Novo Secures Strategic Land Position in the Onslow District Western Australia
Novo Secures Strategic Land Position in the Onslow District Western Australia
HIGHLIGHTS
• Novo strengthens its high-quality, Australian based exploration portfolio by securing a significant new ground position of
approximately 1,520 sq km at the Toolunga Project in the Onslow District of Western Australia via:
◦ A binding term sheet granting Novo an option to acquire a 70% interest in OD4 Rocklea Pty Ltd’s Cane River
Project.
◦ Direct pegging by Novo of 6 new exploration licenses (100% Novo).
• The Toolunga Project is underexplored with prospectivity for precious and base metal discovery and aligns with
Novo’s exploration strategy of exploring for targets with
> 1 Moz Au potential.
• The district has geochemical signatures of Intrusion Related Gold (IRG), porphyry, Iron Oxide Copper Gold (IOCG) and
related deposit styles (epithermal), with some affinities to the same aged Tennant Creek District.
• The consolidated tenement package contains several historical mining centres and numerous targets defined by gravity
and magnetic anomalies and anomalous surface geochemistry.
• The Toolunga Project encompasses the junction of major tectonic boundaries including the Paleoproterozoic Capricorn
Orogen near the intersection of the Pilbara Craton and Ashburton Basin.
• The combined OD4 Rocklea Pty Ltd and pegged Novo ground is located ~80 km northwest of Black Cat Syndicate’s
(ASX: BC8) Paulsens Gold Mine and 70 km southeast of the Onslow townsite, with excellent access to the area via
sealed roads.
• Regional and follow-up exploration campaigns are planned on tenure grant, including geophysical surveys, mapping and
geochemical sampling programs over known targets to rapidly advance drill targets.
• Novo continues to review opportunities that will compliment the current Western Australian and Victoria precious and
base metals portfolio.
Commenting on the acquisition, Mike Spreadborough, Executive Co-Chairman and Acting Chief Executive Officer, said: “ We
are delighted to announce that as part of Novo’s concerted project generation program and after extensive due diligence, we
have pegged new ground and taken steps to acquire further strategic interests in landholdings in the Onslow District that we
believe have strong exploration potential.
“The Toolunga Project is in a highly prospective and under-explored district with substantial areas of untested shallow cover
where prospectivity for intrusion-related systems is deemed high. This land package provides Novo with a platform to build a
strategic position in the district, where we can deploy the expertise of our highly experienced exploration team and deliver on
our targeted growth objectives.
VANCOUVER, British Columbia, Dec. 10, 2024 -- Novo Resources Corp. (Novo or the Company) (ASX: NVO) (TSX: NVO)
(OTCQX: NSRPF) is pleased to announce the acquisition of a strategic landholding in the Onslow District of Western
Australia, to compliment the Company’s exciting portfolio of Australian-based, high-grade gold exploration projects.
Novo has combined 634 sq km of 100% owned tenure pegged as six Exploration License Applications with a further 890 sq
km in four Exploration License Applications via an option arrangement with OD4 Rocklea Pty Ltd (OD4R) on the Cane River
Project (under which Novo would acquire a 70% interest if the option is exercised) to cover a significant landholding of 1,524
sq km termed the Toolunga Project (Figure 1).
Figure 1: Location of Novo Pilbara tenure, noting the Onslow District and the Toolunga Project including the Odette 4 Rocklea
and Novo 100% Applications
This sizeable landholding acquired by Novo in the Onslow District is underexplored yet displays prospectivity for precious and
base metal discovery and aligns with Novo’s corporate strategy of exploring for targets with > 1 Moz Au potential (Figure 2).
Tenure Summary
OD4R’s Cane River Project covers 890 km sq across four Exploration Licence applications (E08/3597, E08/3598, E08/3599,
and E08/3600) (Table 1 ).
Novo’s newly pegged tenure covers 634 km sq across six Exploration License applications (E08/3760, E08/3761, E08/3762,
E08/3763, E08/3764 & E08/3765) (Table 1 ).
