Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NUAG.TO ·

New Pacific Metals Reports an updated Mineral Resource Estimate for the Silver Sand Deposit, Bolivia – Increases Silver Ounces in Measured and Indicated Mineral Resources by 30%

Resource Estimates

1

NEWS RELEASE

New Pacific Metals Reports an updated Mineral Resource Estimate

for the Silver Sand Deposit, Bolivia – Increases Silver Ounces in Measured and

Indicated Mineral Resources by 30%

Vancouver, British Columbia – November 28, 2022 –New Pacific Metals Corp. (“New Pacific” or the

“Company”) (TSX: NUAG; NYSE American: NEWP) is pleased to announce an updated Mineral Resource

Estimate for the Silver Sand Project (the “Project’), which is part of the on -going Preliminary Economic

Assessment (“PEA”) study of the Project. The PEA study is on track to be completed by the end of 2022. The

Mineral Resource is reported in accordance with National Instrument 43‐101 (“NI 43‐101”) for its 100%

owned Silver Sand Project, Bolivia. The estimate was completed by AMC Mining Consultants (Canada) Ltd.

(“AMC Consultants”).

MINERAL RESOURCE ESTIMATES

The Mineral R esource Estimate used conceptual open pit mining constraints for reporting purposes and is

presented in Table 1. Mineral Resources are stated at a 30 g/t silver cut‐off grade and the model is depleted

for historical mining activities:

Table 1. Silver Sand Deposit Mineral Resource as of 31 October 2022

Resource category Tonnes (Mt) Ag (g/t) Ag (Moz)

Measured 14.88 131 62.60

Indicated 39.38 110 139.17

Measured & Indicated 54.26 116 201.77

Inferred 4.56 88 12.95

Notes:

• CIM Definition Standards (2014) were used for reporting the Mineral Resources.

• The Qualified Person is Dinara Nussipakynova, P.Geo. of AMC Mining Consultants (Canada) Ltd.

• Mineral Resources are constrained by optimized pit shells at a metal price of US$22.50/oz Ag, recovery of 91% Ag and cut-off

grade of 30 g/t Ag.

• Drilling results up to 25 July 2022.

• The numbers may not compute exactly due to rounding.

• Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

Source: AMC Consultants.

The assumptions for the open pit optimization exercise to constrain the Mineral Resource and conform to

reasonable prospects for eventual economic extractio n are shown in Table 2.

2

Table 2. Assumptions for pit optimization

Input Units Value

Silver price US$/oz Ag 22.5

Silver process recovery % 91

Payable silver % 99

Mining recovery factor % 100

Mining cost US$/t mined 2.6

Process cost US$/t minable material > COG 16

G&A cost US$/t minable material > COG 2

Slope angle Degrees 44 – 47

A comparison of the 2019 and 2022 Mineral Resource Estimates are shown in Table 3. The footnotes to Table

1 and Table 3 summarize the differences in the assumptions between the two estimates, most notably silver

price, recovery, and cut -off grade. An increased mining cost assumption for the 2022 estimate has resulted

in an optimum pit shell that does not go as deep as the 2019 estimate.

Table 3. Comparison between 2019 and 2022 Mineral Resources

Class Tonnes (Mt) Ag (g/t) Ag (Moz)

2019

(Cut-off 45 g/t Ag)

Measured 8.40 159 43.05

Indicated 26.99 130 112.00

Measured and Indicated 35.39 137 155.05

Inferred 9.84 112 35.55

2022

(Cut-off 30 g/t Ag)

Measured 14.88 131 62.60

Indicated 39.38 110 139.17

Measured and Indicated 54.26 116 201.77

Inferred 4.56 88 12.95

Difference

Measured 6.48 -28 19.55

Indicated 12.39 -20 27.17

Measured and Indicated 18.87 -21 46.72

Inferred -5.28 -24 -22.60

Notes:

• These are the pertinent footnotes for the 2019 Mineral Resources.

