Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NUAG.TO ·

News release

Corporate Updates

NEWS RE

Trading S

NEW

VANCOU

“Compan

Limited 

acquire a

(the  “Ta

include 

Chenglia

The  Targ

Authoriz

located 

was drill

explorat

Major Te

1) N

f

2) N

i

3) N

C

4) I

N

t

s

t

a

5) I

p

ELEASE 

Symbol: TSX V

W PACIFIC EN

COM

NOT FOR D

UVER,  BRITIS

ny”)  (TSXV:  “

has  signed  a

a 100% inter

rget  Compa

NingdeJungi

ang (0.5% sha

get  Compan

zation)  in  Bo

in  the  Potos

ed during th

ion projects,

erms of the A

New Pacific h

following the

New Pacific s

its 30% inter

New Pacific w

Company wit

If the results

New Pacific s

that it will pr

second paym

the shares of

against the C

If the confirm

proceed, and

Venture: NUX

NTERS INTO 

PANY AND A

DISSEMINAT

SH  COLUMB

“NUX”)  anno

a  binding  sh

rest in Empre

ny”)  from  its

ie  Mineria  C

areholder), a

ny  has  seve

olivia.   The  m

sí  Departmen

he period 20

, which have 

Agreement

has paid US$

e signing of t

shall loan US

est in the ou

will carry out

thin three an

 of the confi

shall notify th

roceed with t

ment of US$3

f the Target C

Closing Paym

mation drill re

d New Pacific

X.V 

AGREEMEN

ANNOUNCES

TION IN THE U

IA  –  April  10

ounces  that

are  purchase

esa Minera A

s  three  shar

Co.,  Ltd.  (99

ll of whom a

n  silver‐poly

most  significa

nt,  which  ha

12 through 2

either been 

$250,000 to t

he Agreeme

S$3.5 million 

utstanding sh

t confirmatio

nd a half mon

rmation drill

he Vendors w

the completi

35,750,000  (t

Company.  In

ent; 

esults are no

c will forfeit i

T TO ACQUIR

S A PRIVATE 

UNITED STAT

0,  2017:  New

its  wholly‐ow

e  agreement

Alcira S.A., a 

reholders  (th

9%  shareho

are arm’s leng

ymetallic  mi

ant  property

s  been  subje

2015 by the 

subject to lim

the Vendors 

nt; 

to one of the

hares of the T

on drilling to 

nths of the si

ing matches 

within 7 days

ion of the Ag

the “Closing 

n this case, th

ot acceptable

its initial US$

RE 100% OF 

PLACEMENT

TES OR TO U

w  Pacific  Ho

wned  subsid

t  (the  “Agre

private Boli

he  “Vendors”

lder),  Cai  X

gth parties. 

neral  prope

y  is  the  Silve

ected  to  som

Target Comp

mited small‐s

as an initial n

e Vendors w

Target Comp

twin three d

igning of the

to 70% of th

s after 3.5 mo

greement and

Payment”) t

he above US$

e to New Pac

$250,000 dow

A PRIVATE B

T OF US$32 M

U.S. NEWSWI

oldings  Corp.

diary  New  Pa

ement”)  dat

vian incorpo

”),  free  of  an

iming,  (0.5%

erties  or  ATE

er  Sand  Prop

me  small‐sca

pany.   The ot

scale mining

non‐refunda

ith a term of

any;   

drill holes dril

 Agreement;

he Target Com

onths of sign

d New Pacific

o the Vendo

$3.5 million 

cific, the tran

wn‐payment

BOLIVIAN MI

MILLION 

IRE SERVICES

.  (“New  Paci

acific  Investm

ted  March  2

orated mining

ny  debt.   Th

%  sharehold

Es  (Tempora

perty  (the  “P

le,  historic  m

ther six are e

 or historical

ble down‐pa

f 120 days, se

lled by the Ta

; 

mpany’s drill

ning this agre

c shall make 

ors to acquire

loan will be o

saction shall

;   

INING 

S 

ific”  or  the 

ment  Corp. 