Figure 2: Location of the combined Toolunga Project in northern WA
OD4 Rocklea Pty Ltd (OD4R) is a wholly owned subsidiary of Odette Geoscience Pty Ltd (Odette). Odette is a private
company that applies strong regional science and data integration to exploration project generation focused on Western
Australia. Project generation by Odette has been responsible for the development of numerous projects that various
companies are in the process of advancing.
Table 1: Onslow Project tenement application details
Tenement
Number
Application
Date
Number
of Blocks
Applicant’s
Name
E08/3597* 25/01/2023 70 OD4 Rocklea Pty Ltd
E08/3598* 25/01/2023 70 OD4 Rocklea Pty Ltd
E08/3599* 25/01/2023 70 OD4 Rocklea Pty Ltd
E08/3660* 25/01/2023 70 OD4 Rocklea Pty Ltd
E08/3760** 27/11/2024 37 Karratha Gold Pty Ltd
E08/3761** 27/11/2024 40 Karratha Gold Pty Ltd
E08/3762** 27/11/2024 22 Karratha Gold Pty Ltd
E08/3763** 27/11/2024 32 Karratha Gold Pty Ltd
E08/3764** 27/11/2024 19 Karratha Gold Pty Ltd
E08/3765** 27/11/2024 50 Karratha Gold Pty Ltd
*Novo has the option to acquire a 70% interest in these tenements once granted to OD4 and following a two-stage farm-in
period (see further below).
**Karratha Gold Pty Ltd is a wholly owned subsidiary of Novo.
Figure 3: Toolunga Project tenement details (including both OD4R and Novo Exploration License Applications) and regional
mineral occurrence information from WAMEX
Location and Prospectivity
The combined OD4R and pegged Novo ground is located ~80 km northwest of Black Cat Syndicate’s (ASX: BC8) Paulsens
Gold Mine and 70 km southeast of the Onslow townsite, with excellent access to the area via sealed roads ( Figure 2 ). The
tenure targets a range of minerals of particular interest to Novo, including precious and base metals with particular focus on
gold, and will be referred to as the Toolunga Project.
The Toolunga Project is located at the junction of major tectonic boundaries in the north of Western Australia and
incorporates the Paleoproterozoic Capricorn Orogen near the intersection of the Pilbara Craton, the Ashburton and Edmund
Basins and the Gascoyne Province ( Figure 2 ). The basins lie unconformably on basement metasediments and granitoids of
the Gascoyne Province and the project area is transected by major NE-SW and N-S striking structures.
The district displays geochemical signatures suggesting potential intrusion related systems, including Intrusion Related Gold
(IRG), porphyry, Iron Oxide Copper Gold (IOCG) and related deposit styles (epithermal), with some affinities to the same aged
Tennant Creek District (1850 to 1660 Ma mineralisation event) where high grade Au, Cu and Bi deposits are present ( Figure
3).
The Onslow District is under-explored using systematic, modern exploration technologies.
In the late 1990s to early 2000s, the project area was targeted by WMC Resources Ltd and ranked highly for iron-oxide copper
-gold potential1. The Toolunga Project includes numerous mineral occurrences with the regulatory database recording assay
results up to 3.1% Cu, 33% Pb, and 125ppm Ag at the Range No. 2 Prospect 2. Multiple occurrences in the district include
Cu, Cu-base metals, U (paleochannel), REE, and Bi-Mo-W. Historic prospects were not routinely assayed for Au, Ag, Bi, W
and Sn (refer Appendix 1).
Recent work including regional tectonic studies 3 and publicly available geophysical data has also highlighted several
significant targets including the Mt Minnie Prospect, Range Gravity anomaly and the Ironstone Bore prospect, which are
associated with regional base-metal trends and present as buried magnetic and/or gravity anomalies pending follow up work.
The entire project area has received minimal previous attention with drilling. Due diligence work by Novo has affirmed the
regional potential of this under explored part of Western Australia.
