Table 1 – As Notes: 1. True w directio 2. Drill loc In additi o approxim metallurg QUALITY HQ‐size d between town loca facility in
NEWS REL
Trading Sy
NEW PA
Vancouve
(“New Pa
holes at
metallurg
Assay res
those pr e
continuity
g/t silver
Table 1 – As
Notes:
1. True w
directio
2. Drill loc
In additi o
approxim
metallurg
QUALITY
HQ‐size d
between
town loca
facility in
Global in
samples a
Met Hol
DSS4225
DSS5225
DSS5250
DSS6425
LEASE
ymbol: TSX ‐
OTCQ
ACIFIC INTER
SILVER FRO
er, British Col
cific” or the
the Silver Sa
gical work req
ults from the
eviously rel e
y of silver mi
in hole DSS52
ssay results for t
width is estimate
on and mineraliz
cation, azimuth
on , t h e C om
ately 1,500 k
gical testing.
ASSURANCE
rill core samp
one to one a
ated 20 kilom
Betanzos fo
Oruro, Boliv
ar e f i r s t a n a l
eF r o
501T 7
501T 6
021T 6
501T 2
‐V: NUAG
QX: NUPMF
RCEPTS 282.01
OM THE SILV
lumbia – July
“Company”)
and Project.
quired by a Pr
ese metallurg
eased near‐ b
neralization.
25021T.
the metallurgica
ed at 80% of dr
zed structures.
and dip of drill h
mpany has a
kg of drill co
AND QUALIT
ples are split
and a half m
metres from
or future refe
vi a f o r p r e p a
yzed by a m
om (m)
72.64
65.78
6.90
23.28
1 METRES OF
ER SAND PRO
y 13, 2020 – N
is pleased t o
H o l e s w e re
eliminary Eco
gical holes, a
by holes in
Highlight o f
al drill holes at S
rill intercepts ba
holes provided i
also develo p
ore and coars
TY CONTROL
into equal ha
etres at the
the project s
erence, with
ration, and A
ulti‐element
To (m)
143.96
187.70
288.91
128.40
F MINERALIZA
OJECT METAL
New Pacific M
o announce t h
e drilled to o
onomic Asses
s summarize
intervals an d
f the results i
Silver Sand
ased on the cur
n Table 2.
ped a comp
se reject sam
alves by diam
Company’s c
site. Half co
the other ha
ALS Global in
ICP package
Interval (
71
121
282
105
ATION GRAD
LLURGICAL D
Metals Corp. (
he assay res u
obtain repres
ssment (PEA)
d in Table 1
d s i l v e r g r ad
includes 282
rrent understand
posting and
mples from p
mond saw, wit
core processi
ore samples a
alf shipped i
n L i m a , P e r u
( A L S c o d e M
(m) A
.32
.92
.01
.12
DING 104 GRA
RILLING PRO
(TSX‐V: NUAG
ults from th e
sentative sam
study.
below, comp
des and fur t
.01 m interse
di n g o f t h e r e la
sampling p r
previous drill
th an average
n g f a c i l i t y i n
are stored in
n securely se
for geochem
ME‐MS41) wi
g (g/t)
149
180
104
152
AMS PER TON
GRAM
G) (OTCQX: NU
e four in‐fill d
mp l e s f o r d e
pare favoura
ther demon s
ection gradin
ationship betwee
rogram to c
ing campaign
e sample leng
Betanzos, a
n a s e c u r e s t
ealed bags to
mical analysis
it h o r e g r a de
NNE
UPMF)
drilling
etailed
bly to
strate
g 104
en drill
collect
ns for
gth of
small
orage
o A L S
s. A l l
e o v e r
2
limits for silver, lead and zinc further analyzed using ALS code OG46. Further silver over limits are
analyzed by gravimetric analysis (ALS code of GRA21).
A standard quality assurance and quality control (“QAQC”) proto col is employed to monitor the quality
of sample preparation and analys is. Standards of certified ref erence materials and blanks are inserted
i n t o t h e n o r m a l c o r e s a m p l e s e q u e n c e s p r i o r t o s h i p p i n g t o t h e l a b a t a r a t i o o f 2 0 : 1 ( i . e . , e v e r y 2 0
samples contain at least one standard sample and one blank samp le). In general, duplicate samples of
coarse rejects at a ratio of 20:1 are sent to a second internati o n a l l y a c c r e d i t e d l a b f o r c h e c k a n a l y s i s .
