Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NVO.TO ·

Follow-Up Drilling to Commence at Nunyerry North and New Targets Defined Near Karratha

Exploration Programs

Follow-Up Drilling to Commence at Nunyerry North and New Targets Defined

Near Karratha

HIGHLIGHTS

Nunyerry North

• At Nunyerry North, a ~4,000 m RC drill program is to commence next week following significant results from the

maiden drill program. The program will test multiple new targets along strike of known mineralisation and down plunge

of existing intercepts.

• Significant intercepts from the maiden RC program at Nunyerry North1 included:

◦ 6 m @ 6.12 g/t Au from 37 m (NC017)

◦ 11 m @ 2.52 g/t Au from 22 m, including 6 m at 4.19 g/t Au from 22 m (NC014)

◦ 13 m @ 1.89 g/t Au from surface (NC004)

◦ 4 m @ 5.71 g/t Au from 40 m (NC015)

◦ 17 m @ 1.34 g/t Au from 37 m, including 4 m at 3.77 g/t Au from 50 m (NC022)

◦ 14 m at 1.14 g/t Au from 39 m, including 4 m at 2.16 g/t Au from 41 m (NC006)

• The upcoming Nunyerry North drilling program successfully qualified for the Western Australian State Government

Exploration Incentive Scheme (EIS), awarding up to A$180,000 towards direct drilling costs for the campaign. The

EIS is an initiative aimed to encourage exploration in Western Australia for the long-term sustainability of the State’s

resources sector.

Becher (Egina JV)

• Egina Earn-in/Joint Venture partner De Grey Mining is scheduled to commence aircore and RC drilling programs in Q2

2024. Programs will include aircore drilling for target generation and RC drilling for follow-up target testing at Heckmair,

Irvine and Lowe .

Karratha District

• Recent exploration in the Karratha district has advanced several drill targets, including North Whundo, Railway Bore

and East Well.

• Primary target North Whundo is defined by a significant 1.2 km long Cu-Pd-Au anomaly, with highly anomalous rock

chip results including peak values of 4.1 g/t Au+Pt+Pd and

3.9 % Cu.

• At Railway Bore , rock chip results include 9.6 g/t Au, 11.9% Cu and 26 g/t Ag from malachite rich breccia in a

swarm of felsic intrusion-hosted quartz veins.

• At East Well, a 450 m long copper pXRF soil anomaly > 200 ppm Cu delineates the intersection of a high-grade quartz

vein trend and a Au-PGE-Cu breccia trend.

• A maiden RC drilling program is planned to test these three prospects for Au and Au-Cu (+/-Pt and Pd)

mineralisation in early Q3 2024 , after completing priority Nunyerry North drilling.

_______________

1 Refer to the Company's news release dated 27 March 2024

VANCOUVER, British Columbia, May 01, 2024 -- Novo Resources Corp. (Novo or the Company) (ASX: NVO) (TSX: NVO &

NVO.WT.A) (OTCQX: NSRPF) is pleased to announce that a ~4,000 m RC drill program at Nunyerry North, which is located

in the southern Egina Gold Camp (EGC), will commence next week following completion of heritage clearance and earthworks.

The follow-up drill program will test significant gold targets generated during the maiden drill program in 2023.

In addition, a maiden RC drill program is planned to test three significant gold and gold-copper(+-platinum-palladium) targets in

the Karratha District, which were defined by a combination of mapping, surface geochemistry and historic geophysics (IP

chargeability) with programs to be completed at North Whundo, Railway Bore and East Well . This ~3,500 m program is

scheduled to start immediately after completion of the Nunyerry North drilling program.

Also in the Egina Gold Camp, Earn-in and JV partner De Grey Mining ( De Grey) is scheduled to commence aircore ( AC) and

RC programs in Q2 2024. AC drilling will be completed for target generation, and RC drilling completed for follow-up target

testing at Heckmair, Irvine and Lowe .

Figure 1: Novo tenure showing priority project areas in the Egina Gold Camp and Karratha District

Nunyerry North (70% Novo / 30% Creasy Group)

The Nunyerry North prospect lies in the southern EGC, located ~150 km from Port Hedland. The prospect is located along the

southern extent of the Tabba Tabba Shear, a deep tapping gold-fertile structural corridor, where Novo has focussed exploration

over the last eighteen months.

Novo completed a maiden RC drilling program of 30 holes for 2,424 m at Nunyerry North in Q4 2023, generating significant

gold intercepts in quartz vein arrays (some of which are blind at surface) hosted in a particular basalt unit.

