NEW PACIFIC REPORTS FINANCIAL RESULTS FOR  

THE THREE AND SIX MONTHS ENDED DECEMBER 31, 2022  

VANCOUVER, BRITISH COLUMBIA – FEBRUARY 7, 2023: New Pacific Metals Corp. (“New Pacific” or the “Company”) 

(TSX: NUAG; NYSE American: NEWP), reports its financial results for the three and six months ended December 31, 

2022.  All figures are expressed in US dollars unless otherwise stated. 

FISCAL 2023 Q2 HIGHLIGHTS 

 The Company reported the results of the preliminary economic assessment (the “PEA”) of the Silver Sand Project 

on January 9, 2023. The PEA shows a post‐tax net present value (“NPV”) (at a 5% discount rate) of $726 million 

with an internal return rate (“IRR”) of 39%, underpinned by a total silver production of 171 million ounces over 

14 years of mine life. Please see “Cautionary Note Regarding Results of Preliminary Economic Assessment”. 

 The Company released the updated National Instrument 43‐101 ‐ Standards of Disclosure for Mineral Projects 

(“NI 43‐101”) mineral resource estimate (the “MRE”) for the Silver Sand Project on November 28, 2022. The 

MRE shows total measured and indicated mineral resource of 201.77 million ounces of silver at a head grade of 

116 grams per tonne (“g/t”). Please see “Silver Sand Project”. 

 The Company completed the 2022 drill program at the Carangas Silver‐Gold Project for a total of 50,368 meters 

(“m”) in 115 drill holes, of which assay results for 85 drill holes have been received and released to date.  The 

assay results continue to indicate that a thick zone of gold mineralization occurs beneath a shallow silver horizon 

measuring approximately 1,000 m long, 800 m wide, and up to 200 m thick. Please see “Carangas Project”. 

 The Company advanced the 6,000 m initial discovery drill program at the Silverstrike Project, and a total of 3,200 

m  in  10  drill  holes  have  been  completed,  of  which  assay  results  for  two  drill  holes  have  been  received  and 

released to date.  The assay results intersected broad gold mineralization near‐surface. Please see “Silverstrike 

Project”. 

 The Company strengthened the Board and management team by appointing Dr. Peter Megaw and Mr. Dickson 

Hall as directors and Mr. Andrew Williams as President of the Company. 

 The Company maintained working capital of $14.4 million, sufficient to advance the existing exploration projects 

and other regional exploration initiatives. 

FINANCIAL RESULTS 

Net loss attributable to equity holders of the Company for the three months ended December 31, 2022 was $1.87 

million or $0.01 per share (three months ended December 31, 2021 – net loss of $1.30 million or $0.01 per share).  The 

Company’s financial results were mainly impacted by the following: (i) operating expenses of $1.93 million compared 

to $1.36 million in the comparative quarter; (ii) net income from investments of $0.08 million compared to $0.13 million 

2 

in the comparative quarter; and (iii) foreign exchange loss of $0.03 million compared to $0.06 million in the comparative 

quarter.  

For the six months ended December 31, 2022, net loss attributable to equity holders of the Company was $3.96 million 

or $0.03 per share compared to net loss of $2.67 million or $0.02 per share for the six months ended December 31, 

2021. 

Operating expenses for the three and six months ended December 31, 2022 were $1.93 million and $3.99 million, 

respectively (three and six months ended December 31, 2021 ‐ $1.36 million and $2.96 million, respectively).   

Net Income from investments for the three months ended December 31, 2022 was $0.08 million (three months ended 

December 31, 2021 – $0.13 million) and is comprised of a $0.01 million loss on the Company’s equity investments  

(three months ended December 31, 2021 – gain of $0.07 million), a $0.03 million loss on bonds (three months ended 

December  31,  2021  –  gain  of  $0.03  million),  and  $0.12  interest  earned  from  cash  accounts  (three  months  ended 

December 31, 2021 ‐ $0.02 million). 

For the six months ended December 31, 2022, income from investments was $0.04 million (six months ended December 

31, 2021 – $0.08 million). 