8,  2017  to 

g company 

he  Vendors 

er)  and  Li 

ary  Special 

Property”), 

mining  and 

early‐stage 

l drilling. 

yment 

ecured by 

arget 

 results, 

eement 

the 

e 100% of 

offset 

 not 

6) Within 90 days after the closing or completion of acquiring the 100% interest of the Target 

Company, New Pacific will make further payments of US$4,000,000; and 

7) A final payment of US$5,000,000 will be due to the Vendors once the Company has received 

certain specified permits and licenses from the authorities of Bolivia necessary for mining and 

milling operations, or once the Target Company has commenced commercial production. 

Closing of the transaction is subject to shareholder approval, regulatory approval, and other conditions 

as set out in the Agreement.  

Silver Sand Property 

Location and history 

At  an  elevation  of  approximately  4,050  meters,  the  Silver  Sand  Property,  having  an  area  of 

approximately  3.17  square  kilometers  (km),  is  located  in  the  Potosí  Department  of  Bolivia, 

approximately 25 km northeast of the world famous Cerro Rico Silver and Base Metal mineral system. 

The Silver Sand property is adjacent to ancient and current tin mining activities in the area.   Access is 

relatively easy with a road distance of 54 km to Potosi, of which 27 km are paved. 

The  Property  is  one  of  the  earliest  discoveries,  before  the  discovery  of  Cerro  Rico  in  the  mid‐1500’s, 

made  by  Spanish  Colonials.   Small‐scale,  historic  mining  is  evident  from  scattered  shafts,  pits,  adit, 

declines and dumps.  The Property has been explored by the Target Company with intermittent surface 

mapping and sampling, underground sampling and surface core drilling; all of which occurred from 2012 

through 2015.  

Historical  mining  activities  appear  to  have  followed  high‐grade  vein  structures.   However,  high‐grade, 

silver  mineralization  also  occurs  as  more  subtle  disseminations,  veinlets  and  stockworks  in  the  host 

sandstones, which were not recognized or mined by historic operators. Currently there are still minor 

active artisanal mining activities by a few local contract miners on the property. 

Geology and Mineralization 

At  Silver  Sand,  the  host  rocks  of  the  silver  mineralization  are  Cretaceous‐aged  quartz‐rich  sandstone, 

which were strongly silicified and now occur in gentle, open folds, dipping shallowly to the north.   The 

Cretaceous rocks unconformably overlie Ordovician‐ and Silurian‐aged rocks, all of which were intruded 

by Tertiary‐aged porphyritic igneous dikes, plugs and sills.  Tin mineralization also occurs on the Property 

and is generally associated with the sills.   

The  silver  mineralized  structures,  occur  in  a  belt  that  extends  in  a  northwesterly  direction,  and  are 

subvertical  to  east‐dipping  at  high  angles.  In  addition  to  silicification,  alteration  of  the  host  rocks 

includes  widespread  oxidation  grading  into  and  strong  iron  oxide  staining  on  structures.   Where  not 

replaced by iron oxide minerals, ore and gangue minerals consist of disseminated and vein/veinlet pyrite 

argentite,  cerargyrite, native silver, and freibergite.  

A total of five mineralized zones (I, II, III,  IV  and V) were defined by surface geological mapping work, 

with  Zone  I  being  the  most  prominent  with  a  mapped  strike  length  of  at  least  1,500  meters  and  a 

horizontal width of up to one hundred meters.  

Historical Exploration 

The  Vendors  had  acquired  the  Target  Company  in  2009  along  with  the  Silver  Sand  Property.  After 

acquisition, the Target Company conducted a limited amount of exploration at the Property during the 

period  2012  through  2015.  This  exploration  included  surface  geological  mapping,  1,628  meters  of 

channel sampling (containing 846 surface and underground channel samples) and drilling of 8 core holes, 

among other work.  The results of the historical Channel Sample are listed in Table 1 below. 

From these channel sample results, five significant mineralization zones (Zone I, II, III, IV, and V) were 

identified  with  the  Zone  I  mineralization  extending  over  1,500  meters  long  and  up  to  125  meters  in 

width.   

Table1: Results of Surface and Underground Channel Samples From Zones I,II, III & V 

Section   Sample 

Location   Zone  Interval (m) 

1. 