Significant intercepts from RC drilling at Nunyerry North1 include:

• 6 m @ 6.12 g/t Au from 37 m (NC017)

• 11 m @ 2.52 g/t Au from 22 m, including 6 m at 4.19 g/t Au from 22 m (NC014)

• 13 m @ 1.89 g/t Au from surface (NC004)

• 4 m @ 5.71 g/t Au from 40 m (NC015)

• 17 m @ 1.34 g/t Au from 37 m, including 4 m at 3.77 g/t Au from 50 m (NC022)

• 14 m at 1.14 g/t Au from 39 m, including 4 m at 2.16 g/t Au from 41 m (NC006)

Figure 2: Nunyerry North geological interpretation, 2023 drill hole locations and drill target areas.

A program of ~4,000 m follow-up RC drilling is scheduled to commence next week at Nunyerry North, testing strike extensions

of known mineralisation where high-grade surface gold in soil anomalism is present; down plunge of existing intercepts; and for

repeat lodes at depth.

The upcoming Nunyerry North drilling program successfully qualified for the Exploration Incentive Scheme (EIS), awarding up

to A$180,000 towards the drilling campaign.

The EIS is a Western Australian State Government initiative that aims to encourage exploration in Western Australia by co-

funding 50% of direct drilling costs. The qualification process is highly competitive and only selected projects that meet

eligibility criteria are accepted for participation. The EIS funding is designed to address significant knowledge gaps and critical

uncertainties in an underexplored area.

The Nunyerry North program comprises deep and early diamond holes to be drilled from June 2024 to fast-track development

of the prospect.

Egina Earn-in/JV (De Grey earning 50% interest)

The Egina Earn-in and JV is located in the northwest of the EGC. De Grey plan to commence exploration field programs in Q2

2024, which will include: a high-resolution aeromagnetic survey over the Becher and Heckmair area ; ground gravity surveys

in select areas; AC drilling planned for target generation; and RC drilling for follow-up target testing at Heckmair, Irvine and

Lowe.

Field-based exploration activities will progress subject to access to the Yandeyarra Reserve, cultural heritage surveys and

permitting.

Karratha District

Recent exploration in the Karratha District has advanced several drill targets, including North Whundo, Railway Bore and

East Well.

A maiden RC drilling program is planned to test these three high-priority prospects for Au and Au-Cu (+-Pt and Pd)

mineralisation immediately after completing the Nunyerry North drilling.

Figure 3: Karratha District showing Novo tenure and significant prospects

North Whundo (Cu-Au-PGE target)

North Whundo is an outstanding target, delineated by a significant 1.2 km long Cu-Pd-Au anomaly, with highly anomalous

rock chip results including peak values of 4.1 g/t Au+Pt+Pd and 3.9 % Cu (Appendix 1).        

North Whundo was defined by Westfield Minerals in the early 1970s as prospective for Cu-Ni, near the contact of a large

structurally complex, layered mafic/ultramafic intrusive complex. Westfields conducted mapping, drilling, and induced

polarization surveys ( IP) and defined three targets 2, but did not analyse for Au, Pt or Pb. Results and technical information

from Westfield Minerals are historical and do not meet current reporting requirements. Information was disclosed in annual

exploration reports filed by Westfield Minerals on the Western Australian Department of Energy, Mines, Industry Regulation

and Safety’s (“DEMIRS”) website in 2004 and utilised to assist exploration targeting.

Novo conducted 80 m x 40 m spaced soil sampling in 2023, returning a very high order 1.2 km long high-order Cu-Pd-Au-(Pt)

soil anomaly at >550 ppm Cu and 30 ppb Pd. Peak soil values include 1,233 ppm Cu, 125 ppb Pd, 536 ppb Pt and 66 ppb Au.

The linear anomaly trends northwest, parallel to the margins of the mafic/ultramafic intrusion with a secondary 1 km long

anomaly of the same magnitude trending east-west (Figure 4).

Rock chip sampling by Novo also returned highly anomalous results over 1 km strike including peak values of 4.1 g/t

Au+Pt+Pd and 3.9% Cu, and up to 0.74 g/t Au and 3.32 g/t Pd. Mineralisation includes disseminated and stringer forms in

moderate south dipping zones, truncated by a swarm of NW trending faults. The target style is interpreted to be structurally

modified magmatic Cu-Au-Pd.

Results listed for North Whundo are not necessarily representative of mineralisation across the district.  