A series of targets have been generated by Novo and OD4R based on current geological understanding and initial assessment
of regional geophysics and open file GSWA geochemical sampling (Appendix 1):
• Large geophysical targets (gravity – magnetic) with surface geochemical support.
• Range No. 2 – Historic shaft sunk into a shear zone with peak rock chip samples of 3.1% Cu, 33% Pb and 125
ppm Ag – not drilled.
• Bullajacka Well - Historic Cu-Au occurrence with rock chip results of 6.2% Cu, 0.19 ppm Au, 94 ppm Ag, 310
ppm Bi and 41 ppm Sb 4.
• Mt Minnie – kilometre scale coincident magnetic and gravity anomaly in a triple junction between the Bandee Fault
Lithospheric Boundary and the Mindle Shear Zone, with anomalous As-Cu-Pb-Zn stream samples.
• Range North – Strongest Cu soil anomaly in WAMEX dataset for the area, including a peak of 147 ppm Cu5 parallel to a
N-S structure.
Historical data and sample results may not be representative of mineralisation in the district. Novo has not independently
validated the public results listed in historic WAMEX reports or the information included in the DEMIRS database and is
therefore not to be regarded as reporting, adopting or endorsing the results. No assurance can be given that Novo will achieve
similar results as part of its exploration activities at the Toolunga Project.
ESG Criteria
Part of the Cane River Project is situated in the Cane River Conservation Park (Figure 1). The park was created in 2001
(Reserve Number 46122). The reserve is vested with the Conservation and Parks Commission and is currently managed by the
Department of Biodiversity, Conservation and Attractions (DBCA) pursuant to the Conservation and Land Management Act
1984 (WA) for the protection of flora, fauna, landscape and aboriginal cultural heritage. OD4R has developed a detailed
Conservation Management Plan (CMP), in consultation with the DBCA, for activities within the Cane River Conservation Park,
which is pending final acceptance.
Heritage and Native Title
The southern tenements in the Toolunga Project are covered by the Thalanyji People’s Native Title Determinations
(WAD6113/1998 and WCD2008/003) and managed by the Buurabalayji Thalanyji Aboriginal Corporations RNTBC. Novo is
committed to developing strong relationships with the Traditional Owners of the lands on which it operates through open and
honest dealings. It is anticipated that Novo will meet with the traditional owners in the first quarter of 2025.
The northern section of the combined project area is without a native title claim. This area will be monitored for the lodgement
of a new claim. If a claim is lodged, the same level of consultation as above will occur with the new representative
body/traditional owners to ensure informed consent for exploration in the area is gained.
Figure 4: Toolunga Project tenure showing regional targets over 1VD aeromagnetic image in a complex structural setting
Forward Programs
Regional and follow-up exploration campaigns are planned on tenement grant, including geophysical surveys, mapping and
geochemical sampling programs over known targets to validate historic results and to rapidly advance drill targets.
Material Cane River Project Option Terms
The key terms of the binding term sheet with Odette Geoscience Pty Ltd and OD4 Rocklea Gold Pty Ltd (OD4R) regarding the
Cane River project are set out below:
• On signing of the agreement, Novo will reimburse OD4R $55,000 (approximately C$50,000) cash for expenditure
incurred to date.
• At grant date of the tenement applications, Novo will pay OD4R, an additional $45,000 (approximately C$41,000) in
cash and have an initial farm in period of 12 months.
• Following that initial period, if Novo chooses to continue, it will pay OD4R Novo shares to the value of A$100,000
(currently, approximately C$91,000) for a second farm in period of 12 months.
• At completion of the second farm-in period, Novo has the option to terminate the agreement or exercise the option and
form a 70/30 unincorporated joint venture with OD4R, in which OD4R is free carried until a decision is made to
commence commercial mining operations within the tenements. If the option is exercised, Novo will acquire a 70%
interest in the tenements.
Authorised for release by the Board of Directors.
