Monday, September 14, 2026
MiningNewsTerminal
Monday, September 14, 2026 Admin

NTMC.CN ·

Neotech Metals Drills 214m of 0.67% TREO, 21.2 g/t Gallium, 21.9 g/t Tantalum and 0.1% NbO at Hecla-Kilmer

Drill Results

Neotech Metals Drills 214m of 0.67% TREO,

21.2 g/t Gallium, 21.9 g/t Tantalum and 0.1%

NbO at Hecla-Kilmer

Vancouver, British Columbia--(Newsfile Corp. - April 21, 2026) - Neotech Metals Corp. (CSE: NTMC)

(OTCQB: NTMFF) (FSE: V690) (

"Neotech"

or

"the Company"

) is pleased to report the first round of

drill results from its 2025 drill campaign at its 100% owned Hecla-Kilmer Rare Earth Project in Ontario,

Canada, where the Company completed 20 holes totaling approximately 8,000 metres of drilling and re-

logged and re-assayed approximately 1,980 metres of historical core drilled by VR Resources Ltd., with

those results expected to be incorporated into the Company's Maiden Resource Estimate (

"MRE"

) in

2026.

Neotech is reporting assay results from the Southern Pike Zone, which was planned to both test

mineralized zones for continuity and extend the zone further south of hole HK24-034 drilled in the 2024

drill campaign. The Company will continue to release results in the coming weeks as additional assay

data is received, compiled, and interpreted, with further updates expected to provide a more complete

picture of the scale and continuity of mineralization across the 2025 drill campaign.

Table 1 showing South Pike Zone Drill Results.

Hole

From (m)

To (m)

Interval (m)

TREO* (%)

Ga

O

(g/t)

Ta

O

(g/t)

Nb

O

(%)

HK24-034

44

208

164

0.7

35.6

21

-

HK25-048

95.5

310.4

214.9

0.67

21.1

21.9

0.1

HK25-040

63.17

153.3

90.13

0.47

20.7

25.9

0.11

HK25-051

182

313

131

0.51

23.8

-

-

HK25-037

36.8

129

92.2

0.44

22.2

15.6

-

Map 1 showing Pike Zone drill pads at Hecla-Kilmer.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/9768/293395_neotech.jpg

"We are pleased to continue defining long, broad zones of continuous mineralization from surface and

shallow depths at Hecla Kilmer, creating significant value and further highlighting the scale of this unique

system," said Reagan Glazier, CEO of Neotech Metals. "The consistent gallium values within these

intercepts are particularly important, given gallium's growing role in semiconductor supply chains and

green energy transition technologies. We are proud to be uncovering a unique critical minerals asset

with the potential to contribute to the onshoring and security of the essential building blocks needed for

today's advanced and clean energy technologies."

Table 2 showing hole locations, orientations, and total depths.

Hole ID

Easting

Northing

Dip

Azimuth

Total Depth (m)

HK25-037

437555

5575218

-60

60

327

HK25-040

437554

5575104

-45

120

406

HK25-048

437412

5575343

-50

90

348

HK25-051

437680

5575190

-50

255

420

HK24-034

437553

5575215

-50

120

387

Methodology and Quality Assurance/Quality Control ("QA/QC")

Drillholes were drilled with either NQ or NTW core diameters at various inclined angles, and the reported

assay intervals represent downhole core lengths. The true thickness of the mineralization is unknown at

this time. The material produced from the diamond drillholes was sampled at two metre intervals with the

core split in half, resulting in average sample sizes of 2-4 kg. Half of the core is sent to the analytical

laboratory, and the other half is kept in storage as required by industry standards and by Ontario

provincial regulations. The original core was logged, photographed, and sampled on location by

Neotech personnel.

The bagged and catalogued samples were delivered to Activation Laboratories Ltd. (

"Actlabs"

) in

Timmins, Ontario, for initial preparation and final analysis. All sample preparation and analytical work

referenced in this report were conducted by Actlabs, an independent geoanalytical laboratory accredited

to ISO-IEC 17025:2017 and ISO 9001:2015 standards. In addition to Actlabs' internal QA/QC protocols,

Neotech Metals incorporated its own control samples in each batch submitted for analysis.

Quality control samples, including blanks, duplicates, and standards (Certified Reference Materials)

were inserted into the sample series at set intervals. For all analysis methods, the minimum number of

QA/QC samples was

two

CRM standards per hole,

one

duplicate and/or

one

blank for every 10

samples taken, for a total of 10% QA/QC samples for the entire dataset. The procedures were

implemented during the sample collection, preparation and analytical stages to ensure the robustness

and reliability of the analytical results. QA/QC data was also verified by an independent third party to

ensure the validity of the datasets.

All analytical results reported herein have passed internal QA/QC review and compilation. All assay

results of drill core samples were provided by Actlabs, a Certified Laboratory, which performed their

measure of the concentration of rare earth elements (REE) with the analytical method that uses lithium

borate fusion prior to the second stage sodium peroxide fusion and Inductively Coupled Plasma Mass

Spectrometry (ICP-MS). Major Element Oxides were done using the lithium borate analytical method and

Inductively Coupled Plasma Optical Emission Spectroscopy (ICP-OES).

The QA/QC program has been designed in accordance with the

Canadian Institute of Mining,

Metallurgy and Petroleum

(CIM) Exploration Best Practice Guidelines. The procedures implemented

are considered appropriate, accurate, and reliable for this style of mineralization, ensuring the integrity

and quality of the assay data

ON BEHALF OF THE BOARD

Reagan Glazier, Chief Executive Officer and Director

Neotech Metals Corp.

About the Neotech Metals

Neotech Metals Corp. is a mineral exploration company dedicated to discovering and developing

valuable mineral resources within promising jurisdictions around the world. With a strong commitment to

environmental stewardship and sustainable practices, Neotech is positioned to make a positive impact

while maximizing the potential of its exploration properties.

The company has a diversified portfolio of Rare-Earth Element and Rare Metals projects, including the

Hecla-Kilmer, located 20 km from the Otter Rapids 180MW hydroelectric power generation station and

active Ontario Northway railway, along with its TREO and Foothills projects located in British Columbia.

All three projects are 100% wholly-owned.

Qualified Person

Technical Information for this news release has been prepared in accordance with the Canadian

regulatory requirements set out in National Instrument 43-101. Jared Galenzoski VP Exploration, P.Geo.,

FIMMM and Qualified Person, has reviewed and approved all of the data and statements made for this

news release.

Contact Information

Reagan Glazier, CEO and Director

[email protected]

+1 403-815-6663

*

TREO (Total Rare-Earth Oxides) has been used to express the results in the press release. TREO is calculated by converting the elemental

ppm to Rare-Earth Oxides using a conversion factor and is the summation of CeO

2

+ La

2

O

3

+ Pr

6

O

11

+ Nd

2

O

3

+ Sm

2

O

3

+ Eu

2

O

3

+ Gd

2

O

3

+

Tb

4

O

7

+ Dy

2

O

3

+ Ho

2

O

3

+ Er

2

O

3

+ Tm

2

O

3

+ Yb

2

O

3

+ Lu

2

O

3

+ Y

2

O

3

.

**

PMREO (Permanent Magnet Rare-Earth Oxides) has been used to express the results in the press release. TREO is calculated by converting

the elemental ppm to Rare-Earth Oxides using a conversion factor and is the summation of Pr

6

O

11

+ Nd

2

O

3

+ Tb

4

O

7

+ Dy

2

O

3

Forward-Looking Statements

Certain information contained herein constitutes "forward-looking information" under Canadian

securities legislation. Generally, forward-looking information can be identified by the use of forward-

looking terminology such as "will", "will be" or variations of such words and phrases or statements that

certain actions, events or results "will" occur. Forward-looking statements are based on the opinions and

estimates of management as of the date such statements are made and they are from those expressed

or implied by such forward-looking statements or forward-looking information subject to known and

unknown risks, uncertainties and other factors that may cause the actual results to be materially different,

including receipt of all necessary regulatory approvals. Although management of the Company have

attempted to identify important factors that could cause actual results to differ materially from those

contained in forward-looking statements or forward-looking information, there may be other factors that

cause results not to be as anticipated, estimated or intended. There can be no assurance that such

statements will prove to be accurate, as actual results and future events could differ materially from those

anticipated in such statements. Accordingly, readers should not place undue reliance on forward- looking

statements and forward-looking information. The Company will not update any forward-looking

statements or forward-looking information that are incorporated by reference herein, except as required

by applicable securities laws.

The CSE has not reviewed, approved, or disapproved the contents of this press release.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/293395