Figure 4: Karratha district prospects and Cu surface geochemistry over 1XD magnetic data.

_______________

2 Refer to Westfield Minerals N.L 1972 Annual Report Mt Roe – North Whundo M.C.’s – WAMEX Open File Data Report

A3348.

Railway Bore & East Well

The Railway Bore Cu-Au target is an E-W trending complex array of malachite-bearing brecciated quartz veins and sericite-

silica-sulphide altered suite of porphyritic felsic intrusions. The target strikes over 300 m and is open under regolith along

strike. Peak rock chip results include 9.6 g/t Au, 11.9% Cu and 26 g/t Ag (Appendix 1).

The East Well Cu-Au-Pd target is a 60 m wide > 200 ppm Cu in soil anomaly (pXRF) trending over a strike of 450 m and with

a peak pXRF soil result of 1,750 ppm Cu. Anomalous Cu-Au (+/- Pt-Pd) mineralisation is associated with an E-W shear along

the contact of a mafic intrusive suite and basement felsic volcanics. Mineralisation includes malachite-bearing, brecciated and

silica-altered gabbro with quartz-carbonate stockwork veining. Rock chip sampling returned peak values including 1.3 g/t Au,

214 ppb Pd, 46 ppb Pt and 0.6% Cu (Appendix 1).

Railway Bore lies immediately southwest of a swarm of narrow high-grade gold quartz veins with peak rock sample values of

133.2 g/t Au and anomalous Cu and Bi. These veins trend over ~5 km strike towards East Well, where they manifest as a

single narrow high-grade vein and return values up to 73.9 g/t Au. The strong gold results and geochemical associations along

this ~ 5 km trend suggests the presence of a larger, potentially intrusion related system.

The above results at Railway Bore and East Well are not necessarily representative of mineralisation across the district.

Forward Exploration Program

The ~4,000 m RC follow-up drilling at Nunyerry North is scheduled to commence next week.

Novo’s maiden RC drilling program at the North Whundo, Railway Bore and East Well prospects is scheduled to start in Q2

2024 and will total ~3,500 m to test Au and Au-Cu (+/- Pt-Pd) targets defined by a combination of mapping, surface

geochemistry and historic geophysics (IP chargeability and anomalies).

De Grey Mining is scheduled to commence drilling programs in Q2 2024, which includes AC drilling for target generation and

RC drilling for follow-up target testing at Heckmair, Irvine and Lowe.

ANALYTIC METHODOLOGY

Rock chip samples of 1 – 3 kg were submitted to Intertek commercial Genalysis (“ Intertek”) in Perth, Western Australia

where they were dried and crushed to -3 mm and pulverized to 75 µm or better (prep code SP64), with a > 85% pass, then

assayed for Au by 50 g charge fire assay FA50/OE and for 48 elements using four acid digest – MS finish (4A/MS). Selected

samples were assayed for Pt and Pd in addition to Au using 50 g charge fire assay FA50/OE. Elements that reported above

the upper detection limit for 4A/MS were reanalysed using method 4AH/OE.

A minimum of 2 CRM standards relevant for the style of mineralisation and 2 blanks were submitted per 100 samples.

Soil samples were sieved to < 80 mesh and submitted to Intertek for aqua regia to analyse for 33 elements. Selected samples

were assayed using 25 g charge fire assay FA25/MS for Au, Pt and Pd.

A minimum of 2 CRM standards, 2 blanks and 4 field duplicates were submitted per 100 samples.

pXRF readings of soils and rock chips were taken using a NITON XLT5 model and were used to aid field interpretation and

identification of anomalous target mineralogy and pathfinder elements. The Niton pXRF machine was calibrated daily and

checked against reference material four times per 100 samples and at the start and end of each day.

There were no limitations to the verification process and all relevant data was verified by a qualified person/competent person

(as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects (NI 43-101) and the Australasian Code

for Reporting of Exploration Results, Mineral Resources and Ore Reserves ( JORC Code , Appendix 2) respectively) by

reviewing QAQC performance of inserted reference material and the analytical procedures undertaken by Intertek.

ABOUT NOVO

Novo explores and develops its prospective land package covering approximately 7,000 square kilometres in the Pilbara region

of Western Australia, along with the 22 square kilometre Belltopper project in the Bendigo Tectonic Zone of Victoria, Australia.

In addition to the Company’s primary focus, Novo seeks to leverage its internal geological expertise to deliver value-accretive

opportunities to its shareholders.

Authorised for release by the Board of Directors.

