Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NRM.V ·

Noram Prepares Phase Iv Drill Program ON ZEUS Property Clayton Valley to Expand Resource and Closes Financing

Financings Resource Estimates Exploration Programs

TSX.V: NRM

Frankfurt: N7R

OTCPINK: NRVTF

FOR IMMEDIATE RELEASE

NORAM PREPARES PHASE IV DRILL PROGRAM ON ZEUS PROPERTY

CLAYTON VALLEY TO EXPAND RESOURCE AND CLOSES FINANCING

Vancouver, British Columbia – October 17, 2019 – Noram Ventures Inc. (“Noram”) (TSX - Venture: NRM

/ Frankfurt: N7R / OTCPINK: NRVTF ) is pleased to announce that it has closed a financing for gross

proceeds of $210, 500 by issuing 3, 827,273 units at a price of $0.055 per unit. Each unit consists of one

common share and one transferrable share purchase warrant exercisable for $0.07 for 5 years from the date

of closing. All warrants will be su bject to a statutory hold period of 4 months plus a day from the date of

closing.

Insiders of the Company purchased 2,227,273 units for gross proceeds of $ 122,500. The balance of units

were subscribed for by existing shareholders of the Company. TSX Venture Exchange approval was received

on October 16, 2019. Proceeds from the placement will be used for general working capital and to initiate

the next phase of drilling on the Zeus Property.

NI 43-101 Compliant Inferred Mineral Resource Estimate

On March 28, 2019, the Company filed a NI 43-101 Technical Report: “Updated Inferred Lithium Mineral

Resouce Estimate, Zeus Project, Clayton Valley, Esmeralda County, Nevada, USA ” (the “Report”) on its

SEDAR Issuer Profile page.

The Report incorporates the results of three phases of drilling from 2016 to 2018, including sixty drill holes.

The reported Inferred Mineral Resource estimate indicates zones with higher lithium contents continue from

the resource to the south and east and that the higher grade parts of the deposit remain open at depth. Drilling

only tested approximately one third of the area covered by the Zeus claim block.

The model resource estimate has an Inferred Mineral Resource of approximately 330 million metric

tonnes at a grade of 858 ppm Li, or 1.5 million tonnes of lithium carbonate equivalent. The deposit has

a very low stripping ratio of 0.1:1, and constitutes unconsolidated to poorly consolidated material at surface

that does not require blasting. Sensitivity analyses for the modeled deposit are listed in Table 1.

Noram Ventures Inc.

Suite 2150 - 555 West Hastings Street, Vancouver, BC, Canada, V6B 4N6

Tel.: 604-553-2279 | Website: www.noramventures.com | email: [email protected]

The sensitivity analysis for a 900 ppm Li cutoff yields 145 million metric tonnes at a grade of 1145 ppm

Li in a contiguous volume in the northwest part of the claim block.

Drills Mobilized and Phase IV Drill Program Initiated

The Company is already permitted to drill the Zeus Property and is actively drilling a fourth phase of

exploratory holes. This drill program will include the drilling of 7 core holes to approximate depths of 300 ft

per hole. To date, Noram has drilled the majority of the 60 holes to depths not beyond approximately 100 ft.

Each of the locations were carefully selected based on high grade mineralization present at the bottom of

existing neighbouring holes. The Company expects to increase the size of the current inferred mineral

resource once this phase is succussefully completed.

Results from Phase IV will be integrated into the drill data for a future Preliminary Economic Assessment

that will also address lithium extraction methodology and mining -related economics. Initial leaching tests

conducted in 2018 determined that the Zeus lithium clays are non-refractory and yield >80% of their lithium

at moderate temperatures and moderate amounts of sulfuric acid.

Noram management notes that the pilot plant studies for other Nevada lithium clay deposits are advancing

well at Thacker Pass (Lithium Americas Corp.) and at Rhyolite Ridge (Ioneer Ltd.). In Clayton Valley,

Noram’s neighbor Cypress Development Corp. has published operating costs for processing lithium clays at

$US3,983/tonne lithium carbonate, with current prices of lithium carbonate (99.5% pure) at $11,000/tonne.

The technical information contained in this news release has been reviewed and approved by Bradley C.

Peek, MSc and Certified Professional Geologist who is a Qualified Person with respect to Noram’s Clayton

Valley Lithium Project as defined under National Instrument 43-101.

About Noram Ventures Inc.

Noram Ventures Inc. (TSX - Venture: NRM / Frankfurt: N7R / OTC PINK: NRVTF) is a Canadian based

junior exploration company, with a goal of developing lithium deposits and becoming a low - cost supplier.

The Company’s primary business focus since formation has be en the exploration of mineral projects.

Noram’s long term strategy is to build a multi-national lithium minerals company to produce and sell lithium

into the markets of Europe, North America and Asia.

Please visit our web site for further information: www.noramventures.com

ON BEHALF OF THE BOARD OF DIRECTORS

/s/ “Anita Algie”

Chief Financial Officer

Direct: (604) 553-2279

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the

adequacy or accuracy of this release. This news release may contain forward-looking information which is not comprised of historical facts. Forward-looking information

involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportuni ties to differ materially from those expressed

or implied by such forward -looking information. Forward -looking information in this news release includes statements regarding, among other things, the completion

transactions completed in the Agreement. Factors that could cause actual results to differ mat erially from such forward -looking information include, but are not limited

to, regulatory approval processes. Although Noram believes that the assumptions used in preparing the forward -looking information in this news release are reasonable,

including that all necessary regulatory approvals will be obtained in a timely manner, undue reliance should not be placed on such informati on, which only applies as of

the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Noram disclaims any intention or obligation

to update or revise any forward -looking information, whether as a result of new information, future events or otherwise, other than as required by applicable securities

laws.