Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NOB.V ·

Noble Minerals Announces Drilling Results from Noble Minerals- Canada Nickel Joint Venture

Drill Results Mergers & Acquisitions Partnerships & JV

TSX.V: NOB FWB: NB7 OTCQB: NLPXF

Noble Minerals Announces Drilling Results from Noble Minerals-

Canada Nickel Joint Venture

Highlights

• Drill Program completed on the Mann and Reaume Properties, part of the Noble Minerals-Canada

Nickel Joint Venture (ExploreCo)

• Mann Central Property: Drill results include 223 meters of 0.29% nickel including 10 meters of

0.51% nickel

• Mann West Property: Drilling successfully delineated mineralization over a 1,700 meter strike

length and 600 meters width

• First assays from 2024 drilling at Mann West yield excellent results including 330 metres of 0.26%

nickel in MAN24-58 including a total of 24.5 metres of 0.35% nickel; initial resource estimate

expected by Q1 2025

• Multiple gold intervals in Mann North drilling including 4.5 metres of 2.36 g/t gold within 45

metres of 0.45 g/t gold at MAN24-67

• Reaume Property: Drilling indicated an improved nickel grade

Toronto, Ontario – October 31, 2024 – Noble Mineral Exploration Inc. ( “Noble” or the “Company”) (TSX-

V:NOB, FRANKFURT: NB7, OTCQB:NLPXF) is pleased to announce results of a drill program on joint venture

properties (ExploreCo) north of Timmins Ontario (See Canada Nickel Press Release dated October 31, 2024).

ExploreCo, the name of which will be announced in due course, will control 1,989 mining claims totaling

approximately 42,000 hectares and will include nickel properties in Mann, Newmarket, and Reaume

Townships as well as Calder, Galna, McCool, Moody, Mortimer, Stimson, and other properties currently held

by Canada Nickel (see Figure 1, ExploreCo properties shown in purple).

Figure 1 - Regional Map of ExploreCo Properties (purple)

Under the Binding Letter of Intent, the first $5 million of funding for ExploreCo will be provided from existing

funds by Canada Nickel, after which costs will be funded by pro rata ownership basis, which will initially be

80% Canada Nickel and 20% Noble. Canada Nickel and Noble will continue to maintain their existing royalty

rights on the ExploreCo claims, as will previous claim owners who had vended claims to Noble. (see NR July 8,

2024)

Mann Property

The Mann property is located 22 kilometres east of Crawford between Timmins and Cochrane. The Company

has completed a drill program in three of the four identified areas within the property, Mann North, Mann

West (together formerly Mann Northwest), and Central. (Figure 2). Exploration at Mann South is currently

underway. Canada Nickel currently owns 80% of the Mann Property after successfully completing an earlier

earn-in agreement with Noble Mineral Exploration. This property is part of the creation of an 'ExploreCo'

subsidiary with Noble Mineral Exploration (see press release July 8, 2024) with Noble owning the other 20%.

Figure 2 – Mann Property

Mann West

Mann West is approximately 3.5 kilometres long by up to 1.1 kilometres wide (covering 3.4 square kilometres).

The drill program has focused on the southern half of the target with drilling completed over a strike length of

1.7 kilometres and a width of at least 600 metres. All drillholes intersected long sections of well-serpentinized

peridotite and minor dunite with disseminated and visible nickel sulphide mineralization consisting primarily

of pentlandite and heazlewoodite. The Company has drilled 40 holes to date at Mann West (Figure 3), 31 of

which were drilled during the 2024 program. With this drilling, the Company has completed the first phase of

exploration that is required for an initial resource estimate expected by Q1 2025. Assays from nine holes are

presented in this release, with the remaining holes at Mann West still pending.

Table 2 – Mann West drilling highlights.