CONTACT

Investors:

Mike Spreadborough

+61 8 6400 6100

[email protected]

North American Queries:

Leo Karabelas

+1 416 543 3120

[email protected]

Media:

Cameron Gilenko

+61 466 984 953

[email protected]

QP STATEMENT

Ms De Luca (MAIG), is the qualified person, as defined under National Instrument 43-101 Standards of Disclosure for Mineral

Projects, responsible for, and having reviewed and approved, the technical information contained in this news release. Mrs De

Luca is Novo’s General Manger Exploration.

JORC COMPLIANCE STATEMENT

The information in this report that relates to rock chip sample results at the Karratha District (North Whundo, Railway Bore and

East Well) is based on information reviewed and approved by Ms De Luca, who is a full-time employee of Novo Resources

Corp. Ms De Luca is a Competent Person who is a member of the Australian Institute of Geoscientists. Ms De Luca has

sufficient experience that is relevant to the style of mineralisation and the type of deposits under consideration and to the

activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for

Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Ms De Luca consents to the inclusion in the report of

the matters based on her information in the form and context in which it appears.

The information in this news release that relates to previously reported exploration results at Nunyerry North is extracted from

Novo's announcement titled upgraded Nunyerry North drill results deliver high-grade intercepts up to 6.12 g/t Au released to

ASX on 27 March 2024 and which is available to view at www.asx.com.au. The Company confirms that the form and context in

which the Competent Person’s findings are presented have not been materially modified from the original market

announcement.

FORWARD-LOOKING STATEMENTS

Some statements in this news release may contain “forward-looking statements” within the meaning of Canadian and

Australian securities law and regulations. In this news release, such statements include but are not limited to planned

exploration activities and the timing of such. These statements address future events and conditions and, as such, involve

known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements

to be materially different from any future results, performance or achievements expressed or implied by the statements. Such

factors include, without limitation, customary risks of the resource industry and the risk factors identified in Novo’s annual

information form for the year ended December 31, 2023 which is available under Novo’s profile on SEDAR+ at

www.sedarplus.ca and in the Company’s prospectus dated 2 August 2023 which is available at www.asx.com.au. Forward-

looking statements speak only as of the date those statements are made. Except as required by applicable law, Novo

assumes no obligation to update or to publicly announce the results of any change to any forward-looking statement contained

or incorporated by reference herein to reflect actual results, future events or developments, changes in assumptions or

changes in other factors affecting the forward-looking statements. If Novo updates any forward-looking statement(s), no

inference should be drawn that the Company will make additional updates with respect to those or other forward-looking

statements.

APPENDIX

Appendix 1 – Rock sample results for the Karratha District

(All sample locations are GPS located on MGA_2020 zone 50.)

Sample ID Type Prospect Au

(ppm)