Average 

Silver (g/t) 

Number of 

Samples 

Distance from 

Section 76 (m) 2. 

50  Surface  Zone I  62.7 174 31 1,300 

52  Surface  Zone I  71.4 110 35 1,200 

54  Surface  Zone I  112.4 127 59 1,100 

56  Surface  Zone I  105.0 122 54 1,000 

58 

Surface  Zone I  83.0 93 44 900 

Adit ‐ PD19  Zone II  21.4 263 10 900 

60  Surface  Zone I  125.7 120 68 800 

62 

Surface  Zone I  90.7 233 48 700 

Adit ‐ PD62  Zone I  72.1 207 36 700 

Adit ‐ PD62  Zone V  8.0 185 4 700 

64  Surface  Zone I  48.0 124 25 600 

66  Surface  Zone I  71.9 145 38 500 

68  Surface  Zone I  64.7 105 31 400 

70 

Surface  Zone I  33.8 131 18 300 

Surface  Zone II  6.7 141 4 300 

72 

Adit ‐ PD70  Zone I  11.8 163 6 200 

Surface  Zone II  1.5 356 1 200 

Surface  Zone III  16.9 198 9 200 

74 

Surface  Zone I  18.1 105 11 100 

Surface  Zone II  1.2 473 1 100 

76 

Surface  Zone I  14.8 125 12 0 

Surface  Zone II  1.5 535 1 0 

1. Channel samples from adits PD62 and PD19 are believed to be close to the true width 

as they are nearly perpendicular to the zones.  

2. Section 76 is the southern‐most NE‐SW section on the Property to‐date. 

Two  short,  vertical  diamond  drill  holes,  targeting  shallowly‐dipping  tin  mineralization,  were  drilled  in 

2012 but did not intersect silver mineralization.   Two angled holes drilled in the same period but in the 

footwall  (west  side  of  the  zone)  did  not  intercept  the  silver  mineralization.  Four  holes,  totaling  1,558 

meters, were drilled in 2015, consisting of three angled holes from the hanging wall (east side) of the 

Zone I mineralization, which intersected significant silver mineralization and one vertical hole collared in 

footwall of Zone I, which did not intercept silver mineralization.   The results of the three, historic drill 

hole intercepts are listed in Table 2. 

Table 2: Results of the Historical Drill Intersections at Zone I 

Drill 

Hole 

Number 

Cross 

Section 

(NE‐SW) 

Distance 

from 

Section 76 

(m) 

Ave 

Sample 

Length 

(m) 

Mineralized Interval 

From 

(m)  To (m)  Length 

(m) 

Average 

Ag (g/t) 

ZK4601  46  1,500  1.28m  83.3  85.6  2.3  60 

        122.0  277.2  155.2  179 

        Incl.  122.0  145.4  23.4  261 

        Incl.  170.9  231.3  60.4  266 

        Incl.  258.6  277.2  18.6  290 

ZK5401  54  1,100  1.27 m  151.1  346.4  195.3  168 

       Incl.  151.1  177.9  26.8  302 

        Incl.  195.2  249.5  54.3  303 

        Incl.  304.0  321.7  17.7  284 

        Incl.  336.4  346.4  10.0  321 

ZK6601  66  500  1.33 m  51.9  243.2  191.3  246 

       Incl.  51.9  108.1  56.2  329 

        Incl.  132.1  182.6  50.5  316.0 

        Incl.  200.3  243.2  42.9  282.5 

Notes:  g/t = grams per metric tonne. All data from owner.   

  Intervals are drill core length in meters.  True widths are not known but are estimated to 

   be 40 to 55% of the drill widths.

  A 30 g/t Ag minimum grade was used to determine the average silver (Ag) grades. 

  No more than 2 sequential assay values, ≤ 30 g/t, were used in the compilation. 

Zone I – This zone is the most prominent alteration and structural feature on the Property.   Zone I has 

been  traced  on  surface  for  more  than  1,500  meters  in  a  northwesterly  direction.   Its  silicification 

alteration envelope is interpreted to range from about 50 to 125 meters width and its depth extension is 

300  meters  and  open  at  depth.   The  zone  cuts  the  folded  lower,  middle  and  upper  Cretaceous‐aged 

sandstone units and is projected to extend further to northwest, north of the Property, into a block of 

Tertiary‐aged intrusion into a cluster of northwest‐striking structures and artisanal mining. The Zone is 

also believed to extend in the south direction as silver mineralization is exposed by channel sampling in 

the southern most section 76. 

