Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NTH.V ·

Canada Cobalt Launches Pilot Plant, Closes $1.5 Million Financing

Financings Metallurgy & Processing

Canada Cobalt Launches Pilot Plant, Closes

$1.5 Million Financing

COQUITLAM, BC

,

July 25, 2018

/CNW/ - Canada Cobalt Works Inc. (TSX-V: CCW) (OTCPK:

TAKRF) (

Frankfurt

: 4T9B) (the "Company" or "Canada Cobalt") is pleased to provide a corporate

and exploration/development update as the Company accelerates its activities in the prolific Northern

Ontario Cobalt Camp.

Highlights:

Pilot plant assembly at the Castle mine is proceeding ahead of schedule with the jaw crusher,

cone crusher and ball mill having been wired and commissioned. Mineralized material from the

first level of the mine is now being crushed, while gravity and screen equipment is expected to

be operational in the coming days;

Underground drilling targeting high-grade cobalt continues (25 holes completed to date) and is

being extended through the balance of 2018 - a consistent flow of results will commence this

quarter;

The company has closed a private placement with strategic investors in the amount of

$1,449,054

at

65 cents

per unit (further details below) and is well-positioned and financed to

achieve key milestones in 2018.

Jacques Monette

, Canada Cobalt director and mine supervisor, commented: "Underground and pilot

plant crews are doing an exceptional job. Shaft #3 has also been opened for a pump test as part of

a study requirement related to permitting for a potential 600 tpd milling operation."

Gravity concentrates will be shipped from the Castle mine site to SGS Lakefield in

Peterborough,

Ontario

, for conversion into a

Cobalt

sulphate product through the company's proprietary Re-2OX

process. Canada Cobalt eagerly anticipates updating shareholders on Re-2OX during the first half

of August.

Private Placement Details

The Company has issued 2,229,314 units at a purchase price of

$0.65

per unit for total proceeds of

$1,449,054

. Each unit comprises one common share and one half of one share purchase warrant.

Each whole warrant will entitle the holder thereof to purchase one additional common share of the

Company at an exercise price of

$0.90

per share for a period of two years from closing, subject to

TSX Venture Exchange ("Exchange") approval.

Finder's fees were paid in connection with the private placement in the amount of

$36,629.97

in cash

and 56,354 broker warrants on the same terms as the purchaser warrants, subject to Exchange

approval.

All securities issued in connection with the private placement are subject to a four-month-and-a-day

hold period expiring

November 26, 2018

, in accordance with applicable securities laws.

Proceeds of the private placement will go toward the expanded underground drilling and cobalt

sulphate programs at the past producing Castle mine near

Gowganda, Ontario

, and for general

working capital purposes.

Qualified Person

The technical information in this news release was prepared under the supervision of

Frank J. Basa

,

P.Eng., Canada Cobalt's President and Chief Executive Officer, who is a member of Professional

Engineers Ontario and a qualified person in accordance with National Instrument 43-101.

About Canada Cobalt Works Inc.

Canada

Cobalt

is a pure play cobalt company focused exclusively on the Northern Ontario Cobalt

Camp,

Canada's

most prolific cobalt district. With three 100%-owned past producing mines, a

proprietary hydrometallurgical process known as Re-2OX, and plans for a 600-tonne-per-day mill at

its flagship Castle Property near

Gowganda, Canada

Cobalt

is strategically positioned to become a

vertically integrated North American leader in cobalt extraction and recovery.

"Frank J. Basa"

Frank J. Basa

, P. Eng.

President and Chief Executive Officer

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release. This news release may contain forward-looking statements including but not limited to

comments regarding the timing and content of upcoming work programs, geological interpretations,

receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements

address future events and conditions and therefore, involve inherent risks and uncertainties. Actual

results may differ materially from those currently anticipated in such statements.

SOURCE

Canada Cobalt Works Inc.

View original content: http://www.newswire.ca/en/releases/archive/July2018/25/c3533.html

%SEDAR: 00022378E

For further information:

Frank J. Basa, P.Eng., President and CEO at 1-819-797-4144, or Wayne

Cheveldayoff, Investor Relations, [email protected], 416-710-2410

CO: Canada Cobalt Works Inc.

CNW 20:00e 25-JUL-18