Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NUAG.TO ·

CLUDING AN I A BROA r, British Col u

Corporate Updates

NEWS REL

Trading Sy

INC

Vancouve

(“New Pac

from  its w

continue t

Since  the 

received a

drill  grid t

drilled in 2

t o  t h e  s tr

mineraliza

mineralize

results ind

Highlights 

1 – Compo

LEASE 

ymbol:    TSX‐ V

OTCQ

NEW PAC

CLUDING AN I

A BROA

r, British Col u

cific” or the “ C

wholly‐owned 

o show wide i

release  of  as

assay results  o

to  a  density o

2018.  Holes w

rike  and  dip 

tion  in  fractu

ed zone of 165

dicate that hig

of significant 

osited Drill Inte

Drill hole D

Drill hole D

Drill hole D

Drill hole D

Drill hole D

V: NUAG 

QX: NUPMF 

CIFIC CONTINU

INTERCEPT OF

AD ZONE OF 1

umbia – Aug u

Company”) is 

Silver  Sand  P

intervals of sil

ssay  results  o

of an additio n

of  25  metres 

were approxim

of  mineralize

ures  develope

5.5m @ 204g/

h grade centre

drill intersect

ersections of M

DSS522506, 16

      incl. 93.5

      incl. 45.0

DSS427501, 75

      incl. 3.5m

      incl. 10.3

      incl. 11.7

DSS4408, 140.7

      incl. 14.2

      incl. 9.8m

DSS447502, 68

       incl. 4.5

       incl. 3.25

DSS5213, 179.9

UES REPORTIN

F 93.5 METRE

165.5 METRES

ust 27, 2019  –

pleased to an

Project  locate

ver mineraliza

f  second  batc

nal 20 drill ho

by  25  metres

mately oriented

ed  structures.

d  in  bleached

/t Ag including

es exist in bro

tions are summ

Mineralization

65.5m @ 204g

5m @ 336g/t A

0m @ 641g/t A

5.8m @ 128g/t

m @ 746g/t A

3m @ 266g/t A

79m @ 293g/

71m @ 109g/t

24m @ 362g/

m @ 548g/t A

8.68m @ 153g

m @ 1,140g/t

5m @ 851g/t

9 m @ 88g/t A

NG WIDE DRIL

S GRADING 33

S GRADING 20

– New Pacific  M

nounce the a

d  in  the  Dep

ation.   

ch  of  31  drill 

les from Silv e

s t o  c o n f i r m  c

d at azimuths

.    All  holes  c

d  quartz  sands

g a bonanza g

oad mineraliza

marized as fo

n below): 

g/t Ag from 73

Ag from 73.8m

Ag from 116.3

t Ag from 71.1

Ag from 71.1m

Ag from 87.5m

/t Ag from 114

t Ag from 38.2

/t Ag from 38.2

Ag from 134.3m

g/t Ag from 65

/t Ag from 66.5

t Ag from 87.7

Ag from 61.9m

LL INTERCEPT

36 GRAMS PE

04 GRAMS PER

Metals Corp. 

ssay results o

artment  of P o

 h o l e s  o n  Au

er Sand Proje c

continuity  of 

of 60 degrees

continuously 

stones.    Drill 

rade subzone

ation. 

llows (for a d e

3.8m to 239.3m

m to 167.3m,

3m to 161.3m

1m to 146.9m

m to 74.6m, 

m to 97.8m, 

4.7m to 126.49

29m to 179.0m

29m to 52.53m

m to 144.1m;

5.5m to 135.18

5m to 71.0m,

75m to 91.0m;

m to 241.8m in

TS AT SILVER S

ER TONNE SILV

R TONNE SILV

(TSX‐V: NUAG

of the third b a

otosí,  Bolivia.