Foreign  exchange  loss  for  the  three  months  ended  December  31,  2022  was  $0.03  million  (three  months  ended 

December 31, 2021 – $0.06 million).  The Company holds a portion of cash and short‐term investments in USD to 

support its operations in Bolivia.   Revaluation of these USD‐denominated financial assets to their Canadian dollar 

(“CAD”)  functional  currency  equivalents  resulted  in  unrealized  foreign  exchange  gain  or  loss  for  the  relevant 

reporting periods.  For the three months ended December 31, 2022, the USD depreciated by 1.2% against the CAD 

(from 1.3707 to 1.3544) while in the comparative period the USD depreciated by 0.5% against the CAD (from 1.2741 

to 1.2678). 

For the six months ended December 31, 2022, foreign exchange loss was $0.01 million (six months ended December 

31, 2021– gain of $0.2 million). 

Working Capital: As of December 31, 2022, the Company had working capital of $14.4 million. 

PROJECT OVERVIEW 

SILVER SAND PROJECT 

In  2021,  the  Company  completed  a  drill  program  of  13,313.7  m  in  55  holes.   The  2021  drill  program  comprised 

structure orientation drilling, step‐out and infill drilling as well as exploration drilling.  Assay results of all drill holes 

have  been  received.   Detailed  structural  logging  and  assays  of  the  oriented  drill  cores  confirmed  previous 

understanding of the orientation of mineralized structures and resource model which are dominantly striking in the 

direction of north and northwest and dipping in the direction of west at high angles which are also evidenced at 

surface outcrops and historical underground workings.  Step‐out drilling was carried out mainly outside of the major 

mineralized trends with results indicating the existence of multiple smaller satellite mineralized zones between the 

major mineralized trends.  For details of the 2021 drill program, please refer to the Company’s news release dated 

April 6, 2022.   

In 2022, the Company conducted a resource infill drilling and step‐out drilling program at the Silver Sand south block 

and  completed 19,323  m  in  86  drill  holes.  Assay  results for  all drill  holes  have  been received.  The resource  infill 

drilling aimed to improve the confidence in the continuity of mineralization in the core area of the Silver Sand Project 

and upgrade resources, while the step‐out drilling was designed to test the extension of the mineralized zones up 

and  down  dip  as  well  as  on  strike.  The  infill  and  step‐out  drilling  results  were  included  in  the  MRE  update  and 

3 

incorporated into the PEA. For details of the 2022 drill program, please refer to the Company’s news releases dated 

September 19, 2022, May 31, 2022, and April 6, 2022.   

On January 9, 2023, the Company reported the results of the PEA of its Silver Sand Project.  AMC Mining Consultants 

(Canada) Ltd. (mineral resource, mining, infrastructure and financial analysis) was contracted to conduct the PEA in 

cooperation  with  Halyard  Inc.  (metallurgy  and  processing),  and  NewFields  Canada  Mining  &  Environment  ULC 

(tailings, water and water management).  The PEA is based on the MRE, which was reported on November 28, 2022.  

Please see “Cautionary Note Regarding Results of Preliminary Economic Assessment”. For more details on the PEA, 

please refer to the Company’s news release dated January 9, 2023. 

For  the  three  and  six  months  ended  December  31,  2022,  total  expenditures  of  $1.70  million  and  $4.20  million, 

respectively (three and six months ended December 31, 2021 ‐ $1.22 million and $3.42 million, respectively) were 

capitalized under the project.  

CARANGAS PROJECT 

In 2021, the Company completed an initial discovery drill program of 13,209 m in 35 drill holes.  Assay results of all 

drill  holes  have  been  received.   Results  from  the  2021  discovery  drill  program  confirmed  the  broad  silver‐rich 

polymetallic mineralization near surface and intersected a wide zone of gold mineralization below it.  For details of 

the 2021 discovery drill program, please refer to the Company’s news releases dated May 17, 2022, February 23, 

2022, and February 10, 2022.   

