Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NVO.TO ·

De Grey Reaches A$7M Minimum Spend at Egina Gold Project and Continues Investment

Corporate Updates

De Grey Reaches A$7M Minimum Spend at Egina Gold Project and Continues

Investment

HIGHLIGHTS

• At the Egina Gold Project, De Grey Mining (ASX: DEG) has continued an aggressive exploration program at the Becher

Project, with drilling at Heckmair, Irvine, Lowe and Whillans Prospects. Egina is located southwest of, and in close

proximity to, De Grey’s 12.7 Moz Hemi Gold Project.1

• Novo’s Egina tenements are considered by De Grey and Novo to be highly prospective for significant intrusion-related

gold deposits and share similar attributes to the Hemi deposit.

• In addition to Novo’s approx. 60,000 m AC and RC drilling completed in 2023, De Grey has completed 34,180 m of AC

drilling and 9,129 m of RC drilling to date across the four main prospects, testing prospective intrusions and regional

structures, as well as a drone magnetic survey.

• Anomalous gold results2 during the initial expenditure period include:

• 6m @ 1.2g/t Au in MSRC0068 at Heckmair;

• 4m @ 2.1g/t Au in MSAC0989 at Irvine;

• 8m @ 4.7g/t Au in MSRC0031 at Lowe.3

• De Grey has now satisfied its initial A$7 million minimum expenditure commitment over a 15-month period on

exploration at the Egina Gold Project.

• De Grey now has the right to earn a 50% joint venture interest in the Egina tenements by spending an additional A$18

million through to June 30, 2027, at which time a Joint Venture will be formed with customary funding and dilution rights

applied to both De Grey and Novo.

• The combined Egina Gold Project and De Grey’s tenure forms a strategically significant land position in the Mallina

Basin covering approximately 2,500 sq km.

• Forward programs by De Grey in 2024 will include follow-up targeted RC and diamond drilling.

_________________

1 Refer to De Grey’s ASX Announcement, Hemi Gold Project Resource Update, dated 21 November 2023. No assurance can

be given that a similar (or any) commercially viable mineral deposit will be determined at Novo’s Becher Project.

2 See Appendix: Tables 1 and 2 for detailed assay results and hole locations

3 Refer to Novo’s ASX Announcement, Significant Drill Results at Becher (corrected), dated 14 February 2024.

VANCOUVER, British Columbia, Oct. 09, 2024 -- Novo Resources Corp. (Novo or the Company) (ASX: NVO) (TSX: NVO)

(OTCQX: NSRPF) is pleased to provide a progress update on exploration activities at the Egina Gold Project (Figure 1) with De

Grey Mining Ltd (De Grey) (ASX:DEG).

Novo Executive Co-Chairman and Acting CEO Mike Spreadborough said: “ We are delighted that De Grey shares our

enthusiasm for the Egina Gold Project. We’ve been exploring the Mallina Basin since 2017, attracted by its gold prospectivity.

To be able to partner with a group like De Grey, with its nearby Hemi deposit, provides the best opportunity for us to drive

value for our shareholders at Egina, through any potential new discoveries and future exploration success.”

“Importantly, De Grey is just starting to explore at Egina, with several highly prospective areas yet to be systematically tested,

providing multiple new targets to explore and build upon the platform set by De Grey over the past 12 months.”

“Meanwhile, we remain focussed on progressing our prospects in the Pilbara and Victoria, as well as assessing project

generation opportunities.”

De Grey General Manager Exploration, Phil Tornatora, commented: “The Egina Project is an important part of De Grey’s

strategy to grow a large regional scale resource base around the planned Hemi processing plant. The Egina tenements are

approximately 1,000 sq km and significantly grows the land position De Grey has exposure to around Hemi. Egina contains

major structures and geological units which extend from Hemi and is prospective for both large intrusion-hosted deposits like

Hemi and orogenic gold deposits. Large prospective areas of the Egina Project have not been explored so we believe the area

still has exciting potential.

