Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NRM.V ·

NORAM ENGAGES AUTEC INNOVATIVE EXTRACTIVE SOLUTIONS TO PROVIDE AN INDEPENDENT REPORT ON THE MDS MEMBRANE LITHIUM METALLURGICAL TEST PROCESS Noram moving ahead with a 10 tonne bulk process lithium separation tests

Metallurgy & Processing

TSX.V: NRM

Frankfurt: N7R

OTCBB: NRVTF

FOR IMMEDIATE RELEASE

NORAM ENGAGES AUTEC INNOVATIVE EXTRACTIVE SOLUTIONS

TO PROVIDE AN INDEPENDENT REPORT ON THE MDS MEMBRANE LITHIUM

METALLURGICAL TEST PROCESS

Noram moving ahead with a 10 tonne bulk process lithium separation tests

Vancouver, British Columbia – May 31st 2017 – Noram Ventures Inc. (TSX-Venture: NRM / Frankfurt: N7R /

OTCBB: NRVTF ) ("Noram" or the "Company") is pleased to announce it has engaged Autec

Innovative Extractive Solutions to provide an independent report on the MDS membrane lithium metallurgical

bench test process. The focus of the bench test was to substantiate the recovery yield of lithium carbonate

directly from the mineralized clays using MDS’s environmentally friendly system.

Bulk samples weighing approximately 50 kg each were collected from two locations on the Zeus and Hades claim

groups. The first bulk sample was collected from the same locality as samples ZS -2-029 through ZS -2-031 on the

Zeus claims. The previous samples were part of Noram’s Phase II sampling program and were 3 vertical chip samples

that covered a 12 foot (3.66 m) section of stratigraphy. The samples averaged 917 ppm Li. The second bulk sample

was from the spoil pile of the previously announced borehole discovered on the Hades claims (July 22, 2016). Three

samples previously collected from th e spoil pile averaged 933 ppm Li . These lithium rich clay samples were sent to

Membrane Development Specialists LLC (MDS) to test the viability of membrane separation of Lithium from the clay

material.

The technical information contained in this news release has been reviewed and approved by Bradley Peek, MSc and

CPG, who is a Qualified Person as defined under National Instrument 43 -101 with respect to Noram’s Clayton Valley

Claim Group Project.

About AuTec:

As a wholly -owned subsidia ry of Barrick Gold Corporation, AuTec strives to find innovative solutions for the

extractive industry with a particular focus on intrinsic challenges.

AuTec aims to be the first choice for metallurgical test work to support characterization of ores and their suitability to

existing processes. AuTec endeavours to be a major partner in research and development initiatives aimed at making

step-changes to refractory ore processing and to provide crucial site support to Barrick operations and others who may

benefit from the skill sets of AuTec personnel.

About Noram Ventures Inc.:

Noram Ventures Inc (TSX-Venture: NRM / Frankfurt: N7R / OTCBB: NRVTF) is a Canadian based junior

exploration company, with a goal of becoming a force in the Green Energy Revolution through the development of

lithium and graphite deposits and becoming a low -cost supplier for the burgeoning lithium battery industry. The

Company’s primary business focus since formation has been the exploration of mineral projects that include the

lithium projects in Clayton Valley in Nevada and the Jumbo graphite property in British Columbia. Noram’s long term

strategy is to build a multi -national lithium - graphite dominant industrial minerals company to produce and sell

lithium and graphite into the m arkets of Europe, North America and Asia. Please visit our web site for furth er

information: www.noramventures.com

Noram Ventures Inc.

Suite 430 588 Hornby Street Vancouver BC V6C 3B6

Tel.: 604.761.9994 | Website: www.noramventures.com | email: [email protected]

ON BEHALF OF THE BOARD OF DIRECTORS

/s/ “Mark R. Ireton”

President & Director

This news release contains projections and forward -looking information that involve various risks and uncertainties regarding future events. Such

forward-looking information can include without limitation statements based on current expectations involving a number of risks and uncertainties

and are not guarantees of future performance of the Company. The following are important factors that could cause the Compan y’s actual results

to differ materially from those expressed or implied by such forward lookin g statements; the uncertainty of future profitability; and the uncertainty

of access to additional capital. These risks and uncertainties could cause actual results and the Company's plans and object ives to differ materially

from those expressed in the fo rward-looking information. Actual results and future events could differ materially from anticipated in such

information. These and all subsequent written and oral forward -looking information are based on estimates and opinions of management on the

dates they are made and expressed qualified in their entirety by this notice. The Company assumes no obligation to update forward -looking

information should circumstance or management's estimates or opinions change.

Neither the TSX Venture Exchange nor its Re gulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange)

accepts responsibility for the adequacy or accuracy of this release.