ugust  6,  2019,

ct which wer e

mineralizatio

s with dips of 

intercept  sign

hole  DSS5250

 of 45.0m @  6

etailed list, pl

m, 

m; 

m, 

9m; 

m, 

m, 

8m, 

; 

ncl. 0.75m min

SAND  

VER WITHIN 

VER 

G) (OTCQX: N U

atch of 20 dril l

.  T h e  a s s a y  r

,  the  Compan

e drilled to in f

n  in  selected 

‐45 degrees n

nificant  wide 

006  intersecte

641g/t Ag.  Th

ease refer to 

ned out, 

UPMF) 

l holes 

results 

ny  has 

fill the 

areas 

normal 

silver 

ed  the 

he drill 

Table‐

2 

       incl. 17.1m @ 265g/t Ag from 114.9m to 132.0m, 

       incl. 13.17m @ 339g/t Ag from 173.98m to 187.15m; 

 Drill hole DSS5214, 109.75m @ 96g/t Ag from 51.6m to 161.35m,  

incl. 14.15m @ 250g/t Ag from 54.35m to 68.5m, 

incl. 16.5m @ 228g/t Ag from 87.3m to 103.8m; 

(True  width  of  the  mineralization  is  unknown,  but  based  on  the current  understanding  of  the  relationship 

between drill hole direction and the mineralized structures it  is estimated that true width will approximate 80% 

of  the  down  hole  interval  length.    Please  refer  to  Table‐1  –  Composited  Drill  Intersections  of  Mineralization 

below for details.) 

To expedite drilling at Silver Sand, a fourth rig has arrived o n site and has commenced drilling.  An initial NI 

43‐101 resource estimate is expected by the end of this year.   

Quality Assurance and Quality Control 

HQ‐size drill core samples from altered and mineralized interva ls were split into halves by diamond saw, with 

an average sample length of between one to  one and half metres  at the Company’s core processing facility 

located in Betanzos, a small town located 20 kilometres from th e project site.  Half core samples are stored in 

a secure core storage facility in Betanzos for future reference , and the other half core samples are shipped in 

s e c u r e l y  s e a l e d  b a g s  t o  A L S  G l o b a l  i n  O r u r o ,  B o l i v i a  f o r  p r e p a ration,  and  ALS  Global  in  Lima,  Peru  for 

geochemical analysis.  All samples are first analyzed by a multi‐element ICP package (ALS code ME‐MS41) with 

ore grade over limits for silver, lead and zinc further analyze d using ALS code OG46.  Further silver over limits 

are analyzed by gravimetric analysis (ALS code of GRA21). 

A standard quality assurance and quality control (“QAQC”) proto col was employed to monitor the quality of 

sample  preparation  and  analysis.    Standards  of  certified  reference  materials  and  blanks  were  inserted  in 

no rmal co re s ample s equences  prio r to  shipment to  la b at a ra tio of 20:1 (i.e., every 20 samples contain at 

least one standard sample and one blank sample).  Duplicate sam ples of coarse rejects at a ratio of 20:1 will 

be sent to a second internationally accredited lab for check an alysis.  The assay results of QAQC samples of 

standards and blanks did not show any significant bias of analysis or contamination during sample preparation. 

Technical information contained in this news release has been r eviewed and approved by Alex Zhang, P. Geo., 

Vice President of Exploration, who is a Qualified Person for the purposes of NI 43‐101. 

About New Pacific  

New Pacific is a Canadian exploration and development company w hich owns the Silver Sand Project in Potosí 

Department, Bolivia and the Tagish Lake gold project in Yukon, Canada.  New Pacific has Silvercorp Metals Inc. 

( T S X / N Y S E  A m e r i c a n :  S V M )  a n d  P a n  A m e r i c a n  S i l v e r  C o r p .  ( T S X / N A SD A Q :  P A A S )  a s  i t s  2 8 %  a n d  1 6 . 8 %  

shareholders, respectively. 

For further information, contact: 

New Pacific Metals Corp. 

Gordon Neal 

President 

3 

Phone:   (604) 633‐1368 

Fax:   (604) 669‐9387 

[email protected] 

www.newpacificmetals.com 

Neither the TSX Venture Exchange nor its Regulation Services Pr ovider (as that term is defined in the policies of the 

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. 