Following the success of the 2021 discovery drill program, the Company completed the 2022 resource definition drill 

program for a total of 50,368 m in 115 drill holes.  Assay results of 85 drill holes have been received and released to 

date.  The assay results continue to indicate that a thick zone of gold mineralization occurs beneath a shallow silver 

horizon measuring approximately 1,000 m long, 800 m wide, and up to 200 m thick.   For details of the 2022 drill 

program, please refer to the Company’s news releases dated February 1, 2023, January 24, 2023, October 19, 2022, 

August 8, 2022, and July 13, 2022. 

The Company plans to drill 15,000 m during the first quarter of 2023 at the Carangas Project to test the eastern 

extension of gold mineralization beneath the East Dome and expand parts of the shallow silver horizon.  Following 

this drill program, an inaugural resource estimate is planned in the second quarter of 2023.  

For  the  three  and  six  months  ended  December  31,  2022,  total  expenditures  of  $2.87  million  and  $5.85  million, 

respectively (three and six months ended December 31, 2021 ‐ $1.43 million and $1.97 million, respectively) were 

capitalized under the project. 

SILVERSTRIKE PROJECT 

In 2022, the Company commenced a 6,000 m initial discovery drill program at the Silverstrike Project.  As of the date 

of this news release, a total of 3,200 m in 10 drill holes have been completed, of which assay results of the two drill 

holes have been received.  The assay results intersected broad gold mineralization starting near surface.  For details 

of the initial discovery drill program, please refer to the Company’s news releases dated November 1, 2022 and 

September 12, 2022. 

For  the  three  and  six  months  ended  December  31,  2022,  total  expenditures  of  $0.70  million  and  $1.15  million, 

respectively (three and six months ended December 31, 2021 ‐ $0.01 million and $0.01 million, respectively) were 

capitalized under the project. 

4 

MANAGEMENT DISCUSSION AND ANALYSIS 

This news release should be read in conjunction with the Company’s management discussion and analysis and the 

unaudited condensed consolidated interim financial statements and notes thereto for the corresponding period, 

which have been filed with the Canadian Securities Administrators and are available under the Company’s profile on 

SEDAR at www.sedar.com,on EDGAR at www.sec.gov and on the Company’s website at www.newpacificmetals.com. 

QUALIFIED PERSON 

The scientific and technical information contained in this news release has been reviewed and approved by Alex 

Zhang, P. Geo., Vice President of Exploration, who is a Qualified Person for the purposes of NI 43‐101. The Qualified 

Person has verified the information disclosed herein using standard verification processes, and is not aware of any 

significant risks and uncertainties or any limitations on the verification process that could be expected to affect the 

reliability or confidence in the information discussed herein. 

ABOUT NEW PACIFIC  

New  Pacific  is  a  Canadian  exploration  and  development  company  with  precious  metal  projects  in  Bolivia.  The 

Company’s flagship Project, the Silver Sand Silver Project, has released its inaugural PEA study in January 2023. The 

PEA study shows a post‐tax NPV (5% discount) of US$726 millions with an IRR of 39%, underpinned by total silver 

production of 171 million ounces over 14 years of mine life.  At the recently discovered Carangas Silver‐Gold Project, 

a resource drilling program of more than 50,000 meters was completed in 2022.  The third project, the Silverstrike 

Silver‐Gold Project, had a 6,000 m discovery drill program ongoing since June 2022. 

For further information, please contact: 

Andrew Williams, President 

New Pacific Metals Corp. Phone: (604) 633‐1368 Ext. 236 

U.S. & Canada toll‐free: 1 (877) 631‐0593 

E‐mail: [email protected] 

For additional information and to receive company news by e‐mail, please register using New Pacific’s website at 

www.newpacificmetals.com. 

