Nortec Confirms Priority Copper Drill Target at Sturgeon Lake VMS Project, Ontario, Canada
Nortec Confirms Priority Copper Drill Target at
Sturgeon Lake VMS Project, Ontario, Canada
Vancouver, British Columbia--(Newsfile Corp. - February 7, 2024) -
NORTEC MINERALS CORP
.
(TSXV: NVT)
("
Nortec
" or the "
Company
") is pleased to announce the final soil sampling results from
the 2023 sampling program and initial results from the 2023 ground-based EM ("Electromagnetic")
geophysical survey on the northeast copper target of the Sturgeon Lake VMS project (see news release
Nov 21, 2023). Results confirm the presence of a highly conductive and highly copper-anomalous VMS
("Volcanic Hosted Massive Sulphide") prospect that has not been drill tested.
This zone is now
considered highly prospective for a new copper discovery and the Company plans to drill test this target
during the next exploration campaign.
Highlights
Multiple highly anomalous copper-silver-gold soil results from the northeast copper target, including
297ppm copper and 0.6g/t silver, potentially representing a copper-silver rich stockwork system
near surface (Figure 1).
Ground EM survey confirms a strong untested late-time conductor that was originally identified in a
VTEM ("Versatile Time Domain Electromagnetic") survey (see news release May 31, 2023) and
defined a drill-ready target that is on strike of copper-stockwork mineralization and the above
copper-silver soil anomaly (Figure 3).
Multiple systematic work campaigns in 2023 and historical data compilation and targeting has
resulted in the identification of three high-quality VMS massive sulphide target areas, including the
northeast copper target area, all of which are fully permitted for drilling.
"The results from the 2023 soil survey, along with the recently completed ground EM survey, have now
confirmed the presence of a high-quality, and potentially copper-rich VMS target that is drill ready for
discovery. Our systematic and technically focused efforts have resulted in the identification and
advancement of several high-quality, de-risked VMS targets that are fully permitted for a maiden drill
campaign," stated Cameron Bell, Vice President of Exploration.
Final soil sample analyses were recently received from the 2023 soil program that covered the northeast
copper target area (Figure 1). Results confirm the presence of a copper-silver rich VMS target that hosts
a series of untested and underexplored EM anomalies within a favorable VMS stratigraphic setting. One
soil sample returned grades of 297ppm copper and 0.6g/t silver proximal to historical copper-rich drilling
and on the western edge of a strong untested ground EM conductor (see below). This data is interpreted
to represent a copper-silver stockwork that is part of a larger VMS system.
The fixed-loop Time Domain Electromagnetic (TDEM) ground survey, conducted by Abitibi geophysics,
has had initial results processed and interpreted. The survey was conducted over the northeast copper
target area, where a series of strong VTEM conductors were identified in the 2023 survey, and where
historical drilling (holes H-9, Ontario Assessment File 52G15NW0086 and C2, Ontario Assessment File
52G15NW0042) intersected pervasive copper stock-work type mineralization. A significant late-time
channel, and strongly conductive anomaly was identified immediately east of the historical drilling and
remains untested (Figure 3). Several other near-surface, underexplored conductors were also identified,
including an area that hosts the highly anomalous copper-silver soils along with historical copper-rich
drilling and which are in the process of being interpreted and modelled.
The confirmation of a high-quality and potentially copper-rich massive sulphide VMS target at the
northeast copper target has resulted from systematically advancing and de-risking the target area
through VTEM, soil and ground EM work programs. In addition, the compilation and interpretation of
historical work has demonstrated that this is a high-quality target and suggests the massive sulphide part
of the VMS system has yet to be discovered.
The project now hosts three high-priority, de-risked and drill-ready target areas that all have coincident
EM, magnetics and soil anomalies.
Each of these targets
are fully permitted for drill testing (Figure 2).