CONTACT
Investors:
Mike Spreadborough
+61 8 6400 6100
North American Queries:
Leo Karabelas
+1 416 543 3120
Media:
Cameron Gilenko
+61 466 984 953
QP STATEMENT
Mrs. Karen (Kas) De Luca (MAIG), is the qualified person, as defined under National Instrument 43-101 Standards of
Disclosure for Mineral Projects , responsible for, and having reviewed and approved, the technical information contained in this
news release. Mrs De Luca is Novo’s General Manager Exploration.
JORC COMPLIANCE STATEMENT
The information in this news release that relates to the Onslow District Consolidation by Novo into the Toolunga Project is
based on information compiled by Mrs De Luca, who is a full-time employee of Novo Resources Corp. Mrs De Luca is a
Competent Person who is a member of the Australian Institute of Geoscientists. Mrs De Luca has sufficient experience that is
relevant to the style of mineralisation and the type of deposits under consideration and to the activity being undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves'. Mrs De Luca consents to the inclusion in the report of the matters based on her
information in the form and context in which it appears.
FORWARD-LOOKING STATEMENTS
Some statements in this news release may contain “forward-looking statements” within the meaning of Canadian and
Australian securities law and regulations. In this news release, such statements include but are not limited to planned
exploration activities and the timing of such. These statements address future events and conditions and, as such, involve
known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements
to be materially different from any future results, performance or achievements expressed or implied by the statements. Such
factors include, without limitation, customary risks of the resource industry and the risk factors identified in Novo’s annual
information form for the year ended December 31, 2023 (which is available under Novo’s profile on SEDAR+ at
www.sedarplus.ca and at www.asx.com.au) in the Company’s prospectus dated 2 August 2023 which is available at
www.asx.com.au. Forward-looking statements speak only as of the date those statements are made. Except as required by
applicable law, Novo assumes no obligation to update or to publicly announce the results of any change to any forward-looking
statement contained or incorporated by reference herein to reflect actual results, future events or developments, changes in
assumptions or changes in other factors affecting the forward-looking statements. If Novo updates any forward-looking
statement(s), no inference should be drawn that the Company will make additional updates with respect to those or other
forward-looking statements.
_________________________
1 Refer WAMEX archive Annual Reports A48727 and A51684.
2 MINEDEX Western Australian government (DEMIRS) mineral occurrence archive. Site ID S0030858 . Also refer to WAMEX archive Annual Report A32269 for sample
methodologies.
3 Refer Aitken, A.R.A et al. (2018) The tectonics and mineral systems of Proterozoic Western Australia: Relationships with supercontinents and global secular change,
Geoscience Frontiers, 9(2); & Occhipinti, S., et al, (2020). The evolution from plate margin to intraplate mineral systems in the Capricorn Orogen, links to prospectivity. Ore
Geology Reviews, 127.
4 MINEDEX Western Australian government (DEMIRS) mineral occurrence archive. Site ID S0031595. Also refer to WAMEX archive Annual Report A47059 for sample
methodologies.
5 Refer WAMEX archive Annual Report A76797.
6 Refer to De Grey ASX Announcement, Hemi Gold Project Resource Update, dated 21 November 2023 No assurance can be given that a similar (or any) commercially
viable mineral deposit will be determined at Novo’s Becher Project
7. Refer to Novo ASX announcement, 10 October 2024, De Grey reaches A$7m minimum spend at Egina Gold project and continues to invest
ABOUT NOVO
Novo is an Australian based gold explorer listed on the ASX and the TSX focused on discovering standalone gold projects with
> 1 Moz development potential. Novo is an innovative gold explorer with a significant land package covering approximately
5,500 square kilometres in the Pilbara region of Western Australia, along with the 22 square kilometre Belltopper project in the
Bendigo Tectonic Zone of Victoria, Australia.