“During the September quarter, De Grey satisfied its minimum expenditure commitment by spending A$7 million over a 15-

month period. Our intention is to continue to progress exploration on the Egina tenements towards forming a 50:50 joint

venture subject to ongoing assessment of exploration results on the Project.”

Figure 1: Novo Tenure in the Central Pilbara showing the Egina Gold Camp and Balla Balla Gold Project

In June 2023, Novo entered into an earn-in and joint venture agreement with De Grey for the Company’s Becher Project and

adjacent tenements within the Egina Gold Camp (Figure 1), with the resultant joint venture to be known as the Egina JV.

De Grey is earning into the Egina JV and has advised Novo that it has now satisfied the initial minimum expenditure

requirement of A$7 million (required prior to December 2024). This is part of a required A$25 million spend within 4 years to

earn 50% of the joint venture. The combined Egina JV and De Grey tenure forms a strategically significant land position in the

Mallina Basin covering approximately 2,500 sq km.

De Grey assumed management control of the Novo area (under the earn-in arrangements) from 1 July 2023 and rapidly

advanced key exploration efforts through targeted AC and RC drill programs and geophysical surveys.

The Egina JV tenure comprises a large 1,034 sq km tenement package adjacent to De Grey’s existing Hemi Gold Project

(‘Hemi’) and is located immediately south of Withnell and southwest of the Hemi deposits (see Figure 2).

Figure 2 Hemi and Egina Gold Project areas.4

_________________

4 Refer to De Grey’s ASX Announcement, Hemi Gold Project Resource Update, dated 21 November 2023.

Egina Gold Project Prospectivity

Egina contains similar geology and structures to those found within Hemi, in some cases directly along strike from De Grey’s

current exploration areas. Consolidating exploration of the Egina tenements with Hemi is an important step in De Grey’s

strategy to discover and grow a large resource base centred around the future Hemi processing plant.

Previous exploration by De Grey within the existing Farno Joint Venture (De Grey 75% and Novo 25%) and recent drilling at

the neighbouring Becher and surrounding prospects (contained within the Egina Project area) highlight the potential for the

discovery of large scale, intrusion-related gold deposits similar to Hemi, as well as shear-hosted orogenic deposits similar to

the Withnell and Mallina deposits.

The additional tenure in the west of Egina also contains strike extensions of the structural corridor that hosts the Mallina

deposit and opportunities to discover new intrusions similar to Toweranna and Charity Well.

As part of the A$7 million minimum expenditure requirement, De Grey has completed 34,180m of aircore drilling and 9,129 m

of RC drilling in 2024 across four main prospects testing prospective intrusions and regional structures (Figure 3). A drone

aeromagnetic survey was also completed in the Becher area.

Most of the remaining areas throughout Egina have received very little modern systematic exploration, providing scope for new

discoveries.

Figure 3 Egina anomalous gold intercepts and drilling (see Appendix: Tables 1 and 2).

Previous results from De Grey’s work on the Egina Project were provided by De Grey in an ASX release on 13 February 2024

(Greater Hemi and Regional Exploration Update), and by Novo in its ASX release on 14 February 2024 (Significant Drill Results

at Becher corrected), which included a best intercept of 8m @ 4.7 g/t Au from 97 m in MSRC0031 at the Lowe prospect, with

mineralisation associated with a deformed intrusive sill.

Other highlights included a large WNW-trending 1.5km brittle fault zone in the Heckmair intrusion with broad intervals of

anomalous base metals and low-level gold mineralisation. A follow-up RC program comprising 19 holes (2,368 m) returned

strong base metal values including 10 m @ 0.1g/t Au, 29.7 g/t Ag, 0.3% Cu, 1.5% Pb and 1.8% Zn in hole MSRC0016, and

24 m @ 0.2 g/t Au, 13.2 g/t Ag, 0.1% Cu, 1.0% Pb and 0.1% Zn in hole MSRC0017, with individual metres grading up to 4%

Zn and 4% Pb. The best gold intercept was 2m @ 2.8 g/t Au in hole MSRC0013 (See Novo’s ASX release dated 14 February

2024).