Cross cut PD62, the Dolores Adit, was  developed near the center of Zone I  approximately 200 meters 

below the top of the zone on section 62.  The adit has a total NE to SW length of 173 meters.  Channel 

samples were collected along the ribs of PD62.   Using a 30 Ag g/t cutoff, the length‐weighted average 

grade of silver mineralization is 72.1 meters grading 207 g/t.   Zone V was intersected near the collar of 

the  Dolores  adit.   Channel  sampling  along  the  ribs  yielded  length‐weighted  silver  values  of  8  meters 

grading 182 g/t for Zone V.  

About 200 meters southeast of adit PD62, core hole ZK6601 was drilled on section 66 to a length of 284 

meters.   This  section  is  approximately  500  northwest  of the southern  most  section  76.    Hole  ZK6601 

crossed Zone I yielding a total drill width of 191.3m grading 246 silver g/t starting at a down‐hole depth 

of  51.9  extending  to  243.2  meters.  Within  this  interval,  three  higher‐grade  “subzones”  were  defined.  

Near the collar of hole ZK6601 is an adit (PD25) and a dump outside adit portal.   The owner took one 

grab sample from the dump in 2014, which returned a silver grade of 220 g/t.  During its due diligence, 

NPHC took four grab samples from the dump, which returned silver grades of 296 g/t, 448 g/t, 59 g/t 

and 452 g/t.  

400 meters to the northwest of PD62, core hole ZK5401 was collared on section 54 and extended to drill 

depth of 413 meters and crossing Zone I.   Sampling yielded a total core length of 195.2 meters grading 

168 silver g/t silver starting at 151.1 meters down‐hole, extending to 346.4 meters.  This drill hole length 

included four higher‐grade “subzones”. 

Further to the northwest, approximately 400 meters from ZK5401, core hole ZK4601 was drilled on cross 

section 46 in an area of overburden covering the projected strike of Zone I.   Hole ZK4601 intercepted 

Zone  I  for  a  total  drill  width  of  155.2  m  grading  179  silver  g/t  starting  at  a  drill  depth  of  122  meters, 

extending to 277.2 meters down‐hole.  This interval also included three higher‐grade “subzones”.  

Zone II – This zone is parallel to, and situated 300 meters northeast of, Zone I.  Exposures of Zone II are 

more subtle than those of Zone I.   It has been traced, using sporadic outcrops of silicified, veined and 

oxidized sandstone, over 1,400 meters in NW strike and up to 25 meters in width.   The zone cuts the 

lower,  middle  and  upper  Cretaceous‐aged  sandstone  units.   There  are  no  drill  holes  in  Zone  II  but 

channels have been collected from a small adit and decline (adit PD19) on section 58.   Assays on these 

samples  by  the  owner  yielded  a  total  channel  length  of  21.4  m  with  a  length‐weighted  average  silver 

grade of 263 g/t. It is noted that the first and the last channel samples were taken in mineralization. The 

adit occurs  at  the intersection of the  trend  of  the zone  and a  contact between the middle  and  upper 

sandstone  units.   Examination  of  the  surface  above,  and  to  the  northeast  of,  the  adit  revealed  wide 

spread oxidation, which may suggest the zone is wider than currently estimated. 

Zone III – This zone is situated about 130 meters to the east of Zone II and is parallel to zones I and II.  

The alteration envelope of Zone III has been mapped over approximately 1,000 meters of strike and up 

to 75 meters in width.   Zone III occurs entirely within the lower sandstone.   There are no drill holes in 

Zone III.  Samples were collected on surface from two sections cutting Zone III. They yielded mineralized 

intervals of 15 meters grading 137 silver g/t and 16.9 meters grading 198 silver g/t.  