About Sturgeon Lake VMS Property
The Sturgeon Lake VMS Property lies immediately north and adjacent to Glencore's past-producing
mines and is host to the highly prospective continuation of the volcanogenic massive sulphide ("VMS")
producing volcanic stratigraphy. Numerous historical drill intercepts on the property host anomalous zinc
- copper mineralization and favourable VMS geology. Drill holes H-9 and C-81-2 (Ontario Assessment
File 52G15NW0038) also display strong potential for both copper and gold-rich VMS systems in two
highly prospective areas, where drill intercepts of
3.1% Cu
/ 0.3m and
5.8g/t Au
/ 0.9m were realized.
Historic hole locations have not been verified in the field and are interpreted from assessment reports.
The Sturgeon Lake VMS mining camp is host to five high-grade past producing zinc - copper - lead -
silver - gold mines of Glencore plc, having a total combined production of 19.8Mt @ 8.50% Zn, 1.06%
Cu, 0.91% Pb and 119.7g/t Ag
(Franklin, J. M., 1996. Volcanic-associated massive sulphide base
metals in Eckstrand, O. R., Sinclair, W. D., Thorpe, R.I. (eds.), Geol. Survey Canada Geology of
Canada 8, 158-183.).
The Sturgeon Lake Mine Camp is located within the prolific Sturgeon Lake greenstone belt in the
Wabigoon sub-province of Ontario's Superior Province, approximately 270 kilometers northwest of
Thunder Bay.
Figure 1
: 2023 Soil results (Cu-Ag-Au) with VTEM (SFz15 EM) as background.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4874/197122_f4d28259a4876b88_001full.jpg
Figure 2
: Priority drill target areas with soils and VTEM (SFz15 EM) as background.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4874/197122_f4d28259a4876b88_002full.jpg
Figure 3
: 2023 Ground EM results (showing Bz Channel 29 conductor) with interpreted (from
assessment reports) location of copper-rich historical drill holes.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4874/197122_f4d28259a4876b88_003full.jpg
Qualified Person
The technical information in this release has been reviewed and verified by Cameron Bell, P. Geo., Vice
President of Exploration of the Company, and the Qualified Person as defined by National Instrument 43-
101.
About Nortec Minerals Corp.
Nortec is a mineral exploration company that holds 100% interests in two exploration stage critical
mineral (zinc) projects, namely the Mattagami River Zinc and the Sturgeon Lake VMS properties, both
located in Ontario, Canada.
Additionally, the Company holds a 16.4% interest in the Tammela Gold and
Tammela Lithium projects in Southwest Finland. Additional information can be found on the Company's
SEDAR+ profile at
www.sedarplus.ca
and its website at
www.nortecminerals.com
.
On behalf of the Company,
"Sara Hills"
Chief Financial Officer
Neither the TSX Venture Exchange nor its Market Regulator (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of
this release.
Information set forth in this press release may contain forward-looking statements. Forward-looking
statements are statements that relate to future, not past events. In this context, forward-looking
statements often address a company's expected future business and financial performance, and often
contain words such as "anticipate", "believe", "plan", "estimate", "expect", and "intend", statements
that an action or event "may", "might", "could", "should", or "will" be taken or occur, or other similar
expressions. By their nature, forward-looking statements involve known and unknown risks,
uncertainties and other factors which may cause our actual results, performance or achievements, or
other future events, to be materially different from any future results, performance or achievements
expressed or implied by such forward-looking statements. Such factors include, among others, risks
associated with project development; the need for additional financing; operational risks associated
with mining and mineral processing; fluctuations in palladium and other commodity prices; title
matters; environmental liability claims and insurance; reliance on key personnel; the absence of
dividends; competition; dilution; the volatility of our common share price and volume; and the impact
of governmental entities. Forward-looking statements are made based on management's beliefs,
estimates and opinions on the date that statements are made and the Company undertakes no
obligation to update forward-looking statements if these beliefs, estimates and opinions or other
circumstances should change. Investors are cautioned against attributing undue certainty to forward-
looking statements.
To view the source version of this press release, please visit
https://www.newsfilecorp.com/release/197122