Prospect locations in the Becher area are shown in Figure 3, with significant intercepts given in Appendix: Tables 1-3.

Exploration since De Grey’s Greater Hemi and Regional Exploration Update on 13 February 2024 includes AC and RC drilling,

in addition to the drone aeromagnetic survey, which was flown to enable more detailed structural and geological interpretation

of bedrock.

Whillans Prospect

Multiple thin anomalous gold intercepts were returned at the Whillans prospect from drillholes MSRC0074, and MSRC0076,

associated with minor quartz veining and weak sericite alteration of metasedimentary arkosic sandstone and siltstone.

Heckmair Prospect

Multiple thin intercepts were returned at the southern edge of the Heckmair sanukitoid intrusion from drillholes MSRC0012,

MSRC0013, MSRC0068, MSRC0069, including 6 m @ 1.2g/t Au in MSRC0068, Novo ASX release on 14 February 2024

(Significant Drill Results at Becher corrected). All intercepts were associated with minor quartz veining and weak sericite

alteration and hosted within a dioritic intrusion.

Irvine and Heckmair East Prospects

Aircore drilling at Irvine, extending to the eastern side of the Heckmair Intrusion has identified broad zones of Zn-Pb-Ag and

gold anomalism within the weathered horizon. These are adjacent to the previously reported intercepts of base metal

mineralisation within the Heckmair Fault that bisects the Heckmair intrusion (Figures 4 and 5). In the Mallina basin, base

metal anomalies can signal enhanced gold prospectivity. Better gold intercepts include 12 m @ 0.8g/t Au (including 4 m @

2.1g/t Au) in MSAC0989. Gold mineralisation is hosted in quartz veining within metasediments, immediately adjacent to an

intrusion. Anomalous base metal intercepts include 25 m @ 0.99% Zn+Pb (MSAC0962) and 43 m @ 0.53% Zn+Pb

(MSAC0963).

Four metre composite samples with anomalous base and precious metals assays are currently being re-split and will be

submitted for multi-element and fire assay gold analysis, with ongoing interpretation and targeting to follow.

Figure 4 Plan showing anomalous base metal results in AC drilling at Irvine

(see Appendix: Tables 2 and 3)

Figure 5 Section showing anomalous base metal (Zn+Pb) results in AC drilling at Heckmair East (see Appendix: Tables 2 and

3)

Four metre composite samples with anomalous base and precious metals assays are currently being re-split and will be

submitted for multi-element and fire assay analysis, with ongoing interpretation and targeting to follow.

Planned work

De Grey is currently awaiting final assay results including aircore re-splits. Work will continue compiling and analysing results

from recently completed work programs in addition to generating additional targets and developing follow-up programs.

Negotiations with the Mugarinya Community Association are continuing regarding an access agreement to the Yandeyarra

Aboriginal Reserve, which covers some of the Egina tenements. A high-level Aboriginal heritage area avoidance survey was

recently completed on tenements within the Yandeyarra Reserve with results pending. Discussions are also underway with the

Ngarluma Aboriginal Corporation regarding upcoming heritage surveys.

Once these permits and clearances are in place, De Grey will be well-positioned for exploring areas that have previously seen

little to no modern exploration.

On-ground exploration activities will progress from minimum impact, typical early-stage activities including ground gravity

surveys, surficial geochemical surveys, geological mapping including remote sensing methods. De Grey advises that it intends

to then progress to AC drilling for target generation and sub-surface geological mapping. Follow up target testing drilling would

then generally involve follow-up AC, RC and DD drilling.