The assay results of QAQC samples of standards and blanks do no t show any significant bias of analysis
or contamination during sample preparation.
Technical information contained in this news release has been r eviewed and approved by Alex Zhang, P.
Geo., Vice President of Exploration, who is a Qualified Person for the purposes of NI 43‐101.
About New Pacific
New Pacific is a Canadian exploration and development company w hich owns the Silver Sand Project in
Potosí Department, Bolivia and the Tagish Lake gold project in Yukon, Canada.
For further information, contact:
New Pacific Metals Corp.
Gordon Neal
President
Phone: (604) 633‐1368
Fax: (604) 669‐9387
www.newpacificmetals.com
Neither the TSX Venture Exchange nor its Regulation Services Pr ovider (as that term is defined in the policies of the
TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.
CAUTIONARY NOTE REGARDING FORWARD‐LOOKING INFORMATION
Certain of the statements and information in this news release constitute “forward‐looking information” within the
meaning of applicable Canadian provincial securities laws. Any statements or information that express or involve
discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future
events or performance (often, but not always, using words or ph rases such as “expects”, “is expected”,
“anticipates”, “believes”, “plans”, “projects”, “estimates”, “assumes”, “intends”, “strategies”, “targets”, “goals”,
“forecasts”, “objectives”, “budgets”, “schedules”, “potential” or variations thereof or stating that certain actions,
events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative of any
o f t h e s e t e r m s a n d s i m i l a r e x p r e s s i o n s ) a r e n o t s t a t e m e n t s o f historical fact and may be forward‐looking
statements or information.
Forward‐looking statements or information are subject to a vari ety of known and unknown risks, uncertainties and
other factors that could cause actual events or results to diff e r f r o m t h o s e r e f l e c t e d i n t h e f o r w a r d ‐ l o o k i n g
statements or information, including, without limitation, risks relating to: fluctuating equity prices, bond prices,
commodity prices; calculation of resources, reserves and minera lization, foreign exchange risks, interest rate risk,
foreign investment risk; loss of key personnel; conflicts of interest; dependence on management and others.
3
This list is not exhaustive of the factors that may affect any of the Company’s forward‐looking statements or
information. Forward‐looking statements or information are stat ements about the future and are inherently
uncertain, and actual achievements of the Company or other futu re events or conditions may differ materially from
those reflected in the forward‐looking statements or informatio n due to a variety of risks, uncertainties and other
factors, including, without limitation, those referred to in the Company’s Annual Information Form for the year
ended June 30, 2019 under the heading “Risk Factors”. Although the Company has attempted to identify important
factors that could cause actual results to differ materially, there may be other factors that cause results not to be as
anticipated, estimated, described or intended. Accordingly, readers should not place undue reliance on forward‐
looking statements or information.
The Company’s forward‐looking statements or information are based on the assumptions, beliefs, expectations and
opinions of management as of the date of this news release, and other than as required by applicable securities
laws, the Company does not assume any obligation to update forw ard‐looking statements or information if
circumstances or management’s assumptions, beliefs, expectations or opinions should change, or changes in any
other events affecting such statements or information. For the reasons set forth above, investors should not place
undue reliance on forward‐looking statements or information.
CAUTIONARY NOTE TO US INVESTORS
This news release has been prepared in accordance with the requ irements of NI 43‐101 and the Canadian Institute
of Mining, Metallurgy and Petroleum Definition Standards, which differ from the requirements of U.S. Securities
laws. NI 43‐101 is a rule developed by the Canadian Securities Administrators that establishes standards for all
public disclosure an issuer makes of scientific and technical information concerning mineral projects
Table 2 – Location, azimuth and dip of metallurgical drill holes and the original twinned holes
Note: Coordinate system is WGS84, UTM20 South.
Hole_ID Easting Northing Elevation Length (m) Azimuth (°) Dip (°)
DSS422501T 234816.41 7857102.12 4107.90 151.70 60 ‐45
DSS522501T 234865.91 7856554.70 4079.18 211.70 60 ‐45
DSS525021T 234577.94 7856362.00 4051.04 292.80 50 ‐47
DSS642501T 234817.79 7855836.81 4021.52 142.70 60 ‐45