Zone IV – This zone occurs about 100 meters due west of Zone I, intersecting a circular breccia body on 

the  southeast.   The  zone  is  interpreted  to  be  less  than  10  meters  in  maximum  width  and  dipping 

shallowly and variably from northeast to southwest.  There are no drill holes in Zone IV. 

Zone V – This zone is located about 400 meters north of the collar of core hole ZK6601 and is parallel to 

Zone I.   The strike length of this zone is approximately 25 meters. As mentioned in the description of 

Zone  I,  adit  PD62  interested  Zone  V  near  the  portal.  Sampling  there  cut  a  mineralized  interval  of  8 

meters grading 185 silver g/t.  No drilling has been performed on Zone V. 

Initial Due Diligence 

The  Company  did  its  internal  due  diligence  in  November  2016,  and  a  separate  due  diligence  by  the 

independent Qualified Person in December 2016. The due diligence work includes a thorough reviewing 

of  the  historical  exploration  results,  site  visit  and  examinations  of  mineralized  outcrops  and  artisanal 

mining  sites  as  well  as  quartering  of  the  drill  cores,  taking  numerous  check  samples  from  previous 

channel sampling sites, drill cores and pulp rejects, and finally visiting and observing the procedures of 

the  in‐house  lab  of  the  Target  Company  in  Potosí,  Bolivia,  which  did  sample  preparation  and 

geochemical  analysis  of  all  historical  exploration  samples.  The  check  samples  were  sent  to 

internationally accredited analytical labs (ALS Global in Oruro, Bolivia and in Lima, Peru, and SGS in La 

Paz, Bolivia) for preparation and analysis. The results of the check samples are generally consistent with 

the historical assay results provided by the Target Company. 

Sample Preparation and Assay Results  

The  Target  Company’s  in‐house  lab  applied  its  own  QAQC  procedures  during  sample  preparation  and 

analysis. The procedures are similar to those implemented by internationally accredited analytical labs. 

The results of check samples of New Pacific from ALS and SGS did not show any significant bias. 

During  the  due  diligence  check  sampling  of  New  Pacific  in  November  and  December  2016,  no  field 

certified standard reference materials, blanks and duplicates were inserted into normal sample runs.  

Confirmation Drilling 

As per the terms of the Agreement, the Company will carry out a confirmation drilling program to twin 

the  three  historical  drill  holes  that  intercepted  significant  silver  mineralization.  The  Company  has 

commenced  the  process  of  assembling  a  Bolivian  team,  and  hiring  2  drilling  rigs  to  complete  the 

confirmation  drilling.  This  drill  program  will  be  implemented  by  the  common  standards  of  the  best 

practices of industry to assure the quality of drill results. 

Private Placement of Subscription Receipts 

The  Company  will  raise  up  to  US$32  million  to  fund  the  acquisition,  by  completing  a  non‐brokered 

private  placement  (the  “Private  Placement”)  of  subscription  receipts  (the  “Subscription  Receipts”), 

through  issuing  up  to  40,000,000  Subscription  Receipts  at  a  price  of  US$0.80.   The  proceeds  (the 

“Escrowed Funds”) of the private placement will be placed in escrow following closing to be held by an 

escrow agent.   

The Escrowed Funds will be released to the Company once the confirmation drilling yields satisfactory 

results and New Pacific selects to complete the acquisition of the Target Company.  Upon the release of 

the Escrowed Funds to the Company the subscription receipts will automatically convert into common 

shares of the Company on a one to one basis.    In the event that the confirmation drill results are not 

acceptable to New Pacific, the transaction shall not proceed, the Escrowed Funds will be returned to the 

subscribers and the Subscription Receipts will be cancelled. 

It is anticipated that Silvercorp Metals Inc., a 16% shareholder in the Company, will subscribe for 50% of 

the Private Placement. 

The acquisition of the Target Company by the Company will constitute a Change of Business under TSX 

Venture  Exchange  policies  and  the  Company  will  be  seeking  shareholder  approval  to  the  transaction.  

Following completion of the Acquisition it is anticipated that the Company will be classified as a Tier 2 

mining issuer on the TSX Venture Exchange.  Trading in the Company’s shares is currently halted and it is 

anticipated that trading will remain halted until completion of the Change of Business.   The Company 

will be seeking a waiver from the sponsorship requirements of the TSX Venture Exchange. 