Key terms of the Egina HOA between De Grey and Novo include:

• De Grey has the right to earn a 50% joint venture interest in the Novo tenements by spending a total of A$25 million

within four years from June 2023 (including the A$7 million already spent);

• De Grey has full program management and sole rights to explore the tenements during the earn-in phase;

• Upon De Grey earning a 50% interest, a joint venture (“Egina JV”) will be formed;

• De Grey will remain the manager of the Egina JV while it holds a minimum 50% interest; and

• Each party will be responsible for funding its share of joint venture costs or have its share of the joint venture subject to

dilution at a rate of 1% per A$1 million of non-expenditure contribution.

ANALYTICAL METHODOLOGY – AC DRILLING

AC drilling is utilised as a first pass technique testing for gold mineralisation and anomalous pathfinder geochemistry in

basement rocks under cover. The drilling methodology is rapid and low cost, with a low impact footprint, enabling large

systematic programs to be completed in a cost effective and timely manner.

One metre AC drill samples are collected from the drill rig through a cyclone and placed on the ground in piles for geological

quantitative and qualitative logging. These piles are then speared as four-meter composites.

All AC chip samples were sent to ALS in Perth, Western Australia and each sample was dried, split, crushed and pulverised

to 85% passing 75 µm. 11 elements assayed with aqua regia mass spectrometry (ALS Lab Code ME-MS43) with an

additional 29 elements assayed with aqua regia ICP-AES finish (ALS Lab Code ME-ICP43), and trace-level gold by 25 g aqua

regia (ICP-MS). All aircore holes end with a 1 m bottom of hole sample using the ME-MS61 method with Au by 30 g fire assay

(Au-ICP21). Anomalous aircore composites, greater than 0.1 ppm gold over 4 m, are re-split to 1 m samples and were

assayed using 30 g Au fire assay with ICP finish (ALS Lab Code, Au-ICP21) and high-grade results >10 ppm Au were assayed

by fire assay and gravimetric finish (ALS Lab Code Au-GRA21). Multielement analysis was conducted using four acid digest

followed by ICP-MS finish for 61 elements (ALS Lab Code ME-MS61™).

QAQC procedures for the program include insertion of certified coarse blanks (minimum rate 2%), certified standards (CRMs

minimum rate 2%), and routine duplicate sampling.

ANALYTICAL METHODOLOGY – RC DRILLING

RC drilling allows for deeper testing of anomalies delineated by aircore drilling, and other geological direct targeting methods

such as surface mapping and sampling, where bedrock is exposed at surface.

RC sampling utilized a cone splitter on the rig cyclone and drill cuttings were sampled on 1m intervals. All RC chip samples

were sent to ALS in Perth, Western Australia and each sample was dried, split, crushed and pulverised to 85% passing 75

µm. All RC drilling samples were assayed using 30 g Au fire assay with ICP finish (ALS Lab Code, Au-ICP21) and high-grade

results >10 ppm Au were assayed by fire assay and gravimetric finish (ALS Lab Code Au-GRA21). Multielement analysis was

conducted using four acid digest followed by ICP-MS finish for 61 elements (ALS Lab Code ME-MS61™).

QAQC procedures for the program include insertion of certified coarse blanks (minimum rate 2%), certified standards (CRMs

minimum rate 2%), and routine duplicate sampling.

There were no limitations to the verification process and all relevant data was verified by a qualified person as defined in

National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) by reviewing analytical procedures

undertaken by ALS.

Authorised for release by the Board of Directors.

CONTACT

Investors:

Mike Spreadborough

+61 8 6400 6100

[email protected]

North American Queries:

Leo Karabelas

+1 416 543 3120

[email protected]

Media:

Cameron Gilenko

+61 466 984 953

[email protected]

QP STATEMENT

Ms. Karen (Kas) De Luca (MAIG), is the qualified person, as defined under National Instrument 43-101 Standards of

Disclosure for Mineral Projects , responsible for, and having reviewed and approved, the technical information contained in this

news release. Ms De Luca is Novo’s General Manager Exploration.

