Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NTMC.CN ·

Neotech Metals Corp. Drills 86 Meters of 1.06% TREO from Bedrock Surface Approximately 300 Meters from the Pike Zone Mineralized Corridor in Its Inaugural Drill Program at Hecla-Kilmer

Drill Results

Neotech Metals Corp. Drills 86 Meters of 1.06%

TREO from Bedrock Surface Approximately

300 Meters from the Pike Zone Mineralized

Corridor in Its Inaugural Drill Program at

Hecla-Kilmer

Vancouver, British Columbia--(Newsfile Corp. - February 24, 2025) - Neotech Metals Corp. (CSE:

NTMC) (OTCQB: NTMFF) (FSE: V690) (

"Neotech"

or

"the Company"

) is pleased to announce

preliminary geochemical assay results from its exploratory diamond drilling program of the Niobium and

Rare Earth Element (

"REE"

) carbonatites located at the Hecla-Kilmer ("

H/K"

) Project near Otter Rapids

in the James Bay Lowlands of Northern, Ontario.

A total of 12 new drill holes (of which 11 are still to be reported) were completed in 2024 by Neotech to

supplement the 24 legacy drillholes completed by VR Resources ("

VR"

) in previous exploration

campaigns. The 2024 drillholes (

see Map Figure 1

) were designed to test for intervals of Total Rare

Earth Oxide (

"TREO"

) and Niobium Oxide (

"Nb

2

O

5

"

) within the alkaline intrusive carbonatite complex,

targeting 3 primary areas identified through historical magnetic and gravity surveys. Target areas include

the Pike Zone (7 drill holes, 3061 meters), Northeast Zone (3 holes, 1281 meters), and South Rim Zone

(2 holes, 698 meters). Drill hole locations and assays reported in the press release are shown on

Map 1

.

Hole HK24-034, located approximately 300m south of the Pike Zone region, have confirmed the

presence of multiple mineralized intervals that contain elevated levels of niobium and/or rare earth

elements. These intervals are coincident with altered and/or mineralized intervals that were identified

visually by Neotech core loggers in the field. The results for this hole include:

Highlights from HK24-034

From (m)

To (m)

Interval (m)

TREO* (%)

PMREO** (%)

44

130

86

1.06

0.18

184

208

24

0.64

0.12

Sample analysis and data compilation remains ongoing, and any additional mineralized intervals

identified in the remaining drill holes will be reported in subsequent news releases.

"The discovery of bedrock-surface mineralization near the Pike Zone presents significant opportunities

for the Hecla-Kilmer Project," stated CEO Reagan Glazier. "The strong PMREO values in HK24-034 are

consistent with previous intercepts and highlight a clear path to enhancing the project's overall value."

Map Figure 1 - Drill Map of Hecla-Kilmer's Pike Zone from 2024 Drill Season

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/9768/241860_c65e6edd04fb7960_001full.jpg

Methodology and Quality Assurance/Quality Control ("QA/QC")

Drillholes were drilled at various inclined angles with the assay intervals as total core widths. The

material produced from the diamond drillholes was sampled at two metre intervals with the core split in

half, resulting in average sample sizes of 2-4 kg. Half of the core is sent to the analytical laboratory, and

the other half is kept in storage as required by industry standards and by Ontario provincial regulations.

The original core was logged, photographed, and sampled on location by Neotech personnel.

The bagged and catalogued samples were delivered to Activation Laboratories Ltd. (

"Actlabs"

) in

Timmins, Ontario, for initial preparation and final analysis. All sample preparation and analytical work

referenced in this report were conducted by Actlabs, an independent geoanalytical laboratory accredited

to ISO-IEC 17025:2017 and ISO 9001:2015 standards. In addition to Actlabs' internal QA/QC protocols,

Neotech Metals incorporated its own control samples in each batch submitted for analysis.

Quality control samples, including blanks, duplicates, and standards (Certified Reference Materials)

were inserted into the sample series at set intervals. For all analysis methods, the minimum number of

QA/QC samples was

two

CRM standards per hole,

one

duplicate and/or

one

blank for every 10

samples taken, for a total of 10% QA/QC samples for the entire dataset. The procedures were

implemented during the sample collection, preparation and analytical stages to ensure the robustness

and reliability of the analytical results. QA/QC data was also verified by an independent third party to

ensure the validity of the datasets.