Novo’s key project area is the Egina Gold Camp, where De Grey Mining (ASX: DEG) is farming-in to form a JV at the Becher
Project and surrounding tenements through exploration expenditure of A$25 million within 4 years for a 50% interest. The
Becher Project has similar geological characteristics as De Grey’s 12.7 Moz Hemi Project 6. Novo is also advancing gold
exploration south of Becher in the Croydon JV (Novo 70%: Creasy Group 30%), after Novo identified gold mineralisation in
2023 exploration drilling at Nunyerry North. Novo continues to undertake early-stage exploration across its Pilbara tenement
portfolio.
Novo has also formed a lithium joint venture with SQM in the Pilbara which provides shareholder exposure to battery metals.
Novo has a significant investment portfolio and a disciplined program in place to identify value accretive opportunities that will
build further value for shareholders.
Please refer to Novo’s website for further information including the latest corporate presentation.
An Exploration Target as defined in the JORC Code (2012) is a statement or estimate of the exploration potential of a mineral deposit in a defined geological setting where the
statement or estimate, quoted as a range of tonnes and a range of grade (or quality), relates to mineralisation for which there has been insufficient exploration to estimate a
Mineral Resource. Accordingly, these figures are not Mineral Resource or Ore Reserve estimates as defined in the JORC Code (2012). The potential quantities and grades
referred to above are conceptual in nature and there has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further exploration will result in the
estimation of a Mineral Resource. These figures are based on the interpreted continuity of mineralisation and projection into unexplored ground often around historical
workings. The Exploration Target has been prepared in accordance with the JORC Code (2012). as detailed in the Company’s ASX announcement released on 25 September
2024 (available to view at www.asx.com.au ). The Tonnage range for the exploration target is 1.5Mt to 2.1Mt, the Grade range is 6.6g/t Au to 8.4g/t Au and the Ounces range
from 320koz Au to 570 koz Au. The Company confirms that it is not aware of any new information that material affects the information included in the original market
announcement and that all material assumptions and technical parameters underpinning the estimates in the original market announcement continue to apply and have not
materially changed. Dr Christopher Doyle (MAIG) and Dr Simon Dominy (FAusIMM CPGeo; FAIG RPGeo), are the qualified persons, as defined under National Instrument 43
-101 Standards of Disclosure for Mineral Projects, responsible for, and having reviewed and approved, the technical information relating to the exploration target. Dr Doyle is
Novo’s Exploration Manager - Victoria and Dr Dominy is a Technical Advisor to Novo.
Appendix 1 - JORC Code, 2012 Edition – Table 1
Section 1: Sampling Techniques and Data
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g., cut
channels, random chips, or specific specialised
industry standard measurement tools
appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld
XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of
sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.
• Aspects of the determination of mineralisation
that are Material to the Public Report.
• In cases where ‘industry standard’ work has
been done this would be relatively simple (e.g.,
‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases, more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (e.g., submarine nodules)
may warrant disclosure of detailed information.
• Rock samples at Range No. 2 (A32269) were
taken as part of a detailed mapping program
and were selective in nature. The sample
methodology and analysis method are not
recorded.
• Rock samples at Bullajacka (A47059) we part
of a larger 77 sample program targeting historic
small workings in the area. The sample
methodology is not recorded. Samples were
submitted to Genalysis Laboratory in
Maddington, Western Australia, and digested
via aqua regia or multi-acid, and analysed via
AAS or ICPMS.
• Soil sampling at Range North (A76797) was
part of a large 2366 soil sample program in
areas within the project not yet covered by
surface geochemistry. An orientation study was
conducted for all samples, comprising a 2 kg
sample collection taken at a depth of 10 – 20
cm below the surface. The sample was split
into 1 kg and digested via 24 hour BLEG (0.1%
cyanide). The other 1 kg split was sieved to >
0.8 mm, 0.8 mm – 0.18 mm and < 0.18 mm
fractions, with the latter two crushed,
pulverised, and analysed via Aqua Regia.
• Drill type (e.g., core, reverse circulation, open-