JORC COMPLIANCE STATEMENT

The information in this news release that relates to new exploration results at Novo’s Becher Project is based on information

compiled by Ms De Luca, who is a full-time employee of Novo Resources Corp. Ms De Luca is a Competent Person who is a

member of the Australian Institute of Geoscientists. Ms De Luca has sufficient experience that is relevant to the style of

mineralisation and the type of deposits under consideration and to the activity being undertaken to qualify as a Competent

Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and

Ore Reserves'. Ms De Luca consents to the inclusion in the report of the matters based on her information in the form and

context in which it appears.

The information in this news release that relates to previously reported exploration results at Novo’s Becher Project is

extracted from Novo's announcement titled Significant Drill Results at Becher (corrected) released to ASX on 14 February 2024

which is available to view at www.asx.com.au. The Company confirms that it is not aware of any new information that

materially affects the information included in the original market announcement and that all material assumptions and

technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not

materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented

have not been materially modified from the original market announcement.

FORWARD-LOOKING STATEMENTS

Some statements in this news release may contain “forward-looking statements” within the meaning of Canadian and

Australian securities law and regulations. In this news release, such statements include but are not limited to planned

exploration activities and the timing of such. These statements address future events and conditions and, as such, involve

known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements

to be materially different from any future results, performance or achievements expressed or implied by the statements. Such

factors include, without limitation, customary risks of the resource industry and the risk factors identified in Novo’s annual

information form for the year ended December 31, 2023 (which is available under Novo’s profile on SEDAR+ at

www.sedarplus.ca and at www.asx.com.au) in the Company’s prospectus dated 2 August 2023 which is available at

www.asx.com.au. Statements as to De Grey’s planned exploration activities are based solely on De Grey’s statements to

Novo. Forward-looking statements speak only as of the date those statements are made. Except as required by applicable

law, Novo assumes no obligation to update or to publicly announce the results of any change to any forward-looking statement

contained or incorporated by reference herein to reflect actual results, future events or developments, changes in assumptions

or changes in other factors affecting the forward-looking statements. If Novo updates any forward-looking statement(s), no

inference should be drawn that the Company will make additional updates with respect to those or other forward-looking

statements.

APPENDIX

Table 1: Significant new RC results (>2 gram x m Au) - Intercepts - 0.5 g/t Au lower cut, 4 m maximum internal waste

Hole ID Zone Depth

From

(m)

Depth

To (m)

Down

hole

Width

(m)

Au

(g/t)

Collar

East

(GDA94)

Collar

North

(GDA94)

Collar

RL

(GDA94)

Dip

(deg)

Azi

(GDA94)

Hole

Depth

(m)

Hole

Type

MSRC0068 Heckmair 9 15 6 1.18 619121 7684387 63 -56 181 263 RC

MSRC0068 Heckmair 82 83 1 6.99 619121 7684387 63 -56 181 263 RC

MSRC0069 Heckmair 23 24 1 2.02 619122 7684430 63 -55 180 83 RC

MSRC0069 Heckmair 45 47 2 1.06 619122 7684430 63 -55 180 83 RC

Table 2: Significant new AC results - Intercepts - 0.1g/t Au lower cut, 10m maximum internal waste.

Hole ID Zone Depth

From

Depth

To (m)

Down

hole

Au

(g/t)

Collar

East

Collar

North

Collar

RL

Dip

(deg)

Azimuth

(GDA94)

Hole

Depth

Hole

Type

(m) Width

(m)

(GDA94) (GDA94) (GDA94) (m)