CAUTIONARY NOTE REGARDING FORWARD‐LOOKING INFORMATION 

Certain of the statements and information in this news release  constitute “forward‐looking information” within the 

meaning  of  applicable  Canadian  provincial  securities  laws.  Any statements  or  information  that  express  or  involve 

discussions  with  respect  to  predictions,  expectations,  beliefs,  plans,  projections,  objectives,  assumptions  or  future 

events or performance (often, but not always, using words or phrases such as “expects”, “is expected”, “anticipates”, 

“believes”,  “plans”,  “projects”,  “estimates”,  “assumes”,  “inten ds”,  “strategies”,  “targets”,  “goals”,  “forecasts”, 

“objectives”,  “budgets”,  “schedules”,  “potential”  or  variations t h e r e o f  o r  s t a t i n g  t h a t  c e r t a i n  a c t i o n s ,  e v e n t s  o r  

results “may”, “could”, “would”, “might” or “will” be taken, oc cur or be achieved, or the negative of any of these 

terms  and  similar  expressions)  are  not  statements  of  historical  fact  and  may  be  forward‐looking  statements  or 

information.  

Forward‐looking statements or information are subject to a vari ety of known and unknown risks, uncertainties and 

other  factors  that  could  cause  actual  events  or  results  to  diff e r  f r o m  t h o s e  r e f l e c t e d  i n  t h e  f o r w a r d ‐ l o o k i n g  

statements  or  information,  including,  without  limitation,  risks  relating  to:  fluctuating  equity  prices,  bond  prices, 

commodity  prices;  calculation  of resources,  reserves  and  mineralization,  foreign  exchange  risks,  interest  rate  risk, 

foreign investment risk; loss of key personnel; conflicts of interest; dependence on management and others.   

This  list  is  not  exhaustive  of  the  factors  that  may  affect  any of  the  Company’s  forward‐looking  statements  or 

information.  Forward‐looking  statements  or  information  are  stat ements  about  the  future  and  are  inherently 

uncertain, and actual achievements of the Company or other futu re events or conditions may differ materially from 

those reflected in the forward‐looking statements or informatio n due to a variety of risks, uncertainties and other 

factors,  including,  without  limitation,  those  referred  to  in  the  Company’s  Annual  Information  Form  for  the  year 

ended June 30, 2018 under the heading “Risk Factors”. Although  the Company has attempted to identify important 

factors that could cause actual results to differ materially, there may be other factors that cause results not to be as 

anticipated,  estimated,  described  or  intended.  Accordingly,  readers  should  not  place  undue  reliance  on  forward‐

looking statements or information.   

The Company’s forward‐looking statements or information are bas ed on the assumptions, beliefs, expectations and 

opinions  of  management  as  of  the  date  of  this  news  release,  and  other  than  as  required  by  applicable  securities 

laws,  the  Company  does  not  assume  any  obligation  to  update  forw ard‐looking  statements  or  information  if 

circumstances  or  management’s  assumptions,  beliefs,  expectations  or  opinions  should  change,  or  changes  in  any 

other events affecting such statements or information. For the  reasons set forth above, investors should not place 

undue reliance on forward‐looking statements or information.  

CAUTIONARY NOTE TO US INVESTORS 

This news release has been prepared in accordance with the requ irements of NI 43‐101 and the Canadian Institute 

of  Mining,  Metallurgy  and  Petroleum  Definition  Standards,  which d i f f e r  f r o m  t h e  r e q u i r e m e n t s  o f  U . S .  S e c u r i t i e s  

laws.    NI  43‐101  is  a  rule  developed  by  the  Canadian  Securities  Administrators  that  establishes  standards  for  all 

public disclosure an issuer makes of scientific and technical information concerning mineral projects. 

