Nortec Minerals completes NI 43-101 Technical Report and provides Update on Phase 1 drilling, Tomboko Gold Property, Northeast Guinea, West Africa

Resource Estimates Technical Reports (NI 43-101)

NORTEC MINERALS CORP .

TSX-V: NVT / FSE: WMQ / OTC-PK: NMNZF

Suite 915, 700 West Pender Street

Vancouver BC V6C 1G8, Canada

Phone: +1 604-717-6426

TAMMELA MINERALS Oy

c/o Kalliolaw Asianajotoimisto Oy

Eteläranta 12,

FI-00130 Helsinki, Finland

Phone: +358 9 6812 930

Nortec Minerals completes NI 43-101 Technical Report and provides Update on Phase 1

drilling, Tomboko Gold Property, Northeast Guinea, West Africa

Vancouver, BC / TNW – Accesswire / Vancouver, B.C., November 7, 2017 – Nortec Minerals Corp .

(TSX-V: NVT; OTC-PK: NMNZF) (the “Company” or “Nortec”) – Pursuant to Nortec’s recent press

releases the Company announces the completion of Technical Report, compliant with NI 43-101 standards,

on the Tomboko Permit, Northeastern Guinea, West Africa. Mr. Simon Meadows Smith, FIMMM, FGS, of

SEMS Exploration is the author of the Technical Report. The Report will be filed on SEDAR and posted on

the Company ’s website, www.nortecminerals.com, shortly. SEMS Exploration is a full-service mineral

exploration and mining consultancy company in West Africa, providing geological, mining engineering and

environmental services; from grassroots reconnaissance through mineral resource estimations, project

management and mine design to the supervision of feasibility studies. Further information can be referred to

on http://www.sems-exploration.com.

The Technical Report’s conclusions and recommendations are as follows.

Conclusions

The Tomboko Gold Project consists of an exploration licence (Permis de Recherche Minière) in the Siguiri

Basin covering a surface area of 75.9 km². The Tomboko permit is ideally located in an established gold

mining district and is close to two large mine operations (SAG at Siguiri and Nordgold at Lefa), one smaller

gold mine at Kéniéro and advanced projects such as Kouroussa (Cassidy), Tri -K (Avocet / Managem),

Yanfolila (Hummingbird) and Kalana (Endeavour).

Successful reconnaissance and follow-up geochemical surveys as well as first pass geological field mapping

completed by Wega Mining in 2008 and 2009 resulted in the identification of severa l anomalous zones of

gold mineralisation at surface within the western portion of the permit.

Additional field mapping and rock chip sampling by The Golden Rule Ltd. (TGRL) in 2012 delineated two

gold prospects within the target area referred to as TOM-1. These have been named TOM-1 Nord and TOM-

1 Sud. High grade rock chip samples have been collected from TOM -1 Nord prospect with values up to

84.63g/t Au.

Nortec plans to undertake a first pass diamond core drill program of over the high -grade rock chip samples

reported on Tom-1 Nord prospect in the second half of October 2017 (Two drill holes were already completed

to date and a third hole is in progress).

Alluvial gold mining by TGRL in 2010 exploited gold bearing gravels from within a stream channel draining

off Mount Didi and sourced within the Tomboko permit.

The entire Tomboko permit remains prospective for hard rock gold mineralisation. Further work is required

to better understand the controls on mineralisation identified in historical soil geochemical and rock chip

surveys.

Recommendations

It is recommended that further mineral exploration work be undertaken on the Tomboko Permit. The

NORTEC MINERALS CORP .

TSX-V: NVT / FSE: WMQ / OTC-PK: NMNZF

Suite 915, 700 West Pender Street

Vancouver BC V6C 1G8, Canada

Phone: +1 604-717-6426

TAMMELA MINERALS Oy

c/o Kalliolaw Asianajotoimisto Oy

Eteläranta 12,

FI-00130 Helsinki, Finland

Phone: +358 9 6812 930

following recommended activities will further advance geological understanding of the controls on gold

mineralisation:

- Collation of all historical exploration data into a structured database. As well as the representation

of all sampling and survey data in a GIS package to better understand the work completed by HKD

and TGRL.

- High resolution satellite images , captured within the last three months if available, should be

purchased for the entire Tomboko Gold Project. The satellite images will be used to digitise artisanal

mining activities, access tracks and foot paths as well as forming the basis for a regolith map.

- Aerial geophysical surveys should be flown of the entire Tamboko Gold Project. Preferably, high

resolution magnetics on 50m spaced lines. This will assist with the delineation of interpreted shear

zones and the mapping of dolerite, volcaniclastic and sediment contacts.