The  Company  is  in  the  process  of  preparing  an  information  circular  which  will  be  communicated  to 

shareholders  prior  to  a  shareholders  meeting  to  be  held  to  approve  the  Change  of  Business.   It  is 

currently anticipated that this shareholders meeting will be held near the end of June with closing of the 

Acquisition to occur in July. 

Donald  J.  Birak,  an  independent  consultant  geologist  and  Qualified  Person  as  defined  under  National 

Instrument  43‐101,  has  reviewed  and  approved  the  scientific  and  technical  information  in  this  news 

release.  

About New Pacific  

New  Pacific  Holdings  Corp.  is  a  Canadian  investment  company  with  investment  focus  on  mineral 

resource industry. Silvercorp Metals Inc. (TSX: SVM), the largest primary silver producer in China, is the 

major shareholder. 

For further information, contact: 

New Pacific Holdings Corp., 

Investor Relations 

Phone: (604) 633‐1368 

Fax: (604) 669‐9387 

[email protected] 

www.newpacificholdings.ca 

CAUTIONARY NOTE REGARDING FORWARD‐LOOKING INFORMATION 

Certain  of  the  statements  and  information  in  this  press  release  constitute  “forward‐looking  information”  within  the  meaning  of  applicable 

Canadian provincial securities laws. Any statements or information that express or involve discussions with respect to predictions, expectations, 

beliefs,  plans,  projections,  objectives,  assumptions  or  future  events  or  performance  (often,  but  not  always,  using  words  or  phrases  such  as 

“expects”,  “is  expected”,  “anticipates”,  “believes”,  “plans”,  “projects”,  “estimates”,  “assumes”,  “intends”,  “strategies”,  “targets”,  “goals”, 

“forecasts”,  “objectives”,  “budgets”,  “schedules”,  “potential”  or  variations  thereof  or  stating  that  certain  actions,  events  or  results  “may”, 

“could”,  “would”,  “might”  or  “will”  be  taken,  occur  or  be  achieved,  or  the  negative  of  any  of  these  terms  and  similar  expressions)  are  not 

statements  of  historical  fact  and  may  be  forward‐looking  statements  or  information.  Forward‐looking  statements  or  information  relate  to, 

among other  things: : the completion of the Private  Placement; seeking shareholder  approval of the acquisition of the Target Company; that 

trading in the Company’s shares will remain halted until completion of the Change of Business; that Silvercorp Metals Inc. will subscribe for a 

portion of the Private Placement; the conversion of the Subscription Receipts to common shares of the Company; the assembling of a Bolivian 

drilling  team;  completion  of  the  confirmation  drilling;  the  acquisition  by  the  Company  of  the  Target  Company  pursuant  to  the  terms  of  the 

Agreement; and the implementation of the drilling program by the common standards of the best practices best practices of industry.. 

Forward‐looking  statements  or  information  are  subject  to  a  variety  of  known  and  unknown  risks,  uncertainties  and  other  factors  that  could 

cause actual events or results to differ from those reflected in the forward‐looking statements or information, including, without limitation, risks 

relating to: : the receipt of necessary competition, regulatory and third party approvals for the acquisition of the Target Company including the 

approval of the TSX Venture Exchange and the shareholders of the Company;  the ability of the Company to finance the acquisition of the Target 

Company; the inability or failure of the Company and the Vendors to satisfy the conditions to the completion of the acquisition of the Target 

Company;   the ability of the Company to integrate the Target Company into the Company’s existing operations; the devotion of management 

time and resources required to complete the acquisition of the Target Company; current global financial conditions; receipt of the approval of 

the  TSX  Venture  Exchange  to  the  Private  Placement;  the  ability  of  the  Company  to  find  suitable  investors  for  the  Private  Placement;  the 

satisfaction of the escrow release conditions for the conversion of the Subscription Receipts into common shares of the Company; the availability 

of a Bolivian drilling team and the ability to complete the confirmation drilling within the time permitted under the Agreement; the possibility 

that the confirmation drilling and future exploration   results will not be consistent with the Company’s expectations; the ability of Company to 