CAUTIONARY NOTE REGARDING RESULTS OF PRELIMINARY ECONOMIC ASSESSMENT 

The  PEA  results  of  are  preliminary  in  nature  and  are  intended  to  provide  an  initial  assessment of  the Silver  Sand 

Project’s economic potential and development options. The PEA mine schedule and economic assessment includes 

numerous  assumptions  and  is  based  on  both  indicated  and  inferred  mineral  resources.  Inferred  resources  are 

considered too speculative geologically to have the economic considerations applied to them that would enable them 

to be categorized as mineral reserves, and there is no certainty that the project economic assessments described 

herein will be achieved or that the PEA results will be realized. The estimate of mineral resources may be materially 

affected  by  geology,  environmental,  permitting,  legal,  title,  socio‐political,  marketing  or  other  relevant  issues. 

Mineral resources are not mineral reserves and do not have demonstrated economic viability. Additional exploration 

will be required to potentially upgrade the classification of the inferred mineral resources to be considered in future 

advanced  studies.  AMC  Mining  Consultants  (Canada)  Ltd.  (mineral  resource,  mining,  infrastructure  and  financial 

analysis)  was  contracted  to  conduct  the  PEA  in  cooperation  with  Halyard  Inc.  (metallurgy  and  processing),  and 

NewFields Canada Mining & Environment ULC (tailings, water and waste management). The qualified persons for 

the PEA for the purposes of NI 43‐101 are Mr. Wayne Rogers P.Eng and Mr. Mo Molavi P.Eng both Principal Mining 

Engineers with AMC Mining Consultants (Canada) Ltd, Mr. Andy Holloway P.Eng, Process Director with Halyard Inc., 

and Mr. Leon Botham P.Eng., Principal Engineer with NewFields Canada Mining & Environment ULC. This is in addition 

to Ms. Dinara Nussipakynova, P.Geo., Principal Geologist with AMC Consultants (Canada) Ltd. Who estimated the 

mineral resources. All qualified persons for the PEA have reviewed the disclosure of the PEA herein. The PEA is based 

5 

on the MRE, which was reported on November 28, 2022. The effective date of the MRE is October 31 2022. The cut‐

off applied for reporting the pit‐constrained mineral resources is 30 g/t silver. Assumptions made to derive a cut‐off 

grade included mining costs, processing costs and recoveries and were obtained from comparable industry situations. 

The model is depleted for historical mining activities. Mineral resources are constrained by optimized pit shells at a 

silver price of US$22.50 per ounce, silver metallurgical recovery of 91%, silver payability of 99%, open pit mining cost 

of US$2.6/t, processing cost of US$16/t, G&A cost of US$2/t, and slope angle of 44‐47 degrees. Key assumptions used 

for pit optimization for the PEA mining pit include silver price of US$22.50 per ounce, silver metallurgical recovery of 

91%,  silver  payability  of  99%,  open  pit  mining  cost  of  US$2.6/t,  incremental  mining  cost  of  US$0.04/t  (per  10  m 

bench), processing cost of US$16/t, tailing storage facility operating cost of US$0.7/t, G&A cost of US$2/t, royalty of 

6.00%, mining recovery of 92%, dilution of 8%, and cut‐off grade of 30 g/t silver. 

CAUTIONARY NOTE REGARDING FORWARD‐LOOKING INFORMATION 

Certain of the statements and information in this news release constitute “forward‐looking statements” within the 

meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward‐looking information” 

within the meaning of applicable Canadian provincial securities laws.  Any statements or information that express or 

involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or 

future  events  or  performance  (often,  but  not  always,  using  words  or  phrases  such  as  “expects”,  “is  expected”, 

“anticipates”,  “believes”,  “plans”,  “projects”,  “estimates”,  “assumes”,  “intends”,  “strategies”,  “targets”,  “goals”, 

“forecasts”, “objectives”, “budgets”, “schedules”, “potential” or variations thereof or stating that certain actions, 

events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative of any of 

these terms and similar expressions) are not statements of historical fact and may be forward‐looking statements or 

information. Such statements include, but are not limited to: statements regarding anticipated exploration, drilling, 

development, construction, and other activities or achievements of the Company; inferred, indicated or measured 

mineral resources or mineral reserves on the Company’s projects; the results of the PEA; timing of receipt of permits 

and regulatory approvals; and estimates of the Company’s revenues and capital expenditures. 