• The notes pertaining to the 2022 Mineral Resources are shown below Table 1.

• Other than the following the same notes apply for both estimates.

• Mineral Resources are constrained by an optimized pit shell at a metal price of US$18.70/oz Ag, recovery of 90% Ag and cut-

off grade of 45 g/t Ag.

• Mineral Resources are reported inside the Claim boundary.

• Pit optimization allows waste mining to extend outside the claim to the NE and SW, but no mineralization outside the

Administrative Mining Contract is included.

• Drilling results up to 31 December 2019.

Source: AMC Consultants.

The majority of the Mineral Resources lie within the Administrative M ining Contract (“AMC”). Table 4 shows

the split of the 2022 Mineral Resource within the AMC boundary and outside the bound ary. Since the 2019

Mineral Resources were reported , a subsequent agreement with COMIBOL permits the reporting of Mineral

Resources outside the AMC . Mineral resources outside the AMC boundary will be subject to a royalty of 6%

payable to COMIBOL during the production stage according to the agreement reached with COMIBOL.

3

Table 4. Mineral Resources within and outside the AMC

Restricted by AMC boundary Outside AMC boundary

Resource category Tonnes (Mt) Ag (g/t) Ag (Moz) Tonnes (Mt) Ag (g/t) Ag (Moz)

Measured 14.57 131 61.51 0.31 108 1.08

Indicated 34.38 110 121.38 5.00 111 17.79

Measured and Indicated 48.95 116 182.90 5.31 111 18.87

Inferred 3.17 77 7.88 1.40 113 5.07

HIGHLIGHTS

• Silver Sand is one of the most significant new global primary silver discoveries in the last decade.

• Mineralization remains open on strike to the North and South and at depth. No feeder zones or source

intrusions have been discovered to date. The Company classifies the exploration potential as good to

excellent.

• Estimated Measured and Indicated Mineral Resources have increased by 30%, this is partly the result of

infill drilling upgrading Inferred Mineral Resources.

• Detailed drilling indicates good mineral continuity to provide high confidence – lower technical risk.

Measured & Indicated Mineral Resources of 54.26 Mt @ 116 g/t Ag for 201.77 Moz or 94% of the total

estimate.

• Mineralization starts at or near‐surface and is amenable to potential open‐pit mining extraction.

Approximately 95% of the reported Mineral Resources are within 200 m of the topographic surface.

• Favorable initial metallurgical test work indicates laboratory‐based recoveries of up to 97% for the various

oxide – transition and sulphide mineral domains (see news release dated 23 August 2019 for details).

More detailed metallurgy testwork is being carried out to facilitate the future design of the processing

plant.

• The PEA study is well on track to be complete by the end of 2022.

• In addition to the currently reported Mineral Resources, there are numerous known satellite mineral

occurrences in the district of six kilometers long by two and a half kil ometers wide. These mineral

occurrences demonstrate similar mineralization style and grades to Silver Sand, subjected to extensive

artisanal mining starting from Spanish colonial times and bore little modern exploration. The Company

believes these satellite occurrences have good resource potential.

RESOURCE ESTIMATE DETAILS

The Mineral Resource Estimate is based on a geological model that included assay results received by New

Pacific for the Silver Sand deposit to 25 July 2022. Mineralization wireframes were constructed by New Pacific

with LeapFrog© software. The 131 domains were reviewed by the independent Qualified Person ( “QP”) and

were accepted for estimation purposes. Over 82% of the volume was contained in the two largest domains.

AMC completed an ordinary kriging (“OK”) estimate on the four largest domains and inverse distance squared

(“ID2”) was used in the other domains . Prior to estimation, drill hole data were composited to an average of

1.2 m samples and were capped for all variables within each domain where required. Capping value for silver

was 2,000 g/t Ag for all domains.

In addition to the estimate completed inside the domains, a background OK estimate was also completed

outside of mineralization wireframes.