MSAC0429 Whillans

East

21 22 1 0.22 623578 7684615 65 -60 147 65 AC

MSAC0445 Unnamed 12 14 2 0.12 622860 7685711 65 -60 147 51 AC

MSAC0803 Unnamed 52 56 4 0.14 624776 7685706 64 -60 147 72 AC

MSAC0915 Whillans

South

44 45 1 0.10 621258 7685237 63 -60 147 45 AC

MSAC0917 Whillans

South

12 20 8 0.12 621170 7685371 63 -60 147 85 AC

MSAC0917 Whillans

South

56 60 4 0.11 621170 7685371 63 -60 147 85 AC

MSAC0920 Whillans

South

60 64 4 0.14 621038 7685571 62 -60 147 103 AC

MSAC0920 Whillans

South

80 84 4 0.34 621038 7685571 62 -60 147 103 AC

MSAC0920 Whillans

South

100 102 2 0.20 621038 7685571 62 -60 147 103 AC

MSAC0925 Whillans

South

52 54 2 0.31 620963 7685101 61 -60 147 54 AC

MSAC0929 Whillans

South

12 16 4 0.13 620788 7685369 62 -60 147 87 AC

MSAC0931 Whillans

South

28 32 4 0.16 620719 7685482 62 -60 180 75 AC

MSAC0932 Whillans

South

76 84 8 0.28 620719 7685562 63 -60 180 93 AC

MSAC0933 Whillans

South

8 12 4 0.13 620719 7685642 62 -60 180 111 AC

MSAC0938 Heckmair

North

12 16 4 0.19 619759 7685442 59 -60 180 90 AC

MSAC0938 Heckmair

North

20 24 4 0.36 619759 7685442 59 -60 180 90 AC

MSAC0938 Heckmair

North

28 36 8 0.12 619759 7685442 59 -60 180 90 AC

MSAC0961 Heckmair

East

4 8 4 0.14 620490 7684943 63 -55 147 30 AC

MSAC0961 Heckmair

East

28 29 1 0.14 620490 7684943 63 -55 147 30 AC

MSAC0962 Heckmair

East

8 16 8 0.30 620469 7684977 63 -55 147 25 AC

MSAC0963 Heckmair

East

24 28 4 0.24 620447 7685010 63 -55 147 43 AC

MSAC0963 Heckmair

East

32 36 4 0.10 620447 7685010 63 -55 147 43 AC

MSAC0969 Heckmair 16 20 4 0.68 620446 7684433 65 -55 147 54 AC

MSAC0977 Heckmair 24 26 2 0.14 620272 7684702 63 -55 147 27 AC

MSAC0981 Heckmair 4 8 4 0.14 620300 7684233 65 -55 147 66 AC

MSAC0981 Heckmair 16 20 4 0.24 620300 7684233 65 -55 147 66 AC

MSAC0981 Heckmair 65 66 1 0.36 620300 7684233 65 -55 147 66 AC

MSAC0982 Heckmair 4 8 4 0.43 620278 7684267 65 -55 147 81 AC

MSAC0982 Heckmair 36 40 4 0.18 620278 7684267 65 -55 147 81 AC

MSAC0982 Heckmair 72 76 4 0.16 620278 7684267 65 -55 147 81 AC

MSAC0983 Heckmair 0 4 4 0.19 620257 7684300 64 -55 147 40 AC

MSAC0983 Heckmair 8 12 4 0.10 620256 7684300 64 -55 147 40 AC

MSAC0984 Heckmair 8 16 8 0.23 620235 7684334 64 -55 147 25 AC

MSAC0988 Heckmair 8 16 8 0.22 620165 7684147 63 -55 147 41 AC

MSAC0989 Heckmair 8 20 12 0.83 620143 7684180 63 -55 147 69 AC

including   12 16 4 2.12 620143 7684180 63 -55 147 69 AC

MSAC0990 Heckmair 47 48 1 0.21 620121 7684214 63 -55 147 48 AC

MSAC0995 Heckmair 16 20 4 0.12 619955 7684303 62 -55 147 22 AC

Table 3: Significant new AC results - Intercepts - 500 ppm Zn+Pb lower cut.