Hole ID From

(m) To (m) Length

(m)* Ni % Co % Pd g/t Pt g/t Cr % Fe % S %

MANN WEST

MAN24-33 11.2 396.0 384.8 0.24 0.011 0.009 0.008 0.35 6.48 0.028

including 174.0 183.0 9.0 0.30 0.014 0.018 0.011 0.18 6.34 0.100

MAN24-37 8.7 180.0 171.3 0.26 0.011 0.005 0.006 0.15 6.04 0.037

and 236.4 402.0 165.6 0.26 0.012 0.008 0.007 0.24 6.26 0.071

including 267.0 273.0 6.0 0.37 0.013 0.004 0.005 0.30 7.73 0.100

and 361.5 369.0 7.5 0.38 0.013 0.078 0.043 0.18 6.35 0.162

MAN24-45 6.2 402.0 395.8 0.24 0.013 0.016 0.010 0.39 6.60 0.235

including 136.5 144.0 7.5 0.30 0.014 0.044 0.015 0.75 6.99 0.086

MAN24-49 5.4 198.2 192.8 0.19 0.013 0.029 0.017 0.41 7.44 0.081

and 221.6 402.0 180.4 0.21 0.011 0.003 0.006 0.42 6.69 0.033

MAN24-54 49.5 192.8 143.3 0.26 0.011 0.003 0.003 0.13 5.80 0.045

and 216.5 402.0 185.5 0.27 0.012 0.012 0.007 0.28 6.22 0.029

including 268.5 277.5 9.0 0.48 0.019 0.003 0.003 0.62 7.86 0.015

MAN24-58 21.0 351.0 330.0 0.26 0.013 0.015 0.007 0.24 6.51 0.076

including 193.5 204.5 11.0 0.35 0.015 0.023 0.009 0.44 6.86 0.110

and 307.5 321.0 13.5 0.36 0.016 0.040 0.018 0.19 7.17 0.130

MAN24-62 8.6 501.0 492.4 0.18 0.014 0.041 0.026 0.31 7.88 0.047

MAN24-69 7.2 229.5 222.3 0.19 0.013 0.022 0.015 0.38 7.35 0.054

and 264.0 491.0 227.0 0.19 0.013 0.004 0.005 0.41 7.35 0.023

MAN24-71 23.5 260.5 237.0 0.27 0.012 0.011 0.009 0.25 6.29 0.082

including 63.0 108.0 45.0 0.37 0.013 0.036 0.018 0.15 5.77 0.196

and 302.2 501.0 198.8 0.17 0.012 0.014 0.032 0.36 7.56 0.027

*True width undetermined. All lengths are drillhole lengths.

Figure 3 – Mann West

Mann Central

The outline of the ultramafic body at Mann Central is estimated by magnetics to be 4.5 kilometres long and

between 0.5 to 1.0 kilometres wide (or 3.1 square kilometres). Drilling at this target was completed during the

spring/summer of 2024 and now totals 32 drillholes and 11,853 metres. Mineralization is more consistent near

the center of the target over an area of 1.9 kilometres by 600 metres (1.1 square kilometres). This release

provides an update for 13 drillholes (Table 3), all of which intersected varying degrees of mineralized peridotite

with minor pyroxenite dykes.

Mafic volcanics with abundant sulphide mineralization in the north contact were intersected in eight holes

including MAN24-32 which yielded 3.3 metres of 1.03% nickel, 0.31% cobalt, and 0.57 % copper. Assays are

still pending for 10 drillholes and the results from nine drillholes were previously released (see press release

September 10, 2024).

Table 3 – Mann Central drilling highlights.