For the mineralized domains the parent block size was 2.5 mE x 5 mN x 2.5 mRL with sub‐blocking employed.

Sub‐blocking resulted in minimum cell dimensions of 1.25 mE x 0.5 mN x 1.25 mRL.

4

The background mineralization (outside the mineralization domains) was estimated with a parent block

dimension of 5 mE x 10 mN x 5 mRL.

As mineralization is hosted in one rock type, the QP assigned bulk density measurements to the block model

based on the mean bulk density. Density values of 2.54 tonnes/m 3 was assigned to both blocks inside and

outside of the mineralized domains.

Mineral Resource classification was completed using an assessment of geological and mineralization

continuity, data quality and data density. Estimation passes were used as an initial guide for classification.

Wireframes were then generated manually to build coherent volumes for th e different classes. The block

model was classified as Measured, Indicated, and Inferred Mineral Resources as appropriate.

QUALITY ASSURANCE AND QUALITY CONTROL and DATA VERIFICATION

HQ‐size drill core samples from altered and mineralized intervals are split into halves by diamond saw, with an

average sample length of between one to one and a half metres at the Company’s core processing facility

located in Betanzos, a small town located 20 kilometres from the project site. Half core samples are stored in

a secure storage facility in Betanzos for future reference, with the other half shipped in securely sealed bags

to ALS Global in Oruro, Bolivia for preparation, and ALS Global in Lima, Peru for geochemical analysis. All

samples are first analyzed by a multi‐element ICP package (ALS code ME‐MS41) with ore grade over limits for

silver, lead and zinc further analyzed using ALS code OG46. Further silver over limits are analyzed by gravimetric

analysis (ALS code of GRA21).

A standard quality assurance and quality control ( “QA/QC”) protocol is employed to monitor the quality of

sample preparation and analysis. Standards of certified reference materials and blanks are inserted into the

normal core sample sequences prior to shipping to the lab at a ratio of 20:1 (i.e., every 20 samples contain at

least one standard sample and one blank sample). Duplicate samples of coarse rejects at a ratio of 20:1 are

sent to a second internationally accredited l ab for check analysis. The assay results of QA /QC samples of

standards and blanks do not show any significant bias of analysis or contamination during sample preparation.

The QP, Dinara Nussipakynova, P.Geo. considers sample preparation, analytical, and security protocols

employed by New Pacific to be acceptable. The QP has reviewed the QA/QC procedures used by New Pacific

including the use of certified reference materials, blank, duplicate, and umpire data, and considers the assay

database to be adequate for Mineral Resource estimation.

The QP also carried out data verification both on-site and on the database. This included a review of the assay

database and collar locations. The QP considers the assay database to be acceptable for Mineral Resource

estimation.

QUALIFIED PERSONS

The Mineral Resource Estimate and data verification was completed by Ms Dinara Nussipakynova, P.Geo.,

Principal Geologist with AMC Consultants who is the QP for the purpose of NI 43‐101 for all technical

information pertaining to the current Mineral Resource. New Pacific’s quality assurance and quality control

program was reviewed by the QP who has also reviewed the technical content of this news re lease for the

Silver Sand deposit and have approved its dissemination.

Further details supporting the geological model, estimation procedure and metallurgical test work will be

available in a n NI 43‐101 Technical Report disclosing the results of the PEA wh ich will be posted under the

Company’s profile at www.sedar.com in early 2023.

This news re lease has been reviewed and approved by Alex Zhang , P.Geo., Vice President of Exploration of

5

New Pacific Metals Corp. who is the designated QP for the Company.

About New Pacific

New Pacific is a Canadian exploration and development company with precious metal projects in

Bolivia. The Company’s flagship Project, the Silver Sand Silver Project, is expected to deliver a new

Mineral Resource Estimate Update and a PEA by the end of 2022 . The recently discovered Carangas

Silver-Gold Project is undergoing a 40,000 m drill prog ram. The third project, the Silverstrike Silver -

Gold Project, commenced a 6,000 m discovery drill program in June 2022 and a near surface broad gold

zone was discovered from its first drill hole.