Forward‐looking statements or information are subject to a variety of known and unknown risks, uncertainties and 

other factors that could cause actual events or results to differ from those reflected in the forward‐looking statements 

or  information,  including,  without  limitation,  risks  relating  to:  global  economic  and  social  impact  of  COVID‐19; 

fluctuating  equity  prices,  bond  prices,  commodity  prices;  calculation  of  resources,  reserves  and  mineralization, 

general economic conditions, foreign exchange risks, interest rate risk, foreign investment risk; loss of key personnel; 

conflicts of interest; dependence on management, uncertainties relating to the availability and costs of financing 

needed in the future, environmental risks, operations and political conditions, the regulatory environment in Bolivia 

and  Canada,  risks  associated  with  community  relations  and  corporate  social  responsibility,  and  other  factors 

described under the heading “Risk Factors” in the Company’s Annual Information Form for the year ended June 30, 

2022 and its other public filings.   

This  list  is  not  exhaustive  of  the  factors  that  may  affect  any  of  the  Company’s  forward‐looking  statements  or 

information.   

The forward‐looking statements are necessarily based on a number of estimates, assumptions, beliefs, expectations 

and opinions of management as of the date of this news release that, while considered reasonable by management, 

are  inherently  subject  to  significant  business,  economic  and  competitive  uncertainties  and  contingencies.   These 

estimates,  assumptions,  beliefs,  expectations  and  options  include,  but  are  not  limited  to,  those  related  to  the 

Company’s ability to carry on current and future operations, including: the duration and effects of COVID‐19 on our 

operations  and  workforce;  development  and  exploration  activities;  the  timing,  extent,  duration  and  economic 

viability of such operations; the accuracy and reliability of estimates, projections, forecasts, studies and assessments; 

the Company’s ability to meet or achieve estimates, projections and forecasts; the stabilization of the political climate 

in Bolivia; the Company’s ability to obtain and maintain social license at its mineral properties; the availability and 

cost  of  inputs;  the  price  and  market  for  outputs;  foreign  exchange  rates;  taxation  levels;  the  timely  receipt  of 

necessary approvals or permits, including the ratification and approval of the Mining Production Contract with the 

Corporacion Minera de Bolivia (“COMIBOL”) by the Plurinational Legislative Assembly of Bolivia; the ability of the 

6 

Company’s Bolivian partner to convert the exploration licenses at the Carangas Project to AMC; the ability to meet 

current and future obligations; the ability to obtain timely financing on reasonable terms when required; the current 

and future social, economic and political conditions; and other assumptions and factors generally associated with 

the mining industry. 

Although the forward‐looking statements contained in this news release are based upon what management believes 

are reasonable assumptions, there can be no assurance that actual results will be consistent with these forward‐

looking  statements.   All  forward‐looking  statements  in  this  news  release  are  qualified  by  these  cautionary 

statements.   Accordingly,  readers  should  not  place  undue  reliance  on  such  statements.  Other  than  specifically 

required  by  applicable  laws,  the  Company  is  under  no  obligation  and  expressly  disclaims  any  such  obligation  to 

update or alter the forward‐looking statements whether as a result of new information, future events or otherwise 

except as may be required by law.  These forward‐looking statements are made as of the date of this news release. 

CAUTIONARY NOTE TO US INVESTORS 

This news release has been prepared in accordance with the requirements of the securities laws in effect in Canada 

which differ from the requirements of United States securities laws. All mining terms used herein but not otherwise 

defined have the meanings set forth in NI 43‐101.  Unless otherwise indicated, the technical and scientific disclosure 

herein has been prepared in accordance with NI 43‐101, which differs significantly from the requirements adopted 

by the U.S. Securities and Exchange Commission. 

Accordingly, information contained in this news release containing descriptions of the Company's mineral deposits 

may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure 

requirements of United States federal securities laws and the rules and regulations thereunder. 

Additional information relating to the Company, including the Company’s Annual Information Form, can be obtained 

under the Company’s profile on SEDAR at www.sedar.com, on EDGAR at www.sec.gov, and on the Company’s website 

at www.newpacificmetals.com.