Hole ID From

(m) To (m) Length

(m)* Ni % Co % Pd g/t Pt g/t Cr % Fe % S %

MAN24-19 3.0 304.0 301.0 0.18 0.012 0.008 0.006 0.42 7.36 0.037

and 384.0 396.8 12.8 0.18 0.010 0.003 0.008 0.33 6.29 0.083

MAN24-22 9.0 552.0 543.0 0.24 0.012 0.005 0.006 0.17 5.90 0.057

Including 195.0 207.0 12.0 0.29 0.013 0.022 0.008 0.14 5.66 0.082

MAN24-26 12.0 55.5 43.0 0.25 0.011 0.003 0.008 0.18 5.85 0.101

and 100.5 399.0 298.5 0.23 0.011 0.004 0.003 0.16 6.22 0.052

MAN24-32 90.0 402.0 312.0 0.21 0.015 0.004 0.004 0.27 6.42 0.121

including 96.0 99.3 3.3 1.03 0.308 0.026 0.013 0.14 19.78 4.840

MAN24-34 75.0 259.0 184.0 0.22 0.011 0.008 0.008 0.31 6.79 0.044

and 297.0 402.0 105.0 0.24 0.011 0.007 0.008 0.22 5.97 0.080

MAN24-35 25.2 144.3 119.1 0.22 0.012 0.003 0.004 0.24 6.74 0.051

and 161.0 387.0 226.0 0.18 0.013 0.005 0.006 0.40 7.39 0.030

MAN24-39 97.5 171.0 73.5 0.19 0.011 0.007 0.007 0.45 7.28 0.049

MAN24-40 103.3 153.0 49.7 0.24 0.012 0.004 0.004 0.26 6.10 0.071

and 141.0 396.0 255.0 0.21 0.012 0.005 0.005 0.41 7.05 0.031

MAN24-43 76.7 182.4 105.7 0.22 0.012 0.005 0.006 0.22 6.37 0.114

and 205.4 402.0 196.6 0.23 0.012 0.003 0.005 0.38 6.56 0.033

MAN24-44 43.0 186.7 143.7 0.21 0.011 0.004 0.004 0.30 6.65 0.029

and 195.0 402.0 207.0 0.19 0.013 0.005 0.007 0.415 7.176 0.030

MAN24-52 11.4 46.7 35.3 0.31 0.037 0.003 0.006 0.169 5.794 0.176

and 73.0 400.0 327.0 0.20 0.013 0.004 0.005 0.390 6.779 0.028

MAN24-56B 45.0 402.0 357.0 0.20 0.013 0.003 0.005 0.411 7.126 0.022

MAN24-60 31.9 241.2 209.3 0.20 0.013 0.007 0.007 0.369 6.920 0.060

and 277.5 310.9 33.4 0.26 0.015 0.003 0.004 0.055 8.981 0.057

*True width undetermined. All lengths are drillhole lengths.

Figure 4 – Mann Central

Mann North

The Mann North target is approximately 1.5 kilometres long by 600 metres wide (0.9 square kilometres)

(Figure 4). Drilling was completed during the summer of 2024 and consisted of a preliminary exploratory phase

of 16 drillholes totaling 6,315 metres. The majority of these holes intersected long sections of peridotite, with

minor dunite (Table 4) with nickel grades in the peridotite consistent with Crawford. The peridotites, however,

have anomalous values of platinum (Pt) and palladium (Pd) over significant intervals, as seen on Table 5. Hole

MAN24-31, for example, intersected 12.7 metres of 0.58 g/t Pt+Pd and MAN24-50 intersected 16.7 metres of

0.50 g/t Pt+Pd.

In addition to the anomalous Pt and Pd, the ultramafic units at Mann also have higher values for gold, especially

near certain contacts. The intersections can be high grade and narrow such as in MAN23-12 which intersected

4.93 g/t gold over 1.5 metres or c an be thicker and lower grade such as in MAN24 -67 which intersected 0.45

g/t gold over 45.0 metres. Nine of 15 of the drillholes at Mann North assayed to date include gold intersections

of 0.4 g/t gold or higher. Significant intersections are summarized in Table 6.

Assays are pending for three remaining holes.

Table 4 – Mann North drilling highlights

Hole ID From

(m) To (m) Length

(m)* Ni % Co % Pd g/t Pt g/t Cr % Fe % S %

MAN24-24 39.0 109.5 70.5 0.15 0.010 0.004 0.003 0.43 6.77 0.061

MAN24-31 28.4 519.0 490.6 0.18 0.012 0.013 0.022 0.38 6.88 0.061

including 57.0 72.0 15.0 0.30 0.014 0.044 0.024 0.28 6.47 0.280

MAN24-36 21.0 408.0 387.0 0.21 0.012 0.012 0.010 0.50 6.93 0.063

MAN24-46 18.8 312.5 293.7 0.17 0.012 0.005 0.007 0.40 7.54 0.028

and 327.9 399.0 71.1 0.17 0.014 0.012 0.008 0.39 8.25 0.057

MAN24-47 18.0 402.0 384 0.18 0.012 0.006 0.008 0.48 7.36 0.035

MAN24-50 21.5 280.6 259.1 0.15 0.012 0.004 0.005 0.45 7.54 0.024

and 313.5 390.0 76.5 0.18 0.013 0.010 0.011 0.41 7.29 0.051

MAN24-51 45.0 171.0 126 0.16 0.013 0.008 0.010 0.44 7.76 0.030

and 196.0 402.0 206 0.16 0.012 0.005 0.005 0.34 7.25 0.032

MAN24-53 15.0 402.0 387 0.11 0.012 0.007 0.010 0.33 8.07 0.032

MAN24-55 17.4 177.8 160.4 0.18 0.013 0.005 0.005 0.53 7.56 0.046

and 352.5 402.0 49.5 0.19 0.012 0.007 0.017 0.36 6.67 0.039