Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NRM.V ·

Noram Initial Drill Result Values Higher Than Current Inferred Resource ON ZEUS Property Clayton Valley, Nevada, USA

Drill Results Resource Estimates

TSX.V: NRM

Frankfurt: N7R

OTCPINK: NRVTF

FOR IMMEDIATE RELEASE

NORAM INITIAL DRILL RESULT VALUES HIGHER THAN CURRENT INFERRED

RESOURCE ON ZEUS PROPERTY CLAYTON VALLEY, NEVADA, USA

Vancouver, British Columbia – January 15, 2020 – Noram Ventures Inc. (“Noram”) (TSX - Venture: NRM

/ Frankfurt: N7R / OTCPINK: NRVTF ) is pleased to announce the results for three of six drill holes

completed during the November 2019 Phase IV drill program on the Zeus lithium claystone property.

The results for drill holes 47, 50 and 53 are given in table 1 below and shown in simplified drill logs in figure

2. Drill hole 47 returned results of 29 meters at 1164 ppm Li, and drill hole 53 showed 54.9 m at 1186 ppm

Li immediately below the 2019 -02 inferred resource. These values are higher than the current inferred

resource of 145 million tonnes at 1145 ppm Li (900 ppm cutoff: Peek and Barrie, 2019, see

www.noramventures.com).

Table 1.

Phase IV Drilling Results - 47, 50, 53

Deepened Portions of Holes (New Drilling)

Minimum Maximum Weighted

From To Interval Li Li Average Li

Core Hole (m) (m) (m) (ppm) (ppm) (ppm)

CVZ-47-RD 29.6 101.2 71.6 570 1750 1004

CVZ-48-RD 29.6 49.4 19.8 - - pending

CVZ-50-RD 29.6 64.6 35.0 215 1080 513

CVZ-51-RD 22.9 119.5 96.6 - - pending

CVZ-52-RD 29.0 79.9 50.9 - - pending

CVZ-53-RD 29.6 107.3 77.7 438 2040 1070

Entire Holes

Minimum Maximum Weighted

From To Interval Li Li Average Li

Core Hole (m) (m) (m) (ppm) (ppm) (ppm)

CVZ-47 4.6 101.2 96.6 570 1750 1020

CVZ-48 0.0 49.4 49.4 - - pending

CVZ-50 3.0 64.6 61.6 215 1270 713

CVZ-51 0.6 119.5 118.9 - - pending

CVZ-52 0.0 79.9 79.9 - - pending

CVZ-53 2.9 107.3 104.4 438 2260 1072

Noram Ventures Inc.

Suite 2150 - 555 West Hastings Street, Vancouver, BC, Canada, V6B 4N6

Tel.: 604-553-2279 | Website: www.noramventures.com | email: [email protected]

Figure 1. Google Earth image of Zeus lithium property, Clayton Valley, Nevada, adjacent to Albemarle’s lithium brine operations to

west (see evaporation pond to upper left). The Esmeralda Formation lithium claystone is under a thin (0-5 m-thick) veneer of alluvium

shed off of high hills to the east. The contours represent the 300 ppm, 600 ppm and 900 ppm cutoff lines for the NI43-101 resource

estimate which included 145 million tonnes @1145 ppm Li (900 ppm cut -off, = 0.88 million tonnes lithium carbonate equivalen t;

Peek and Barrie, 2019; see www.noramventures.com).

Noram Ventures Inc.

Suite 2150 - 555 West Hastings Street, Vancouver, BC, Canada, V6B 4N6

Tel.: 604-553-2279 | Website: www.noramventures.com | email: [email protected]

Figure 2a. Summary log for drill hole CVZ-47, with lithium values.

Noram Ventures Inc.

Suite 2150 - 555 West Hastings Street, Vancouver, BC, Canada, V6B 4N6

Tel.: 604-553-2279 | Website: www.noramventures.com | email: [email protected]

Figure 2b. Summary log for drill hole CVZ-50, with lithium values.

Figure 2c. Summary log for drill hle CVZ-53, with lithium values.

Noram’s Zeus lithium property is located in Clayton Valley, Nevada, immediately adjacent and to the east of

Albemarle’s Silver Peak lithium brine operations, currently North America’s only lithi um producer. The

lithium deposit is within the non-refractory claystones of the Esmeralda Formation, and has access to power,

groundwater and a capable work force. Nevada is recognized as one of the most favorable jurisdictions for

mineral extraction globally.

The Phase IV drill program was designed to test the Esmeralda Formation claystone beneath earlier drill

holes that extended only to ~30 meters depth (Figure 1). This program indicates that the favorable claystone

sub-units continue to depth, and are thicker and possibly higher grade to the southeast.

The Phase IV drill program followed NI 43-101 procedures for sample preparation, analyses and security as

described in Peek and Barrie (2019). All samples were sent to ISO -17025 accredited ALS Laboratories in

Reno, Nevada for analysis. Each sample was then analyzed using ALS’ ME-MS61 analytical method which

uses a Four Acid Digestion and MS-ICP technologies.

Noram President and CEO C. Tucker Barrie comments: “Our immediate goal is to outline a viable lithium

resource that can support a mining operation that can produce 20,000 tonnes lithium carbonate per annum for

20+ years, to support the growing lithium battery and electric vehicle market. We are encouraged by these

Phase IV drill holes which will significantly increase our current resource. The deposit remains open to the

south and east on the property where there is >2 km2 of untested ground. As well, we note the success of our

Noram Ventures Inc.

Suite 2150 - 555 West Hastings Street, Vancouver, BC, Canada, V6B 4N6

Tel.: 604-553-2279 | Website: www.noramventures.com | email: [email protected]

neighbor Cypress Development Corp., which has a similar lithium claystone deposit and is making significant

advances with extraction technology. This bodes well for the development of our Zeus deposit.”

The technical information contained in this news release has been reviewed and approved by Bradley C.

Peek, MSc and Certified Professional Geologist who is a Qualified Person with respect to Noram’s Clayton

Valley Lithium Project as defined under National Instrument 43-101.

About Noram Ventures Inc.

Noram Ventures Inc. (TSX - Venture: NRM / Frankfurt: N7R / OTC PINK: NRVTF) is a Canadian based

junior exploration company, with a goal of developing lithium deposits and becoming a low - cost supplier.

The Company’s primary business focus since formation has been the exploration of mineral projects.

Noram’s long term strategy is to build a multi-national lithium minerals company to produce and sell lithium

into the markets of Europe, North America and Asia.

Please visit our web site for further information: www.noramventures.com

ON BEHALF OF THE BOARD OF DIRECTORS

/s/ “C. Tucker Barrie, Ph.D., P. Geo.”

President and CEO

Office: (604) 553-2279

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news

release may contain forward-looking information which is not comprised of historical facts. Forward-looking

information involves risks, uncertainties and other factors that could cause actual events, results,

performance, prospects and opportunities to differ materially from those expressed or implied by such

forward-looking information. Forward -looking information in this news release includes statements

regarding, among other things, the completion transactions completed in the Agreement. Factors that could

cause actual results to differ materially from such forward -looking information include, but are not limited

to, regulatory approval processes. Although Noram believes that the assumptions used in preparing the

forward-looking information in this news release are reasonable, including that all necessary regulatory

approvals will be obtained in a timely manner, u ndue reliance should not be placed on such information,

which only applies as of the date of this news release, and no assurance can be given that such events will

occur in the disclosed time frames or at all. Noram disclaims any intention or obligation to update or revise

any forward-looking information, whether as a result of new information, future events or otherwise, other

than as required by applicable securities laws.