- Fieldwork should include selective areas of soil geochemical sampling to better define the orientation

and extent of known soil anomalies. Fieldwork should also focus on the ‘ground truthing’ of the

interpreted regolith map and confirm the existence of a felsic intrusive body in the northeast corner

of the permit.

- Soil anomalies can be tested with shallow (approximately 40m deep) RAB or Air Core drilling

- Systemic RC drilling of bedrock mineralisation defined by Air Core drilling.

- Detailed litho-structural mapping of trenches, bulldozer road cuttings and outcrops within the TOM-

1 Nord prospect.

- A structural study of gold mineralisation identified in mechanically excavated trenches and diamond

core. This factual information can be integrated with structural interpretations of remote data, such

as aerial geophysics and satellite images to define the controls upon gold mineralisation within the

Tomboko Gold Project.

- When sufficient drill information is available a mineral resource estimate should be undertaken.

Drilling Update

Further to the Company’s press release dated October 23, 2017, two diamond core drill holes were completed

on the Tom 1 North target. The first two holes (TBDD001A, 002) were drilled at -50° to the Northeast on

Priority 3 Target (50 metre and 100 metre holes) to intersect the trace of surface termite mound soil gold

anomaly. The third hole (TBDD003) is currently in progress and is aimed to target the high grade surface

samples (of 84.6 g/t, 35.8 g/t, 13.9 g/t, 5.8 g/t, 4.7 g/t, 2.5 g/t to trace) and the significant termite mound soil

gold anomaly (Figures 1 and 2).

All the bedrock and termite mound samples were analysed by SGS Labs, an accredited laboratory in Bamako,

Mali. A blank was inserted every 20 th sample for quality control. The split samples are being sent to SGS

Labs for analyses with standard blanks for quality control. The Company will issue press releases upon

receipt of the assays.

NORTEC MINERALS CORP .

TSX-V: NVT / FSE: WMQ / OTC-PK: NMNZF

Suite 915, 700 West Pender Street

Vancouver BC V6C 1G8, Canada

Phone: +1 604-717-6426

TAMMELA MINERALS Oy

c/o Kalliolaw Asianajotoimisto Oy

Eteläranta 12,

FI-00130 Helsinki, Finland

Phone: +358 9 6812 930

Figure 1. Planned drill holes and the locations of completed drill holes , TBDD001, 002 and 003, Tom 1

North Zone.

Figure 2: Outcrop Sampling Results - Tom 1 North Target and Termite and Soil Geochemical Anomalies

– Tomboko Permit.

NORTEC MINERALS CORP .

TSX-V: NVT / FSE: WMQ / OTC-PK: NMNZF

Suite 915, 700 West Pender Street

Vancouver BC V6C 1G8, Canada

Phone: +1 604-717-6426

TAMMELA MINERALS Oy

c/o Kalliolaw Asianajotoimisto Oy

Eteläranta 12,

FI-00130 Helsinki, Finland

Phone: +358 9 6812 930

Mohan R. Vulimiri, M.Sc., P.Geo, Director of Nortec and CEO of Nortec Minerals, is a Qualified Person as

defined by NI 43-101. Mr. Vulimiri has approved the corporate and technical content contained in this press

release.

About Nortec Minerals Corp.

Nortec is a mineral exploration and development company based in Vancouver, British Columbia. The

Company has a 49% interest in the Tammela Gold & Lithium Project in South-West Finland. Sunstone Metals

(formerly Avalon Minerals), a public Australian mining company has earned the 51% interest and is carrying

out the 29% Stage 2 earn-in interest on the Tammela Project. Avalon has completed more than 3,000 meters

diamond drilling on the Kie tyonmaki lithium prospect and the Satulinmaki and Riukka prospects that

comprise the Tammela Project. Detailed information on the Company ’s projects have been posted on the

Company’s website www.nortecminerals.com.

On behalf of the Board of Directors,

NORTEC MINERALS CORP.

“Mohan R. Vulimiri”

Mohan R. Vulimiri, CEO and Chairman

The TSX V enture Exchange has not reviewed and does not accept the responsibility for the adequacy or

accuracy of this news release.

This press release contains certain forward looking statements which involve known and unknown risks, delays

and uncertainties not under the Company ’s control which may cause actual results, performances or

achievements of the Company to be materially different from the results, performances or expectations implied

by these forward looking statements. This news release does not constitute an offer to sell or a solicitation of

an offer to buy any of the securities in the United States.