obtain the necessary permits and   consents required to complete the confirmation drilling; operating in Bolivia including possible expropriation 

or nationalization without adequate compensation, changing political and fiscal regimes, and economic and regulatory instability, unanticipated 

changes  to  royalty  and  tax  regulations,  unreliable  or  undeveloped  infrastructure,  labour  unrest  and  labour  scarcity,  difficulty  obtaining  key 

equipment  and  components  for  equipment,  regulations  and  restrictions  with  respect  to  imports  and  exports;  high  rates  of  inflation,  extreme 

fluctuations in currency exchange rates and the imposition of currency controls, the possible unilateral cancellation or forced re‐negotiation of 

contracts,  and  uncertainty  regarding  enforceability  of  contractual  rights,  inability  to  obtain  fair  dispute  resolution  or  judicial  determinations 

because of bias, corruption or abuse of power, difficulties enforcing judgments generally, and in particular those obtained in Canadian courts 

against assets located outside of those jurisdictions, difficulty understanding and complying with the regulatory and legal framework respecting 

the ownership and maintenance of mineral properties, mines and mining operations, and with respect to permitting, local opposition to mine 

development projects, which include the potential for violence, property damage and frivolous or vexatious claims, violence and more prevalent 

or  stronger  organized  crime  groups;  terrorism  and  hostage  taking,  military  repression  and  increased  likelihood  of  international  conflicts  or 

aggression,  and  increased  public  health  concerns;   fluctuating  commodity  prices;  calculation  of  resources,  reserves  and  mineralization  and 

precious  and  base  metal  recovery;  interpretations  and  assumptions  of  mineral  resource  and  mineral  reserve  estimates;  exploration  and 

development  programs;  feasibility  and  engineering  reports;  title  to  properties;  property  interests;  joint  venture  partners;  acquisition  of 

commercially mineable mineral rights; economic factors affecting the Company; timing, estimated amount, capital and operating expenditures 

and economic returns of future production; competition; operations and political conditions; environmental risks; insurance; risks and hazards of 

mining operations; key personnel; conflicts of interest;  and dependence on management.. 

This  list  is  not  exhaustive  of  the  factors  that  may  affect  any  of  the  Company’s  forward‐looking  statements  or  information.  Forward‐looking 

statements  or  information  are  statements  about  the  future  and  are  inherently  uncertain,  and  actual  achievements  of  the  Company  or  other 

future events or conditions may differ materially from those reflected in the forward‐looking statements or information due to a variety of risks, 

uncertainties and other factors, including, without limitation, those referred to in the Company’s Annual Information Form for the year ended 

June  30,  2016  under  the  heading “Risk  Factors”.  Although  the  Company  has  attempted  to identify  important  factors  that  could cause  actual 

results to differ materially, there may be other factors that cause results not to be as anticipated, estimated, described or intended. Accordingly, 

readers should not place undue reliance on forward‐looking statements or information. 

The Company’s forward‐looking statements and information are based on the assumptions, beliefs, expectations and opinions of management 

as of the date of this press release, and other than as required by applicable securities laws, the Company does not assume any obligation to 

update  forward‐looking  statements  and information  if circumstances  or  management’s  assumptions,  beliefs,  expectations or  opinions  should 

change, or changes in any other events affecting such statements or information. For the reasons set forth above, investors should not place 

undue reliance on forward‐looking statements and information. 

Completion  of  the  transaction  is  subject  to  a  number  of  conditions  including  TSX  Venture  Exchange 

acceptance  and  Shareholder  approval.   The  transaction  cannot  close  until  the  required  Shareholder 

approval is obtained.  There can be no assurance that the transaction will be completed as proposed or 

at all. 

Investors  are  cautioned  that,  except  as  disclosed  in  the  Management  Information  Circular  to  be 

prepared in connection with the transaction, any information released or received with respect to the 

Change  of  Business  may  not  be  accurate  or  complete  and  should  not  be  relied  upon.   Trading  in  the 

securities of New Pacific should be considered highly speculative. 

The TSX Venture Exchange has in no way passed upon the merits of the proposed transaction and has 

neither approved nor disapproved the contents of this press release.