On behalf of New Pacific Metals Corp.

Dr. Rui Feng

Director and CEO

For further information, contact:

New Pacific Metals Corp.

Phone: (604) 633‐1368 Ext. 222

U.S. & Canada toll-free: 1-877-631-0593

E-mail: [email protected]

For additional information and to receive company news by e -mail, please register using New Pacific’s website

at www.newpacificmetals.com

Cautionary Statements Regarding Estimates of Mineral Resources

This news release uses the terms measured, indicated and inferred resources as a relative measure of the level of

confidence in the resource estimate. Readers are cautioned that mineral resources are not economic mineral reserves

and that the economic viability of resources that are not mineral reserves has not been demonstrated. The estimate of

mineral resources may be materially affected by geology, environmental, permitting, legal, title, socio‐ political,

marketing or other relevant issues. The mineral resource estimate is classified in accordance with the Canadian

Institute of Mining, Metallurgy and Petroleum's "CIM Definition Standards on Mineral Resources and Mineral

Reserves" incorporated by reference into NI 43‐101. Under Canadian rules, estimates of inferred mineral resources

may not form the basis of feasibility or pre‐feasibility studies or economic studies except for Preliminary Assessment as

defined under NI 43‐101. Readers are cautioned not to assume that further work on the stated resources will lead

to mineral reserves that can be mined economically.

CAUTIONARY NOTE REGARDING FORWARD‐LOOKING INFORMATION

Certain of the statements and information in this news release constitute “forward‐looking information” within the

meaning of applicable Canadian provincial securities laws. Any statements or information that express or involve

discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events

or performance (often, but not always, using words or phrases such as “expects”, “is expected”, “anticipates”, “believes”,

“plans”, “projects”, “estimates”, “assumes”, “intends”, “strategies”, “targets”, “goals”, “forecasts”, “objectives”,

“budgets”, “schedules”, “potential” or variations thereof or stating that certain actions, events or

results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative of any of these terms

and similar expressions) are not statements of historical fact and may be forward‐looking statements or information.

Forward‐looking statements or information are subject to a variety of known and unknown risks, uncertainties and other

factors that could cause actual events or results to differ from those reflected in the forward‐looking statements or

information, including, without limitation, risks relating to: fluctuating equity prices, bond prices, commodity prices;

calculation of resources, reserves and mineralization, foreign exchange risks, interest rate risk, foreign investment risk;

loss of key personnel; conflicts of interest; dependence on management and others.

This list is not exhaustive of the factors that may affect any of the Company’s forward‐looking statements or

6

information. Forward‐looking statements or information are statements about the future and are inherently uncertain,

and actual achievements of the Company or other future events or conditions may differ materially from those reflected

in the forward‐looking statements or information due to a variety of risks, uncertainties and other factors, including,

without limitation, those referred to in the Company’s Annual Information Form for the year ended June 30, 2019

under the heading “Risk Factors”. Although the Company has attempted to identify important factors that could cause

actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated,

described or intended. Accordingly, readers should not place undue reliance on forward‐ looking statements or

information.

The Company’s forward‐looking statements or information are based on the assumptions, beliefs, expectations and

opinions of management as of the date of this news release, and other than as required by applicable securities laws, the

Company does not assume any obligation to update forward‐looking statements or information if circumstances or

management’s assumptions, beliefs, expectations or opinions should change, or changes in any other events affecting

such statements or information. For the reasons set forth above, investors should not place undue reliance on forward‐

looking statements or information.

CAUTIONARY NOTE TO US INVESTORS

This news release has been prepared in accordance with the requirements of NI 43‐101 and the Canadian Institute of

Mining, Metallurgy and Petroleum Definition Standards, which differ from the requirements of U.S. Securities laws. NI

43‐101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure

an issuer makes of scientific and technical information concerning mineral projects.