All analytical results reported herein have passed internal QA/QC review and compilation. All assay

results of drill core samples were provided by Actlabs, a Certified Laboratory, which performed their

measure of the concentration of rare earth elements (REE) with the analytical method that uses lithium

borate fusion prior to the second stage sodium peroxide fusion and Inductively Coupled Plasma Mass

Spectrometry (ICP-MS). Major Element Oxides were done using the lithium borate analytical method and

Inductively Coupled Plasma Optical Emission Spectroscopy (ICP-OES).

Upcoming 2025 Exploration Season

Neotech is currently developing plans for an expansion/resource-definition drilling program and

preliminary mineralogical-metallurgical test work on the diamond drill core from this program. Ongoing

geological modelling and targeting will continue as the Company receives additional assays.

ON BEHALF OF THE BOARD

Reagan Glazier, Chief Executive Officer and Director

Neotech Metals Corp.

About the Neotech Metals

Neotech Metals Corp. is a mineral exploration company dedicated to discovering and developing

valuable mineral resources within promising jurisdictions around the world. With a strong commitment to

environmental stewardship and sustainable practices, Neotech is positioned to make a positive impact

while maximizing the potential of its exploration properties.

The company has a diversified portfolio of Rare-Earth Element and Rare Metals projects, including the

Hecla-Kilmer, located 20 km from the Otter Rapids 180MW hydroelectric power generation station and

active Ontario Northway railway, along with its TREO and Foothills projects located in British Columbia.

All three projects are 100% wholly-owned.

Qualified Person

Technical Information for this news release has been prepared in accordance with the Canadian

regulatory requirements set out in National Instrument 43-101. Jared Galenzoski VP Exploration, P.Geo.,

and Qualified Person, has reviewed and approved all of the data and statements made for this news

release.

Contact Information

Reagan Glazier, CEO and Director

[email protected]

+1 403-815-6663

*

TREO (Total Rare-Earth Oxides) has been used to express the results in the press release. TREO is calculated by converting the elemental

ppm to Rare-Earth Oxides using a conversion factor and is the summation of CeO

2

+ La

2

O

3

+ Pr

6

O

11

+ Nd

2

O

3

+ Sm

2

O

3

+ Eu

2

O

3

+ Gd

2

O

3

+

Tb

4

O

7

+ Dy

2

O

3

+ Ho

2

O

3

+ Er

2

O

3

+ Tm

2

O

3

+ Yb

2

O

3

+ Lu

2

O

3

+ Y

2

O

3

.

**

PMREO (Permanent Magnet Rare-Earth Oxides) has been used to express the results in the press release. TREO is calculated by converting

the elemental ppm to Rare-Earth Oxides using a conversion factor and is the summation of Pr

6

O

11

+ Nd

2

O

3

+ Tb

4

O

7

+ Dy

2

O

3

Forward-Looking Statements

Certain information contained herein constitutes "forward-looking information" under Canadian

securities legislation. Generally, forward-looking information can be identified by the use of forward-

looking terminology such as "will", "will be" or variations of such words and phrases or statements that

certain actions, events or results "will" occur. Forward-looking statements are based on the opinions and

estimates of management as of the date such statements are made and they are from those expressed

or implied by such forward-looking statements or forward-looking information subject to known and

unknown risks, uncertainties and other factors that may cause the actual results to be materially different,

including receipt of all necessary regulatory approvals. Although management of the Company have

attempted to identify important factors that could cause actual results to differ materially from those

contained in forward-looking statements or forward-looking information, there may be other factors that

cause results not to be as anticipated, estimated or intended. There can be no assurance that such

statements will prove to be accurate, as actual results and future events could differ materially from those

anticipated in such statements. Accordingly, readers should not place undue reliance on forward- looking

statements and forward-looking information. The Company will not update any forward-looking

statements or forward-looking information that are incorporated by reference herein, except as required

by applicable securities laws.

The CSE has not reviewed, approved, or disapproved the contents of this press release.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/241860