tested by the current program.

• On March 21st, 2023, NV Gold announced the results of an “Exploration Target”

analysis. An ‘Exploration Target provides a potential range of tons and grades and is

Suite 250 - 750 West Pender Street

Vancouver, BC V6C 2T7 Canada

Tel: 604-245-0054

www.nvgoldcorp.com

conceptual in nature, the probability of confirmation is not known. News Release of

March 21, 2023.

• Preliminary widely spaced AuCN tests conducted in 2022 “potentially high” gold

recovery. See discussion in the News Release of May 2022.

Thomas Klein, NVX Consultant stated, “The Slumber Gold Project is one of the most exciting

projects I have had the pleasure of working on since my time in Nevada. The gold zone is

extensive and the 2025 stepouts, up to 1.75 km, exhibit the same mineralization style with

increasing gold grades suggesting higher-grade gold mineralization at depth, with potential

high-grade feeders yet to be discovered. Slumber is in the early stage of discovery, and I am

very optimistic that the Slumber gold system will grow significantly. I am confident that further

drilling could lead to the next major oxide gold discovery in Nevada."

Suite 250 - 750 West Pender Street

Vancouver, BC V6C 2T7 Canada

Tel: 604-245-0054

www.nvgoldcorp.com

2025 Drill hole

collars in green

diamonds.

Previous drill

hole collars in

yellow dots.

Mercury (Hg)

vapor surface

anomaly areas

indicated by

letter.

Figure 2 –

New 2025 drill results indicate potential gold extension 1.5+ kilometers further north of the

modeled Exploration Target zone and good correlation with mercury vapor anomalies

Drill Intercepts:

Suite 250 - 750 West Pender Street

Vancouver, BC V6C 2T7 Canada

Tel: 604-245-0054

www.nvgoldcorp.com

Table 1 - Slumber 2019-2025 significant drill intercepts. True widths are not known.

However, based on the current understanding of mineralized zones, true widths are between

70%-100% of the total length and grades are uncut.

Suite 250 - 750 West Pender Street

Vancouver, BC V6C 2T7 Canada

Tel: 604-245-0054

www.nvgoldcorp.com

Figure 3 – From the gold 192.02 m (630 ft) to 195.06 m (645 ft) intercept in hole SL-30 and is

hosted in Trx a lithic tuff.

Jesse Wellman, C.P.G, QP for the Slumber project stated, “Thanks to the NV Gold Corp.’s

2025 drilling program the Slumber Gold Project now has gold intercepts in drilling covering

nearly 2.5 km from north to south, and 0.5 km east to west with most directions remaining

Suite 250 - 750 West Pender Street

Vancouver, BC V6C 2T7 Canada

Tel: 604-245-0054

www.nvgoldcorp.com

open. The pyroclastic/volcaniclastic hosted epithermal system appears to be well altered,

mineralized, and oxidized. Bleaching/leaching and silicification are the most common

alteration types, with local argillic, and quartz rich zones. Iron oxides after pyrite, with

occasional relict textures, are widespread. Additional work is needed to fully understand the

structural and host rock controls. From what is known currently the geology appears

permissive to expand significantly the extent of contained oxide gold.”

Qualified Person Disclosure

The technical disclosure in this news release has been reviewed and approved by Jesse

D. Wellman, C.P.G, a Certified Professional Geologist of the American Institute of

Professional Geologists and is the Qualified Person as defined by National Instrument

43-101 of the Canadian Securities Administrators. Jesse is an Independent Consulting

Geologist and holds no interest in NV Gold Corp.

Analytical Laboratory and QA/QC Procedures

The company used an MPD -1500 reverse circulation drill of New Frontier Drilling, Fallon

Nevada. All 2025 Slumber drilling was ‘reverse circulation’ type, returning rock samples

that range in size from <1mm up to 2 cm, with the majority between 1 and 5 mm in

longest dimension. Samples were collected from the cyclone underflow as a separate

split from circulation returns onsite and submitted to the ALS Chemex laboratory in Elko

Nevada and in Twin Falls Idaho. Samples submitted ranged in weight from 0.6 kil ograms

to 21.23 kilograms with an average weight of 6.3 kilograms. Samples were taken at 1.52

m (5 ft) intervals in all holes. All samples were submitted for analyses, except for the first

33m (100 ft) of hole SL -30, and for hole SL -34 where samples were selected for analysis

approximately every 15.2 m (50 ft). Chip samples were collected in trays from all

intervals, photographed, and retained by the company.

The quality assurance -quality control (QA -QC) program of NV Gold Corp. includes the

insertion of certified standards of known gold content, blank and duplicate samples. After

crushing and pulverizing samples of 30 grams are tested by the FA ICP -AES finish , ALS

code Au -ICP21 method.

Additional Housekeeping

Suite 250 - 750 West Pender Street

Vancouver, BC V6C 2T7 Canada

Tel: 604-245-0054

www.nvgoldcorp.com

The Private Placement financing announced on May 22, 2025, has been cancelled after

closing a first tranche of $349,800.00 announced on July 3, 2025 and, the subsequent

issuance of 3,498,000 units. Each unit consisted of one common share and one two -year

Common Share purchase warrant exercisable at $0.20.

About NV Gold Corporation

NV Gold Corporation is a well-organized exploration company with 18.7 million shares issued

and outstanding. NV Gold has 21 exploration projects in Nevada comprising 639 100%-

Company-owned lode mining claims totaling 53.4 square kilometers (20.6 square miles). The

Company is based in Vancouver, British Columbia, and Reno, Nevada, and is focused on

delivering value through mineral discoveries in Nevada, USA.

Leveraging its expansive property portfolio, its highly experienced in-house technical team,

and its extensive geological data library, 2025 promises to be highly productive for NV Gold.

On behalf of the Board of Directors,

John Watson, President, Chairman, CEO and Director

For further information, visit the Company’s website at www.nvgoldcorp.com or contact:

Freeform Communications at 604.245.0054

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is

defined in the policies of the TSX Venture Exchange) accepts responsibility for the

adequacy or accuracy of this news release.

This news release contains statements which constitute “forward -looking information” within the meaning of

applicable securities laws, including statements regarding the plans, intentions, beliefs and current expectations

of the Company with respect to future business activities and plans of the Company. Forward-looking information

is often identified by the words “may”, “would”, “could”, “should”, “will”, “intend”, “plan”, “anticipate”, “believe”,

“estimate”, “expect” or similar expressions and includes in formation regarding: the effective date of the

Consolidation; the number of Shares outstanding following the Consolidation; and the treatment of fractional

shares in the Consolidation.

Such forward-looking statements are based on a number of assumptions of management, including, without

limitation, the number of post -Consolidation Shares being different from the number set out herein and the

treatment of fractional Shares in the Consolidation being different from what is set out herein, and t hat the

Company will complete the Consolidation on the anticipated effective date.

Additionally, forward-looking information involves a variety of known and unknown risks, uncertainties and other

factors which may cause the actual plans, intentions, activities, results, performance or achievements of the

Company to be materially differen t from any future plans, intentions, activities, results, performance or

achievements expressed or implied by such forward -looking statements. Such risks include, without limitation: