Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NTMC.CN ·

Neotech Metals Corp. Reports 190 Meters of 0.23% Nb2O5 and 0.41% TREO Including 54 Meters of 0.32% Nb2O5 and 0.54% TREO at the Western Pike Zone Boundary at Hecla-Kilmer and Completes Debt Conversion

Drill Results

Neotech Metals Corp. Reports 190 Meters of

0.23% Nb2O5 and 0.41% TREO Including 54

Meters of 0.32% Nb2O5 and 0.54% TREO at the

Western Pike Zone Boundary at Hecla-Kilmer

and Completes Debt Conversion

Vancouver, British Columbia--(Newsfile Corp. - April 22, 2025) - Neotech Metals Corp. (CSE: NTMC)

(OTCQB: NTMFF) (FSE: V690) (

"Neotech"

or

"the Company"

) is pleased to announce additional

geochemical assay results from its exploratory diamond drilling program of the Niobium and Rare Earth

Element (

"REE"

) carbonatites located at the Hecla-Kilmer ("

H/K"

) Project near to Otter Rapids in

Northern Ontario. The Company also has completed e a shares-for-debt settlement.

Neotech is reporting assay results from three drill holes: HK24-028 from the West Pike Zone, HK24-030

from the South Rim, and HK24-025 from the Northeast Rim of the Hecla-Kilmer Project. These holes

were part of a broader 12-hole program totaling 5,047 meters, completed during the Fall 2024 drill

campaign. The 2024 drill program (see Figures 1 & 2) was designed to test for intervals of Total Rare

Earth Oxide ("

TREO

") and Niobium Oxide ("

Nb

O

") within the alkaline intrusive carbonatite complex.

Highlights from HK24-028 (Western Pike Zone)

From (m)

To (m)

Interval (m)

TREO* (%)

Nb2O5 (%)

106

296

190

0.41

0.23

-Including-

214

268

54

0.54

0.32

Reagan Glazier, CEO, said in comment, "We are pleased to report another strong set of drill results that

reinforce the scale and continuity of rare earth and critical mineralization at Hecla-Kilmer. These broad

intercepts, coupled with the recently announced positive metallurgical results, position Hecla-Kilmer as a

highly compelling, strategically important domestic rare earth project. As global concerns surrounding the

secure supply of critical minerals continue to intensify, the combination of promising leachability and

potential large-scale mineralization underscores Hecla-Kilmer's value as a foundational asset in the

North American supply chain. With the system open in multiple directions, we remain focused on

advancing exploration and unlocking its full potential."

Map figure 1 - Pike Zone drill collars and associated drill results.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/9768/248996_6f7d72c8d44f58aa_001full.jpg

Highlights from HK24-030 (South Rim Prospect)

From (m)

To (m)

Interval (m)

TREO* (%)

Nb2O5(%)

48

64

16

0.41

0.28

-And-

196

210

14

0.40

0.20

-And-

218

246

28

0.52

0.09

Highlights from HK24-025 (East Rim Prospect)

From (m)

To (m)

Interval (m)

TREO* (%)

182

256

160

0.33

Map figure 2 - Regional drill map showing the extent of all drill testing thus far at Hecla-Kilmer.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/9768/248996_6f7d72c8d44f58aa_002full.jpg

The 2024 exploration drill program was designed to confirm and validate the previous geophysical

surveys that were conducted at Hecla Kilmer in 2020 as well as to identify the structures and mineralized

zones present as a preliminary assessment of the site.

The results are currently being evaluated to

identify potential next phases of development for Hecla-Kilmer.

Technical studies will continue in order to

advance metallurgical testing and other project assessments for the site.

Upcoming 2025 Exploration Program

Future exploration programs will be guided by the ongoing integration of field data to refine geological,

geochemical, and structural models, with the goal of identifying and prioritizing new targets for

evaluation. Additional metallurgical test work will also continue to support project advancement and

inform potential development pathways.

The Company wishes to focus on additional drilling to delineate a resource to further develop the asset

at Hecla-Kilmer. The company also has a drill program slated for its TREO project (fully funded) to test

the high-grade mineralization found in bedrock samples from its 2024 field program.

Methodology and Quality Assurance/Quality Control ("QA/QC")

Drillholes were drilled with either NQ or NTW core diameters at various inclined angles, and the reported

assay intervals represent downhole core lengths. The true thickness of the mineralization is unknown at

this time. The material produced from the diamond drillholes was sampled at two metre intervals with the

core split in half, resulting in average sample sizes of 2-4 kg. Half of the core is sent to the analytical

laboratory, and the other half is kept in storage as required by industry standards and by Ontario

provincial regulations. The original core was logged, photographed, and sampled on location by

Neotech personnel.

The bagged and catalogued samples were delivered to Activation Laboratories Ltd. (

"Actlabs"

) in

Timmins, Ontario, for initial preparation and final analysis. All sample preparation and analytical work

referenced in this report were conducted by Actlabs, an independent geoanalytical laboratory accredited

to ISO-IEC 17025:2017 and ISO 9001:2015 standards. In addition to Actlabs' internal QA/QC protocols,

Neotech Metals incorporated its own control samples in each batch submitted for analysis.

Quality control samples, including blanks, duplicates, and standards (Certified Reference Materials)

were inserted into the sample series at set intervals. For all analysis methods, the minimum number of

QA/QC samples was

two

CRM standards per hole,

one

duplicate and/or

one

blank for every 10

samples taken, for a total of 10% QA/QC samples for the entire dataset. The procedures were

implemented during the sample collection, preparation and analytical stages to ensure the robustness

and reliability of the analytical results. QA/QC data was also verified by an independent third party to

ensure the validity of the datasets.

All analytical results reported herein have passed internal QA/QC review and compilation. All assay

results of drill core samples were provided by Actlabs, a Certified Laboratory, which performed their

measure of the concentration of rare earth elements (REE) with the analytical method that uses lithium

borate fusion prior to the second stage sodium peroxide fusion and Inductively Coupled Plasma Mass

Spectrometry (ICP-MS). Major Element Oxides were done using the lithium borate analytical method and

Inductively Coupled Plasma Optical Emission Spectroscopy (ICP-OES).

The QA/QC program has been designed in accordance with the

Canadian Institute of Mining,

Metallurgy and Petroleum

(CIM) Exploration Best Practice Guidelines. The procedures implemented

are considered appropriate, accurate, and reliable for this style of mineralization, ensuring the integrity

and quality of the assay data.

Debt Settlement

The Company also announces that it has settled $139,313.23 in debt owed, in consideration for the

issuance of 1,160,944 common shares of the Company (the "

Shares

") at a deemed price of $0.12 per

Share (the "

Debt Settlement

"). The Company has effected the Debt Settlement to preserve its cash for

working capital.

The Debt Settlement will constitute a "related party transaction" for the purposes of Multilateral Instrument

61-101 -

Protection of Minority Security Holders in Special Transactions

("

MI 61-101

"), given 0695809

BC Ltd. is a company wholly-owned by Robert Krause (65,625 Shares), Canmex Consulting & Leasing

is a company wholly-owned by Brian Thurston (21,875 Shares) (both directors of the Company) and

Philip Ellard, the Company's CFO (52,000 Shares). The Company is relying upon exemptions from the

formal valuation and minority shareholder approval requirements under MI 61-101 in respect of the Debt

Settlement, on the basis that no securities of the Company are listed on a "specified market" (Section

5.5(b) of MI 61-101) and the fair market value of the Debt Settlement does not exceed $2,500,000

(Section 5.7(1)(b) of MI 61-101). Neither the Company, nor, to the knowledge of the Company after

reasonable inquiry, have knowledge of any material information concerning the Company or its

securities that has not been generally disclosed. The Company did not file a material change report

more than 21 days before the date on which the Debt Settlement was agreed upon in order to secure the

Debt Settlement in an expeditious manner.

The Shares issued in connection with the Debt Settlement will not be subject to a hold period as

approved by the Canadian Securities Exchange.

ON BEHALF OF THE BOARD

Reagan Glazier, Chief Executive Officer and Director

Neotech Metals Corp.

About the Neotech Metals

Neotech Metals Corp. is a mineral exploration company dedicated to discovering and developing

valuable mineral resources within promising jurisdictions around the world. With a strong commitment to

environmental stewardship and sustainable practices, Neotech is positioned to make a positive impact

while maximizing the potential of its exploration properties.

The company has a diversified portfolio of Rare-Earth Element and Rare Metals projects, including the

Hecla-Kilmer, located 20 km from the Otter Rapids 180MW hydroelectric power generation station and

active Ontario Northway railway, along with its TREO and Foothills projects located in British Columbia.

All three projects are 100% wholly-owned.

Qualified Person

Technical Information for this news release has been prepared in accordance with the Canadian

regulatory requirements set out in National Instrument 43-101. Jared Galenzoski VP Exploration, P.Geo.,

and Qualified Person, has reviewed and approved all of the data and statements made for this news

release.

Contact Information

Reagan Glazier, CEO and Director

[email protected]

+1 403-815-6663

*

TREO (Total Rare-Earth Oxides) has been used to express the results in the press release. TREO is calculated by converting the elemental

ppm to Rare-Earth Oxides using a conversion factor and is the summation of CeO

2

+ La

2

O

3

+ Pr

6

O

11

+ Nd

2

O

3

+ Sm

2

O

3

+ Eu

2

O

3

+ Gd

2

O

3

+

Tb

4

O

7

+ Dy

2

O

3

+ Ho

2

O

3

+ Er

2

O

3

+ Tm

2

O

3

+ Yb

2

O

3

+ Lu

2

O

3

+ Y

2

O

3

.

**

PMREO (Permanent Magnet Rare-Earth Oxides) has been used to express the results in the press release. TREO is calculated by converting

the elemental ppm to Rare-Earth Oxides using a conversion factor and is the summation of Pr

6

O

11

+ Nd

2

O

3

+ Tb

4

O

7

+ Dy

2

O

3

Forward Looking Statements

Certain information contained herein constitutes "forward-looking information" under Canadian

securities legislation. Generally, forward-looking information can be identified by the use of forward-

looking terminology such as "will", "will be" or variations of such words and phrases or statements that

certain actions, events or results "will" occur. Forward-looking statements are based on the opinions and

estimates of management as of the date such statements are made and they are from those expressed

or implied by such forward-looking statements or forward-looking information subject to known and

unknown risks, uncertainties and other factors that may cause the actual results to be materially different,

including receipt of all necessary regulatory approvals. Although management of the Company have

attempted to identify important factors that could cause actual results to differ materially from those

contained in forward-looking statements or forward-looking information, there may be other factors that

cause results not to be as anticipated, estimated or intended. There can be no assurance that such

statements will prove to be accurate, as actual results and future events could differ materially from those

anticipated in such statements. Accordingly, readers should not place undue reliance on forward- looking

statements and forward-looking information. The Company will not update any forward-looking

statements or forward-looking information that are incorporated by reference herein, except as required

by applicable securities laws.

The CSE has not reviewed, approved, or disapproved the contents of this press release.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/248996