Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NVO.TO ·

New ‘Hemi Style’ GOLD Targets Identified FOR Immediate Drilling at Becher

Exploration Programs

1

Suite 1100, 1199 West Hastings Street

Vancouver, BC, Canada V6E 3T5

P: +1-416-543-3120 E: [email protected] www.novoresources.com

MARCH 6, 2023

NEW ‘HEMI STYLE’ GOLD TARGETS IDENTIFIED

FOR IMMEDIATE DRILLING AT BECHER

HIGHLIGHTS

• The Becher Project is located ~28 km WSW of De Grey Mining’s (ASX:DEG) 10.6 Moz Au (JORC 2012) 1

Mallina Gold Project (includes the Hemi deposit) and is Novo’s focus for its next drilling program.

• Analysis of 2 022 Becher aircore (“ AC”) drilling assay results has identified high-priority structural and

intrusion-related targets which appear similar to the Hemi deposit.

• Multi-element assays from ‘end -of-hole’ AC drilling in 2022 identif ied prospective hornblende -diorite

intrusions in targets at Becher. These intrusions are commonly associated with gold deposits in the Mallina

Basin.

• Multiple target areas based on gold and multi-element anomalies are present across Heckmair, Whillans,

Irvine, Bonatti, and Lowe prospects.

• Previously released peak AC drilling results include2:

o Irvine prospect:

▪ 8 m @ 2.15 g/t Au from 8 m (F0632)

▪ 23 m @ 0.56 g/t Au from 0 m (A0034)

▪ 2 m @ 0.91 g/t Au from 66 m (A003)

o Whillans prospect:

▪ 8 m @ 0.20 g/t Au from 16 m (F0519)

▪ 4 m @ 0.37 g/t Au from 20 m (F1136)

o Heckmair prospect:

▪ 4 m @ 0.40 g/t Au from 12 m (F0738)

▪ 3 m @ 0.44 g/t Au from 20 m (F0858)

• Best new results from Bonatti prospect include:

o 4 m @ 0.99 g/t Au from 17 m (F1393)

o 5 m @ 0.49 g/t Au from 8 m (F1242)

• Previously released reverse circulation (“RC”) drilling at Irvine provided peak intercepts of2:

o 33 m @ 0.493 g/t Au from 33 m (G0005) including 5 m @ 1.28 g/t Au

o 20 m @ 0.406 g/t Au from 32 m (G0016)

o 24 m @ 0.390 g/t Au from 76 m (G0018)

• These standout gold targets are ready for immediate infill AC and deeper RC drill testing.

Note: While certain aspects of Becher mineralisation seem analogous to that at the Mallina Gold Project as

disclosed by De Grey 1, Mallina Gold Project mineralisation is not necessarily representative of mineralisation

throughout the Becher Area or the Egina Gold Camp.

Mike Spreadborough, Novo’s Executive Co -Chairman, Acting Chief Executive Officer and a director, said,

“These are very promising developments for Becher. We now have a series of high priority targets that will be

the focus of an immediate aggressive drilling campaign. The initial similarities between the geochemistry and

intrusion type to De Grey’s Mallina Gold Project may be extremely promising for our future exploration success

in identifying a standalone gold project. Completion of the detailed and systematic AC drilling program and

follow-up drilling should put us in the best possible position for a potential discovery.”

1 De Grey has reported that its Mallina Gold Project is comprised of Measured Mineral Resources of 4.7 Mt @ 1.7 g/t Au for 265 koz Au, Indicated Mineral Resources of 153.4 Mt @ 1.3 g/t Au for 6,590

koz Au, and Inferred Mineral Resources of 92.6 Mt @ 1.3 g/t Au for 3,779 koz Au, as those categories are defined in the JORC Code (as defined in National Instrument 43-101 Standards of Disclosure for

Mineral Projects). Refer to De Grey’s public disclosure record for further details. No assurance can be given that a similar or any mineral resource estimate will be determined at Novo’s Becher Project or

the Egina Gold Camp.

2 Refer to the Company’s news releases dated February 14, 2023.

{02831947;1}

VANCOUVER, BC - Novo Resources Corp. (“Novo” or the “Company”) (TSX: NVO , NVO.WT & NVO.WT.A)

(OTCQX: NSRPF) is pleased to provide a further update on the successful 2022 drilling program at the

Company’s flagship Becher Project within the Egina Gold Camp, located within Novo’s 10,500 sq km Pilbara

exploration portfolio (Figures 1 and 2). Based on recent analysis of 2022 exploration results, the Egina Gold

Camp is one of Novo’s most exciting exploration area s and includes the highly prospective Becher and

Nunyerry North Projects.

Results referred to in this news release , including mineralisation present at De Grey’s Mallina Gold Project 1,

are not necessarily representative of mineralisation throughout the Becher Project or the Egina Gold Camp.

OVERVIEW OF BECHER AREA

The Becher Project (northern E47/3673, 100%-owned by Novo) is located ~28 km to the west -southwest of

De Grey Mining Limited’s (" De Grey ”) Mallina Gold Project along an interpreted gold fertile corridor and

contains multiple high-priority, orogenic gold targets under shallow cover (Figure 2).

Figure 1: Novo’s Pilbara tenure, showing location of > 80 km strike extent Egina Gold Camp.

(remainder of page left intentionally blank)

{02831947;1}

Figure 2: Becher target area showing priority prospects and the position of the De Grey Mallina Gold Project (including Hemi and

Withnell)1 to the east-northeast along the interpreted fertile corridor.

NEW RESULTS RECENTLY RETURNED FROM 2022 DRILLING PROGRAM

All results from systematic broad-spaced AC drilling completed in 2022 within the Becher Area have now been

returned. Additional gold prospectivity has been identified in two AC lines in the southern portion of the

project area testing the Bonatti Shear Corridor (Figure 3).

Refer to Table 1 below for a list of assay results2. True widths from AC drilling cannot be estimated at this time.

Best results from Bonatti prospect include:

• 4 m @ 0.99 g/t Au from 17m (F1393)

• 5 m @ 0.49 g/t Au from 8m (F1242)

• 4 m @ 0.10 g/t Au from 4m (F1260)

• 4 m @ 0.10 g/t Au from 4m (F1194)

These intercepts are in addition to previous standout results, including peak AC drilling results of2:

• Irvine prospect:

▪ 8 m @ 2.15 g/t Au from 8 m (F0632)

▪ 23 m @ 0.56 g/t Au from 0 m (A0034)

▪ 2 m @ 0.91 g/t Au from 66 m (A003)

• Whillans prospect:

▪ 8 m @ 0.20 g/t Au from 16 m (F0519)

▪ 4 m @ 0.37 g/t Au from 20 m (F1136)

• Heckmair prospect:

▪ 4 m @ 0.40 g/t Au from 12 m (F0738)

▪ 3 m @ 0.44 g/t Au from 20 m (F0858)

{02831947;1}

Peak RC drilling results include2:

• 33 m @ 0.493 g/t Au from 33 m (G0005) including 5 m @ 1.28 g/t Au

• 20 m @ 0.406 g/t Au from 32 m (G0016)

• 24 m @ 0.390 g/t Au from 76 m (G0018)

Figure 3: Becher target area showing well defined targets (in yellow) generated from gold results > 0.1 g/t, multielement analysis of

pathfinder geochemistry and lithogeochemistry and visual logging during AC drilling.

Multi-element geochemical analyses from the end -of-hole samples taken during the 2022 AC program have

identified a number of hornblende diorite intrusions. The chemistry of these rocks indicates that they belong

to a magmatic suite known as ‘sanukitoids’. Critically, sanukitoid intrusions are commonly associated with gold

deposits (e.g. Towerana), a well-known association in the Mallina Basin. As well as containing anomalous gold,

they are also associated with anomalous levels of arsenic and tungsten, which are key pathfinder associations

for gold deposits in this region. The arsenic and tungsten are not confined to the intrusions , but rather the

distribution of these elements also maps potentially mineralized shear zones that wrap around the sanukitoid

intrusions (e.g. Withnell).

(remainder of page left intentionally blank)

{02831947;1}

Figure 4: Becher target area showing rock types interpreted from multielement analysis of end-of-hole samples in AC drilling over 1VD

high resolution aeromagnetics.

2023 PROGRAM PLANNING

Results from the recent AC drilling have clearly delineated targets including both structurally controlled

orogenic gold and intrusion-hosted gold which appear similar to the Mallina Gold Project. All data generated

to date is currently being integrated to best design follow up AC and RC programs for Q2 2023.

(remainder of page left intentionally blank)

{02831947;1}

Figure 5: Target map with best AC drill intercepts annotated >0.1 g/t Au, targets derived from AC, Au and multielement assay

(yellow), AC (black) and RC (green) drilling to date over SRTM image and structural interpretation.

ANALYTIC METHODOLOGY

Four-metre composite samples of AC chips were sent to Intertek Genalysis (“Intertek”) in Perth, Western

Australia with the entire sample smart crushed to -3mm (NVO02 prep code), with a 500 g split sample analysed

for gold using PhotonAssay (PHXR/AU01). An additional bottom hole sample from each drill hole (1 to 4 m

composite representing rock from the bottom of the drill hole) was assayed using four acid digest and 50 g

charge fire assay FA50/OE and for 48 multielement using four acid diges t – MS finish (4A/MS). AC drill holes

with anomalous gold or base metals have been split through a single tier riffle splitter and are assayed using

four acid digest and 50 g charge fire assay FA50/OE and for 48 multielement using four acid digest – MS finish

(4A/MS).

QAQC procedures for the latter half of the program include insertion of a certified blank approximately every

25 samples (4 per hundred) , a certified standard approximately every 50 samples (2 per 100) and duplicate

sampling (split of 4m composite) at the rate of 4 per hundred. Intertek insert s customized Chrysos certified

standards at the rate of 2 per hundred.

There were no limitations to the verification process and all relevant data was verified by a qualified person

as defined in National Instrument 43 -101 Standards of Disclosure for Mineral Projects (“NI 43 -101”) by

reviewing analytical procedures undertaken by Intertek.

{02831947;1}

QP STATEMENT

Mr. Iain Groves (MAIG), is the qualified person, as defined under NI 43 -101, responsible for, and having

reviewed and approved, the technical information contained in this news release other than information

concerning De Grey’s Mallina Gold Project. Mr. Groves is Novo’s Exploration Manger – West Pilbara.

ABOUT NOVO

Novo explores and develops its prospective land package covering approximately 10,500 square kilometres in

the Pilbara region of Western Australia, including the Beatons Creek gold project, along with two joint ventures

in the Bendigo region of Victoria, Australia. In addition to the Company’s primary focus, Novo seeks to leverage

its inte rnal geological expertise to deliver value -accretive opportunities to its stakeholders. For more

information, please contact Leo Karabelas at (416) 543-3120 or e-mail [email protected].

On Behalf of the Board of Directors,

Novo Resources Corp.

“Michael Spreadborough”

Michael Spreadborough

Executive Co-Chairman and Acting CEO

Forward-looking information

Some statements in this news release contain forward -looking information (within the meaning of Canadian

securities legislation) including, without limitation, that the Becher Project is Novo’s primary focus for its next

aggressive drilling program, and that AC drilling will also continue on the regional program (640 m lines)

focused on EN E trending gold -fertile structural corridors commenced in 2022 . These statements address

future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors

which may cause the actual results, performance or achievements to be materially different from any future

results, performance or achievements expressed or implied by the statements. Such factors include, without

limitation, customary risks of the resource industry and the risk factors identified in Novo’s management’s

discussion and analysis for the nine-month period ended September 30, 2022, which is available under Novo’s

profile on SEDAR at www.sedar.com. Forward-looking statements speak only as of the date those statements

are made. Except as required by applicable law, Novo assumes no obligation to update or to publicly announce

the results of any change to any forward-looking statement contained or incorporated by reference herein to

reflect actual results, future events or developments, changes in assum ptions or changes in other factors

affecting the forward -looking statements. If Novo updates any forward -looking statement(s), no inference

should be drawn that the Company will make additional updates with respect to those or other forward -

looking statements.

{02831947;1}

Table 1: Becher Area – New AC Drilling Intercepts >0.1 g/t Au2

Hole ID

Depth

From

(m)

Depth

To

(m)

Width

(m)

Au

(g/t) Assay Technique

F1194 4 8 4 0.1 PhotonAssay

F1242 8 13 5 0.49 PhotonAssay

F1242 9 13 4 0.32 Fire assay

F1260 4 8 4 0.1 PhotonAssay

F1393 16 21 5 0.29 PhotonAssay

F1393 17 21 4 0.99 Fire assay