Cu

(ppm) Pd (ppb) Pt (ppb) Easting GDA94 Z50 Northing GDA94 Z50

A008961 Rock Chip North Whundo 0.411 21875 1377.2 76.6 495,386 7,678,094

A008962 Rock Chip North Whundo 0.013 778 78.7 8.8 495,579 7,678,034

A008963 Rock Chip North Whundo 0.049 659.2 74.1 8 495,569 7,678,043

A008964 Rock Chip North Whundo 0.002 404 22.1 2.9 495,605 7,678,024

A008966 Rock Chip North Whundo 0.099 10915.8 470.9 76.5 495,237 7,678,176

A008967 Rock Chip North Whundo 0.19 17268.4 997 301.6 495,265 7,678,164

A008968 Rock Chip North Whundo 0.04 3985.4 461.6 66.4 495,335 7,678,161

A008969 Rock Chip North Whundo 0.53 38757 3322.2 276.8 495,376 7,678,085

A008970 Rock Chip North Whundo 0.104 14979.3 598.8 114.1 495,163 7,678,265

A008971 Rock Chip North Whundo 0.092 6591.4 864 88.9 495,174 7,678,246

A008972 Rock Chip North Whundo 0.062 6812.6 478.4 81.3 495,222 7,678,200

A008973 Rock Chip North Whundo 0.088 7349.5 465.3 46.4 495,557 7,677,942

A008974 Rock Chip North Whundo 0.078 11403.6 1045.1 109 495,895 7,677,772

A008975 Rock Chip North Whundo 0.013 2629.2 263.9 53.9 495,967 7,677,731

A008976 Rock Chip North Whundo 0.07 8152.6 448.9 66.8 495,956 7,677,748

NVO-9251 Rock Chip North Whundo 0.173 12995.7 709.6 167.7 495,854 7,677,837

W19896 Rock Chip North Whundo 0.051 4296.7 254.4 33.1 495,482 7,677,984

W19897 Rock Chip North Whundo 0.745 15508.5 1321.2 125.8 495,343 7,678,137

W19898 Rock Chip North Whundo 0.211 11003.6 687.7 126.3 495,303 7,678,071

W19899 Rock Chip North Whundo 0.114 5701.1 386.5 69.6 495,471 7,678,000

NVO-01520 Rock Chip Railway Bore 0.861 20000* not assayed 496,157 7,672,083

NVO-01521 Rock Chip Railway Bore 0.116 538.1 not assayed 496,325 7,672,117

NVO-01522 Rock Chip Railway Bore 133.22 10417.3 not assayed 496,625 7,672,182

NVO-01523 Rock Chip Railway Bore 2.83 571.5 not assayed 496,668 7,672,333

NVO-01524 Rock Chip Railway Bore 0.07 39.6 not assayed 496,782 7,672,443

NVO-01525 Rock Chip Railway Bore 13.86 72.6 not assayed 495,964 7,672,111

NVO-01526 Rock Chip Railway Bore 0.13 4550.7 not assayed 495,850 7,672,012

NVO-01527 Rock Chip Railway Bore 0.255 12646 not assayed 496,464 7,671,603

NVO-9132 Rock Chip Railway Bore 0.022 30.2 not assayed 496,092 7,671,683

NVO-9137 Rock Chip Railway Bore 0.013 91.5 not assayed 496,190 7,672,383

NVO-9138 Rock Chip Railway Bore 10.173 45.6 not assayed 496,184 7,672,372

NVO-9143 Rock Chip Railway Bore 0.066 3746.1 738.3 275.1 496,085 7,671,544

NVO-9144 Rock Chip Railway Bore 0.01 55.9 6.1 2.7 496,288 7,671,682

NVO-9145 Rock Chip Railway Bore 9.617 65.1 12.9 3.8 496,345 7,671,695

NVO-9146 Rock Chip Railway Bore 0.037 2879.4 2.3 1.5 496,376 7,671,715

NVO-9147 Rock Chip Railway Bore 0.054 795.1 13.8 3.3 496,381 7,671,708

NVO-9148 Rock Chip Railway Bore 0.003 361.3 10.7 5.3 496,373 7,671,701

NVO-9149 Rock Chip Railway Bore 0.012 665.7 147.7 23.9 496,169 7,671,604

NVO-9204 Rock Chip Railway Bore 0.0005 11.9 0.25 0.25 496,075 7,672,527

NVO-9205 Rock Chip Railway Bore 0.006 68.3 1 1.2 496,270 7,672,549

R00321 Rock Chip Railway Bore 0.006 668.1 X X 496,320 7,671,776

R06951 Rock Chip Railway Bore 16.626 161.3 0.25 0.25 496,540 7,672,967

R06952 Rock Chip Railway Bore 8.548 91.9 0.25 0.25 496,514 7,672,939

R06954 Rock Chip Railway Bore 0.045 280.3 0.25 0.25 496,409 7,671,730

R06955 Rock Chip Railway Bore 0.098 457.6 3.9 1.6 496,359 7,671,711

R06956 Rock Chip Railway Bore 0.01 1575.9 8.8 2.9 496,366 7,671,701

R06957 Rock Chip Railway Bore 0.06 18.7 0.25 0.25 496,406 7,671,684

R06959 Rock Chip Railway Bore 0.012 94365 1.7 1.1 496,441 7,671,772

R06960 Rock Chip Railway Bore 0.017 118686 1.7 0.9 496,440 7,671,749

R06961 Rock Chip Railway Bore 0.009 642.4 1.6 1.5 496,377 7,671,786

R06962 Rock Chip Railway Bore 0.201 7284.1 0.5 0.25 496,408 7,671,810

R06964 Rock Chip Railway Bore 0.03 197.7 0.25 0.25 496,521 7,671,826

R06965 Rock Chip Railway Bore 0.013 291.3 0.25 0.25 496,607 7,671,806

R06994 Rock Chip Railway Bore 0.0005 6.2 0.25 0.5 496,028 7,672,509

