Nortec Minerals reports Assays, Phase 1 drilling, Tom 1 North - Priority 1 Target, Tomboko Gold Property, Northeast Guinea, West Africa
NORTEC MINERALS CORP .
TSX-V: NVT / FSE: WMQ / OTC-PK: NMNZF
Suite 915, 700 West Pender Street
Vancouver BC V6C 1G8, Canada
Phone: +1 604-717-6426
TAMMELA MINERALS Oy
c/o Kalliolaw Asianajotoimisto Oy
Eteläranta 12,
FI-00130 Helsinki, Finland
Phone: +358 9 6812 930
Nortec Minerals reports Assays, Phase 1 drilling, Tom 1 North - Priority 1 Target,
Tomboko Gold Property, Northeast Guinea, West Africa
Vancouver, BC / TNW – Accesswire / Vancouver, B.C., January 3, 2018 – Nortec Minerals Corp .
(TSX-V: NVT; OTC -PK: NMNZF) (the “Company” or “Nortec ”) – Nortec announces results from
seven diamond core holes on the Tom 1 Target, Tomboko Project, Northeastern Guinea, West Africa (Figure
1). Five holes, TBDD003, 004, 005, 006 and 007 were drilled on Priority 1 Target (Figures 3 and 4) and
two drill holes TBDD0001 and 002 were drilled on Priority 3 Target (Figure 3).
Highlights
• Assay results received from hole TBDD0007 include:
Cut-off 0.5 g/t and up to 2m internal dilution
o 9m at 2.74 g/t gold from 32m, including 3.57m at 3.91 g/t from 36m.
o 7m at 3.57 g/t gold from 43m, including 1m at 17.1 g/t from 45m.
Cut-off 0.2 g/t and 2m internal dilution
o 19m at 2.64 g/t from 31m.
• Results define a significant orogenic gold system with both narrow high grade
intervals and wide lower grade intervals opening up to the Southeast with drill hole
TBDD0007.
• The gold system trending and raking to the Southeast, and is open down dip and to
the Southeast.
• Drilling commencing from TBDD0003, 0004, 0005 and 0006 from the Northwest on
the Priority 1 Target shows the gold values increasing to the Southeast (Table 1).
The core drilling program was halted pending receipt of the assays from the seven drill holes. This allowed
to both conserve funds and time to interpret the geology and plan the next drilling phase. With the receipt
of significant results in the last hole, TBDD0007, the next phase of drilling is expected to commence in late
January 2018 to define and delineate the Priority 1 Target to the Southeast. This drilling will consist of less
expensive Rotary Air Blast (RAB) and Reverse Circulation Drilling (RC). The drilling will also test the rest
of the termite mound anomalies, ge ochemical soil and termite mound anomalies, as well as artisanal
workings on the Tom 1, Tom 2 and Tom 3 targets. This is intended to further assist in defining target areas
for carrying out an exploration program in a cost-efficient manner.
Mohan Vulimiri, CEO and Chairman comments, “We are very pleased with the receipt of significant results
in drill hole TBDD0007. This provides the Company a great opportunity to systematically carry out a
drilling program to define and delineate a shallow gold-bearing Priority 1 Zone as well as test all the other
geochemical anomalies and artisanal workings.”
Details with respect to the geology and historical geochemical results are contained in press releases on the
Company’s website. Further to the Company press release dated November 7, 2017, the Nortec is amending
and updating the NI -43-101 Technical Report on review and comments by TSX Venture Exchange. The
Report was filed on SEDAR on November 8, 2017.
NORTEC MINERALS CORP .
TSX-V: NVT / FSE: WMQ / OTC-PK: NMNZF
Suite 915, 700 West Pender Street
Vancouver BC V6C 1G8, Canada
Phone: +1 604-717-6426
TAMMELA MINERALS Oy
c/o Kalliolaw Asianajotoimisto Oy
Eteläranta 12,
FI-00130 Helsinki, Finland
Phone: +358 9 6812 930
The drill core was sawed in half and the samples were analysed by SGS Labs, an accredited laboratory in
Bamako, Mali. A duplicate, a blank and a standard were inserted every 10 th sample for quality control.
Samples are processed by Fire Assay with A.A. finish under the SGS FAA505 protocol.
Mohan R. Vulimiri, M.Sc., P.Geo, CEO, Nortec Minerals, is a Qualified Person as defined by NI 43 -101.
Mr. Vulimiri has approved the corporate and technical content contained in this press release
About Nortec Minerals Corp.
Nortec is a mineral exploration and development company based in Vancouver, British Columbia. The
Company has a 49% interest in the Tammela Lithium and Gold Project in South-West Finland. Sunstone
Metals (formerly Avalon Minerals), a public Australian mining company has earned the 51% interest and is
carrying out the 29% Stage 2 earn -in interest on the Tammela Project. Sunstone has completed more than
3,000 meters diamond drilling on the Kietyonmaki Lithium prospect and the Satulinmaki and Riukka gold
prospects that comprise the Tammela Project. Drilling on the Kietyonmaki returned values of 42.1m at
1.05% Li2O from 17.9m downhole, including 24.2m at 1.44% Li2O from 17.9m and 9m at 2.00% Li2O
from 29m downhole. Detailed information on the Company’s projects have been posted on the Company’s
website www.nortecminerals.com.
