Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NOBL.V ·

Noble Plains Uranium Advances Drill Permitting ON Project at the Core of Shirley Basin Uranium District

Permits & Approvals

NOBLE PLAINS URANIUM ADVANCES DRILL PERMITTING ON PROJECT AT THE CORE

OF SHIRLEY BASIN URANIUM DISTRICT

July 3, 2025 – Vancouver, British Columbia – Noble Plains Uranium Corp. (TSX -V: NOBL, OTCQB: NBLXF,

FSE: INE0) (“Noble Plains” or the “Company”) is pleased to announce that it has submitted a drill permit

application for a 15-hole program on the recently optioned Shirley Central Property—just one month after

acquiring the strategic claims. Located in the heart of Wyoming’s Shirley Basin, a prolific and

infrastructure-ready uranium district in the United States, this initiative marks a step forward in the

Company’s strategy to rapidly convert brownfield assets into compliant uranium resources.

The Shirley Central Property is surrounded by two of the most active uranium developers in the United

States—Ur-Energy Inc. and Uranium Energy Corp. (UEC). Several Noble Plains claims lie directly within Ur-

Energy’s permit boundary, while others are encirc led by UEC’s land package, positioning Noble Plains

squarely in the centre of a rapidly evolving production hub. Ur -Energy’s Shirley Basin Project currently

hosts a 43 -101 compliant Measured and Indicated Resource totalling 8.816 million pounds U₃O₈ at an

average grade of 0.23%¹ and is currently under construction².

“This is exactly the kind of brownfield opportunity that aligns with our corporate mission —projects with

historical workings, clear geological upside, and the potential to be fast -tracked into defined resources,”

stated Drew Zimmerman, President of Noble Plains. “With permitting now underway, we are executing on

our plan to advance this asset through focused, modern exploration with the objective of delineating a

compliant resource at Shirley Central.”

Figure 1: Shirley Central Property Drill Targets

Leveraging Historical Work to Accelerate Resource Definition

The Company has identified at least five distinct high -density drilling zones from historical records and

aerial photographs originally produced by Kerr -McGee and others. These areas —positioned between

former producing open -pit mines —feature drill spacing as tight as 25m x 25m, indicative of targeted

delineation for higher-grade uranium mineralization. This historic footprint offers a robust foundation for

a cost-effective and high-confidence drill campaign.

“Given the intensity and precision of historic drilling, we can assess the resource potential with a relatively

limited number of new holes,” commented Paul Cowley, CEO of Noble Plains. “This not only accelerates

our exploration timeline but does so in a capital-efficient manner.”

The Company anticipates that with permitting underway, drilling could commence by the end of the third

quarter this year . A Wyoming -based drill contractor has been secured, and logistical preparations are

underway.

Shirley Basin

The Shirley Basin has produced more than 52 million pounds of U₃O₈ at an average grade of 0.22%

between 1960 and 1992—over three times the current U.S. average. As part of Wyoming, the top uranium-

producing state in the U.S. and an NRC Agreement State, the Basin benefits from a streamlined permitting

environment and longstanding regulatory support for in-situ recovery (ISR) operations.

With ISR now the dominant mining method in Wyoming, Noble Plains’ newly optioned claims offer

exceptional leverage to modern, low-impact development methods. ISR provides lower capital intensity,

minimal surface disturbance, and no tailings, aligning with the Company’s commitment to environmentally

responsible exploration.

1 Updated Initial Assessment Technical Report Summary on Shirley Basin ISR Uranium Project, Carbon County

Wyoming, USA dated March 4, 2024 and prepared by Western Water Consultants, Inc.

2 Ur-Energy Announces Decision to Build Out Shirley Basin Mine: Press Release dated March 13, 2024

On Behalf of the Board of Directors,

“Paul Cowley”, CEO

“Drew Zimmerman”, President

For further information, please contact: Drew Zimmerman: (778) 686-0973

Website: www.nobleplains.com

Bradley Parkes, P .Geo., VP Exploration and Director of Noble Plains Uranium Corp., is the Qualified Person

as defined in National Instrument 43 -101, who has read and approved the technical content of this news

release.

This news release includes certain forward -looking statements as well as management's objectives,

strategies, beliefs and intentions. Forward looking statements are frequently identified by such words as

"may", "will", "plan", "expect", "anticipate", "esti mate", "intend" and similar words referring to future

events and results. Forward -looking statements are based on the current opinions and expectations of

management. All forward -looking information is inherently uncertain and subject to a variety of

assumptions, risks and uncertainties, including the specula tive nature of mineral exploration and

development, fluctuating commodity prices, competitive risks and the availability of financing, as described

in more detail in our recent securities filings available at www.sedar.com. Actual events or results may

differ materially from those projected in the forward -looking statements and we caution against placing

undue reliance thereon. We assume no obligation to revise or update these forward -looking statements

except as required by applicable law.

Neither the TSX Venture Exchange nor its Regulations Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this release.