R06995 Rock Chip Railway Bore 0.0005 4 1 2 496,044 7,672,558

W10966 Rock Chip Railway Bore 1.017 12570 142.8 145.2 496,010 7,671,603

W19958 Rock Chip Railway Bore 0.231 20666 0.5 0.25 496,364 7,671,722

W19959 Rock Chip Railway Bore 0.149 35516 0.25 0.25 496,365 7,671,716

W19960 Rock Chip Railway Bore 0.007 580.2 6 11.3 496,333 7,671,767

W19983 Rock Chip Railway Bore 0.009 7.8 X X 496,141 7,671,716

W19994 Rock Chip Railway Bore 6.462 9281.7 X X 496,158 7,672,233

W19995 Rock Chip Railway Bore 8.147 77.3 X X 496,185 7,672,373

W19996 Rock Chip Railway Bore 5.621 2945.8 X X 496,194 7,671,955

W19997 Rock Chip Railway Bore 7.632 245.8 X X 496,175 7,672,014

18KAR123 Rock Chip East Well 11.214 123.4 not assayed 499,076 7,674,656

18KAR124 Rock Chip East Well 73.923 1415 not assayed 499,048 7,674,614

18KAR125 Rock Chip East Well 6.659 17.2 not assayed 498,912 7,674,556

18KAR126 Rock Chip East Well 0.093 56.3 not assayed 499,016 7,674,626

18KAR127 Rock Chip East Well 0.03 47.2 not assayed 499,019 7,674,615

18KAR128 Rock Chip East Well 0.122 46.8 not assayed 498,985 7,674,590

18KAR129 Rock Chip East Well 0.831 53.7 not assayed 498,986 7,674,587

NVO-9130 Rock Chip East Well 0.051 107.7 not assayed 498,332 7,674,195

NVO-9131 Rock Chip East Well 0.252 4032.8 not assayed 498,369 7,674,220

NVO-9188 Rock Chip East Well 0.005 329.5 4.4 3 498,452 7,674,217

R06966 Rock Chip East Well 11.499 56753 3 X 498,176 7,673,771

R06967 Rock Chip East Well 0.031 3222.7 76 11 498,414 7,674,223

R06968 Rock Chip East Well 0.211 4711.7 86 11 498,655 7,674,325

R06991 Rock Chip East Well 0.096 4913.8 200.2 27.2 498,591 7,674,279

R06992 Rock Chip East Well 0.001 49.4 1.5 0.9 498,612 7,674,279

R06993 Rock Chip East Well 0.003 79.6 3 1.2 498,815 7,674,360

W10054 Rock Chip East Well 0.01 24.6 X X 499,238 7,675,023

W10087 Rock Chip East Well 13.988 703.9 X X 499,354 7,674,998

W10088 Rock Chip East Well 24.954 1101.6 X X 499,339 7,674,992

W10751 Rock Chip East Well 1.325 3724.2 163 32 498,592 7,674,279

W10752 Rock Chip East Well 0.15 6538.7 214 46 498,596 7,674,272

W19998 Rock Chip East Well 5.12 207.1 X X 498,760 7,674,421

* upper detection limit reached and not re-assayed using dilution method 4AH/OE

Appendix 2 - JORC Code, 2012 Edition – Table 1

Section 1: Sampling Techniques and Data

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary

Sampling

techniques

• Nature and quality of sampling (e.g., cut

channels, random chips, or specific specialised

industry standard measurement tools

appropriate to the minerals under investigation,

such as down hole gamma sondes, or handheld

XRF instruments, etc). These examples should

not be taken as limiting the broad meaning of

sampling.

• Include reference to measures taken to ensure

sample representivity and the appropriate

calibration of any measurement tools or

systems used.

• Aspects of the determination of mineralisation

that are Material to the Public Report.

• In cases where ‘industry standard’ work has

been done this would be relatively simple (e.g.,

‘reverse circulation drilling was used to obtain 1

m samples from which 3 kg was pulverised to

produce a 30 g charge for fire assay’). In other

cases, more explanation may be required, such

• Rock chips samples were collected by grab

sampling 1 – 3 kg of material which were

dispatched to Intertek Genalysis, Western

Australia for analysis. Sample sites were

selected based to be representative on the

lithology sampled, and the same sampling

technique was employed at each sample site

where possible.

• Soil samples of 200g were collected from small

pits 2cm – 20 cm depth and sieved to <80#.

Analysis depends on anticipated target

mineralisation and includes aqua regia for all

soils with optional fire assay for Au / Pt / Pd

analysis.

• pXRF readings of soils were taken using a

NITON XLT5 model and were used to aid field

interpretation and identification of anomalous