On behalf of the Board of Directors,
“Mohan R. Vulimiri”
Mohan R. Vulimiri, CEO and Chairman
The TSX V enture Exchange has not reviewed and does not accept the responsibility for the adequacy or
accuracy of this news release.
This press release contains certain forward looking statements which involve known and unknown risks,
delays and uncertainties not under the Company’s control which may cause actual results, performances
or achievements of the Company to be materially different from the results, performances or expectations
implied by these forward looking statements. This news release does not constitute an offer to sell or a
solicitation of an offer to buy any of the securities in the United States.
NORTEC MINERALS CORP .
TSX-V: NVT / FSE: WMQ / OTC-PK: NMNZF
Suite 915, 700 West Pender Street
Vancouver BC V6C 1G8, Canada
Phone: +1 604-717-6426
TAMMELA MINERALS Oy
c/o Kalliolaw Asianajotoimisto Oy
Eteläranta 12,
FI-00130 Helsinki, Finland
Phone: +358 9 6812 930
Figure 1: Location Map. Guinea, West Africa
Figure 2: Outcrop Grab Sampling Results and location of drilling - Tom 1 North- Priority 1Target and
Termite and Soil Geochemical Anomalies, Tom 1 North, Tom 1 South and Tom 3 targets – Tomboko
Permit. Note that grab samples may not necessarily be representative of the rock unit or the
mineralization style being sampled.
Area of drilling, Priority 1 Target
NORTEC MINERALS CORP .
TSX-V: NVT / FSE: WMQ / OTC-PK: NMNZF
Suite 915, 700 West Pender Street
Vancouver BC V6C 1G8, Canada
Phone: +1 604-717-6426
TAMMELA MINERALS Oy
c/o Kalliolaw Asianajotoimisto Oy
Eteläranta 12,
FI-00130 Helsinki, Finland
Phone: +358 9 6812 930
Figure 3: Completed core drill holes, TBDD0001, 0002, 0003, 0004, 0005, 0006 and 0007 (all holes
were drilled at -50° dip and an azimuth of 50°) – Tom 1 North Target, Tomboko Permit.
NORTEC MINERALS CORP .
TSX-V: NVT / FSE: WMQ / OTC-PK: NMNZF
Suite 915, 700 West Pender Street
Vancouver BC V6C 1G8, Canada
Phone: +1 604-717-6426
TAMMELA MINERALS Oy
c/o Kalliolaw Asianajotoimisto Oy
Eteläranta 12,
FI-00130 Helsinki, Finland
Phone: +358 9 6812 930
Figure 4: Priority 1 Target - Completed core drill holes, TBDD0003, 0004, 0005, 0006 and 0007 (all
holes were drilled at -50° dip and an azimuth of 50°) – Tom 1 North, Tomboko Permit. Zone appears to
be trending and raking to Southwest based on the assay results (Table 1).
19m @ 2.64 g/t Au
Including 7m @ 3.57 g/t,
9m @ 2.74 g/t,
NORTEC MINERALS CORP .
TSX-V: NVT / FSE: WMQ / OTC-PK: NMNZF
Suite 915, 700 West Pender Street
Vancouver BC V6C 1G8, Canada
Phone: +1 604-717-6426
TAMMELA MINERALS Oy
c/o Kalliolaw Asianajotoimisto Oy
Eteläranta 12,
FI-00130 Helsinki, Finland
Phone: +358 9 6812 930
Table1
Drill Holes from Northwest to Southeast (Figure3 and 4)
Priority 1 Target
Hole No: from (m) to
(m) interval grams/tonne
TBDD0004 0 1 1 0.67
TBDD0005 0 1 1 1.18
TBDD0005 1 2.36 1.36 0.21
TBDD0006 0 0.7 0.7 0.36
TBDD0006 0.7 2 1.3 0.22
TBDD0006 57 58 1 0.36
TBDD0006 58 59 1 0.35
TBDD0006 79 80 1 6.50
TBDD0006 150 151 1 0.20
TBDD0006 151 152 1 0.16
TBDD0006 152 153 1 0.16
TBDD0003 15 16 1 0.62
TBDD0003 16 17 1 2.26
TBDD0003 17 18 1 5.24
TBDD0003 18 19 1 0.18
TBDD0007 31 32 1 0.20
TBDD0007 32 33 1 1.23
TBDD0007 33 34 1 2.04
TBDD0007 34 35 1 2.89
TBDD0007 38 39 1 4.28
TBDD0007 39 39.57 0.57 4.60
TBDD0007 44 45 1 1.65
TBDD0007 45 46 1 17.10
TBDD0007 46 47 1 2.58
TBDD0007 47 48 1 0.41
TBDD0007 48 49 1 0.32
TBDD0007 49 50 1 1.66
Drill Holes TBDD0001, TBDD0002 – Priority 3 Target
TBDD0001 38 39 1 0.98
TBDD0002 10 11 1 0.52