4 

Table 1 – Composited Drill Intersections of Mineralization 

Hole_id  Section 

   Mineralized Intervals       

   From (m)  To (m)  Length (m)  Ag_g/t  Pb_%  Zn_%  note    

DSS427501  4275     71.10  146.90  75.80  128  0.03  0.00       

      incl.  71.10  74.60  3.50  746  0.13  0.00       

      incl.  87.50  97.80  10.30  266  0.05  0.00       

      incl.  114.70  126.49  11.79  293  0.06  0.00       

DSS4408  44     38.29  179.00  140.71  109  0.01  0.02       

      incl.  38.29  52.53  14.24  362  0.02  0.02       

      incl.  134.30  144.10  9.80  548  0.03  0.01       

DSS4409  44     98.36  100.70  2.34  106  0.02  0.04       

         117.92  120.28  2.36  188  0.58  0.01       

         174.17  216.50  42.33  67  0.02  0.00       

DSS442501  4425     58.50  62.25  3.75  87  0.03  0.02       

         93.53  173.00  79.47  62  0.02  0.00       

DSS442502  4425     107.10  143.60  36.50  82  0.05  0.02       

DSS445005  4450     64.37  65.71  1.34  306  0.04  0.13       

         101.92  108.40  6.48  118  0.04  0.01       

         166.44  208.45  42.01  84  0.01  0.00       

DSS447501  4475     39.30  50.75  11.45  48  0.06  0.04       

         92.00  116.00  24.00  51  0.01  0.00       

         140.45  152.90  12.45  34  0.03  0.01       

         194.44  195.55  1.11  501  0.15  0.00       

DSS447502  4475     66.50  135.18  68.68  153  0.06  0.10       

      incl.  66.50  71.00  4.50  1,140  0.16  0.02       

      incl.  87.75  91.00  3.25  851  0.15  0.01       

         183.70  185.13  1.43  122  0.02  0.00       

DSS5213  52     61.90  241.80  179.90  88  0.09  0.02  0.75m mined out 

      incl.  114.90  132.00  17.10  265  0.59  0.01       

      incl.  173.98  187.15  13.17  339  0.04  0.00       

DSS5214  52     51.60  161.35  109.75  96  0.07  0.03       

      incl.  54.35  68.50  14.15  250  0.06  0.01       

      incl.  87.30  103.80  16.50  228  0.11  0.02       

DSS522505  5225     52.64  148.43  95.79  45  0.04  0.02       

DSS522506  5225     73.80  239.30  165.50  204  0.06  0.01       

      incl.  73.80  167.30  93.50  336  0.10  0.00       

      incl.  116.30  161.30  45.00  641  0.19  0.01       

DSS522507  5225     68.80  162.00  93.20  75  0.05  0.10       

      incl.  68.80  73.40  4.60  397  0.13  0.73       

DSS522508  5225     144.88  171.91  27.03  77  0.03  0.01       

         200.30  201.68  1.38  351  0.04  0.00       

DSS522509  5225     46.22  93.70  47.48  62  0.03  0.00       

         176.85  212.02  35.17  82  0.08  0.02       

         311.60  327.50  15.90  31  0.02  0.14       

DSS522511  5225     24.88  114.61  89.73  76  0.02  0.04       

5 

DSS662503  6625     83.55  217.00  133.45  37  0.15  0.34       

         255.77  257.00  1.23  410  0.03  0.01       

DSS642502  6425     17.78  103.00  85.22  78  0.05  0.01  24.83m mined out 

         155.67  158.86  3.19  1,315  0.93  0.64       

         269.50  270.70  1.20  280  0.02  0.04       

DSS682501  6825     36.49  37.60  1.11  132  0.04  0.00       

         52.87  54.16  1.29  149  0.06  0.00       

         86.50  136.20  49.70  60  0.10  0.03       

         222.90  225.00  2.10  184  0.18  0.03       

DSS682502  6825     112.20  168.60  56.40  44  0.08  0.01       

Notes:    g/t = grams per metric tonne.  

The  table  above  is  intended  to  show  highlights  of  the  drilling  program  only.    The  intercepts 

shown are a weighted average of the sample lengths and grades o f all of the samples within that 

intercept and may include some samples with grades less than 30 g/t silver. 

Intersections may contain samples less than 30 g/t silver between higher grade subintervals. 

Intervals are drill core length in meters.  True width of miner alization zones is estimated at about 

80% of drill intervals based on current understanding of the re lationship between drill direction 

and the mineralized structures.