Hole ID Zone Depth

From

(m)

Depth

To

(m)

Down

hole

Width

(m)

Zn+Pb

(ppm)

Zn+Pb

(%)

Collar

East

(GDA94)

Collar

North

(GDA94)

Collar

RL

(GDA94)

Dip

(deg)

Azimuth

(GDA94)

Hole

Depth

(m)

Hole

Type

MSAC0957 Irvine 47.00 48.00 1 1020 0.10 620578 7684809 64 -55 147 48.00 AC

MSAC0958 Irvine 8.00 12.00 4 2716 0.27 620556 7684843 64 -55 147 54.00 AC

MSAC0958 Irvine 20.00 32.00 12 1414 0.14 620556 7684843 64 -55 147 54.00 AC

MSAC0959 Irvine 4.00 32.00 28 1723 0.17 620534 7684876 63 -55 147 49.00 AC

MSAC0960 Irvine 0.00 24.00 24 1834 0.18 620512 7684910 63 -55 147 36.00 AC

MSAC0960 Irvine 35.00 36.00 1 3605 0.36 620512 7684910 63 -55 147 36.00 AC

MSAC0961 Irvine 12.00 30.00 18 3287 0.33 620490 7684943 63 -55 147 30.00 AC

MSAC0962 Irvine 0.00 25.00 25 9877 0.99 620469 7684977 63 -55 147 25.00 AC

MSAC0963 Irvine 0.00 43.00 43 5277 0.53 620447 7685010 63 -55 147 43.00 AC

MSAC0964 Irvine 0.00 32.00 32 4288 0.43 620425 7685044 63 -55 147 32.00 AC

MSAC0965 Irvine 8.00 17.00 9 1171 0.12 620403 7685077 62 -55 147 17.00 AC

MSAC0966 Irvine 14.00 15.00 1 1012 0.10 620381 7685111 64 -55 147 15.00 AC

JORC Code, 2012 Edition – Table 1

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation Commentary

Sampling

techniques • Nature and quality of sampling (e.g. cut

channels, random chips, or specific specialised

industry standard measurement tools appropriate

to the minerals under investigation, such as down

hole gamma sondes, or handheld XRF

instruments, etc.). These examples should not

be taken as limiting the broad meaning of

sampling.

• Include reference to measures taken to ensure

sample representivity and the appropriate

calibration of any measurement tools or systems

used.

• Aspects of the determination of mineralisation

that are Material to the Public Report.

• In cases where ‘industry standard’ work has been

done this would be relatively simple (e.g. ‘reverse

circulation drilling was used to obtain 1 m

samples from which 3 kg was pulverised to

produce a 30 g charge for fire assay’). In other

cases, more explanation may be required, such

as where there is coarse gold that has inherent

sampling problems. Unusual commodities or

mineralisation types (e.g. submarine nodules)

may warrant disclosure of detailed information.

• All drilling and sampling was undertaken in an

industry standard manner.

• RC holes were sampled on a 1m basis with

samples collected from a cone splitter mounted

on the drill rig cyclone. The 1m samples typically

ranged in weight from 2.5kg to 3.5kg.

• Aircore samples were collected by spear from

1m sample piles and composited over 4m

intervals. Samples for selected holes were

collected on a 1m basis by spear from 1m

sample piles. Sample weights ranges from

around 1kg to 3kg. Aircore results have not been

used in the resource estimate.

• Commercially prepared certified reference

material (“CRM”) and course blank was inserted

at a minimum rate of 2%.

• Field duplicates were selected on a routine basis

to verify the representivity of the sampling

methods.

• Sample preparation is completed at an

independent laboratory where samples are dried,

split, crushed and pulverized prior to analysis as

described below.

• Sample sizes are considered appropriate for the

material sampled.

• The samples are considered representative and

appropriate for this type of drilling. RC samples

are appropriate for use in the Mineral Resource

estimate.

Drilling

techniques • Drill type (e.g. core, reverse circulation, open-

hole hammer, rotary air blast, auger, Bangka,

sonic, etc.) and details (e.g. core diameter, triple

or standard tube, depth of diamond tails, face-

sampling bit or other type, whether core is

oriented and if so, by what method, etc.).

• Reverse Circulation (RC) holes were drilled with a

5 1/2-inch bit and face sampling hammer.

• Aircore holes were drilled with an 83mm diameter

blade bit.