Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NOB.V ·

Lucas Gold Deposit 2018 Winter Drilling Program – Assay Results

Drill Results

2500 – 120 Adelaide St. West, Toronto, OntarioM5H 1T1

Phone: 416-214-2250

Fax: 416-367-1954

TSX.V: NOB FWB: NB7 OTC.PK: NLPXF

PROJECT 81

Lucas Gold Deposit

2018 Winter Drilling Program – Assay Results

Toronto, Ontario – June 27, 2018 - Noble Mineral Exploration Inc. (“Noble” or the "Company") (TSX -V:NOB,

FRANKFURT: NB7, OTC.PK:NLPXF) is pleased to finally announce the Final Assay Results from the 2018 Winter

Diamond Drill Program. Noble completed 15 NQ size diamond drill holes totalling 3,183.93m covering approximately

650m strike length (Figure 1) of the 1700m Gold Mineralized structure/trend id entified from Airborne EM and Mag

Surveys. The entire core length was sawed in half, sampled, and 3,422 half core samples were submitted to Activation

Laboratories (Actlabs) in Timmins for Gold Fire Assay with an Atomic Absorption (AA) finish - (1A2 analytical package)

and 32 element ICP analyses (1E3 analytical package). Au results greater than 5000 ppb were re-assayed for gold with

a Gravimetric Finish (1A3 Analytical Package). Samples greater than 10g/t Au were further analysed by a metallic screen

(coarse gold) analytical method (1A4-500 Analytical Package).

Noble also discovered a total of 37 his torical drillhole collars (Figure 2) during this field program using a CST/Berger

Magna-Trak (MT200) LCD metal locator unit. All drill collars were surveyed using SXBlue II+GPS unit which has an

accuracy of 30-60cm. All drill collars were sealed and flagged for future reference if required.

The main objectives of the 2018 diamond drilling campaign were three fold:

• Firstly, to locate the Au mineralized Tuff+/-Pyrite+/-Chert+/-Quartz unit described in the historical drilling and to

trace it along strike for approximately 65 0m of the 1700m strike length as interpreted from Airborne EM and

MAG Surveys.

• Secondly, to determine the attitude and displacement of this mineralized unit with respect to the extensive

faulting and displacement interpreted from historical drilling and Airborne Geophysic al Surveys. Noble

discovered additional shallow angle sub-horizontal faulting and displacement within this unit, and

• Thirdly, to determine the controls of the gold mineralizing mechanism/events, gold grade, and gold distribution

within the mineralized tuff+/-pyrite+/-chert+/-quartz unit.

In order to realize the above objectives , 9 (nine) diamond drill holes , namely LUC 18-07,08,09,10,&12, and LUC 18-

15,16,17 & 18 were designed to test geology, attitude, faulting, structural displacement and the strike length of the

mineralized tuff+/ -pyrite+/-chert+/-quartz mineralized unit, while 6 (five) diamond drill holes namely LUC 18-

11,13,14,19,20 & 21) were designed to test for gold grades, gold mineralized thicknesses and the structural controls of

the gold mineralizing mechanism/event . In so doing, a number of the historical drill holes were twined specifically

historical drill holes L80-04 with LUC 18-21, L80-13 with LUC18-19 and L81-36 with LUC 18-20 – see Table 1and Figure

3 to Figure 8.

Interpretation:

Noble exploration team has interpreted the Au mineralization within the mineralized tuff+/+pyrite+/ -chert+/-

quartz to occur as discrete “eye shaped lens like openings”, analogous to “rounds” of a ladder stacked within

the mineralized unit. The initial pyrite alteration of the tuff unit made it very brittle and the subsequent extensive

regional ductile deformation and shearing within the general area caused this brittle mineralized tuff unit to

develop multiple “Griffiths Cracks” oblique to the general shearing direction s. These eye shaped lens like

2500 – 120 Adelaide St. West, Toronto, OntarioM5H 1T1

Phone: 416-214-2250

Fax: 416-367-1954

Griffiths Cracks openings were subsequently infilled with gold, pyrite, chert and/or quartz and facilitated the

concentrating of gold within these structural “cracks”. Wider spread gold mineralization and concentration also

occurred within the larger mineralized tuff u nit that were being altered during this contemporaneous

mineralizing event. Drilling for gold grades and gold mineralized intercepts in the Lucas Gold Project is very

sensitive to drill hole dip angle.

Randy S.C. Singh PGeo (ON), PEng (ON) VP- Exploration & Project Development a “qualified person” as such term is

defined by National Instrument 43-101 has verified the data disclosed in this news release, and has otherwise reviewed

and approved the technical information in this news release on behalf of Noble.

Edwin Escarraga MSc PGeo (ON) from Orix Geoscience Inc., was the consulting Project Geologist on the 2018 Lucas

Drilling campaign and was responsible for the logging and sampling of the drill core and all maps, figures and tables

presented in this news release.

FIGURE 1- Plan Map of Noble Minerals 2018 Diamond Drilling

2500 – 120 Adelaide St. West, Toronto, OntarioM5H 1T1

Phone: 416-214-2250

Fax: 416-367-1954

FIGURE 2- Plan Map of Noble Minerals 2018 Diamond Drilling & Historical Drill Collars

2500 – 120 Adelaide St. West, Toronto, OntarioM5H 1T1

Phone: 416-214-2250

Fax: 416-367-1954

TABLE 1

Lucas Gold Project – Summary of Assay Results - 2018 Drill Program

DDH GOLD

(g/t)

Interval

(meters)

From

(meters)

To

(meters) Target

LUC 18-07 0.84 6.50 82.00 88.50 Geology & Structure

Incl. 1.41 3.50 84.00 87.50

LUC 18-08 0.24 4.30 198.20 202.50 Geology & Structure

Incl. 0.45 1.5 200.0 201.5

LUC 18-09 0.24 5.95 218.55 224.50 Geology & Structure

Incl. 0.60 1.7 222.8 224.5

LUC 18-10 No Au Assay

to Report Geology & Structure

LUC 18-11 1.10 30.90 163.00 193.90 Au Mineralization

Incl. 1.20 7.0 177.0 184.0

and 4.33 5.15 188.75 193.90

Incl. 5.37 2.75 188.75 191.5

Incl. 5.64 1.4 192.5 193.9

LUC 18-12 No Au Assays

to Report Geology & Structure

LUC 18-13 1.15 23.30 135.50 158.80 Au Mineralization

Incl. 1.56 2.0 135.5 137.5

Incl. 1.23 2.5 140.0 142.5

Incl. 1.18 3.0 145.0 148.0

Incl. 2.61 2.25 150.75 153.0

Incl. 1.69 4.10 153.5 157.60

2500 – 120 Adelaide St. West, Toronto, OntarioM5H 1T1

Phone: 416-214-2250

Fax: 416-367-1954

TABLE 1 (con’t)

Lucas Gold Project – Summary of Assay Results - 2018 Drill Program

DDH GOLD

(g/t)

Interval

(meters)

From

(meters)

To

(meters) Target

LUC 18-14 1.70 22.60 154.50 177.1 Au Mineralization

Incl. 1.59 1.5 162.00 163.5

Incl. 6.05 2.5 164.5 167.0

Incl. 2.69 3.0 168.5 171.5

Incl. 1.96 4.5 172.0 176.5

LUC 18-15 0.4 6.06 69.0 75.05 Geology & Structure

Incl. 0.50 2.0 71.5 73.5

and 0.42 20.25 217.5 237.75

Incl. 0.63 2.0 217.5 219.5

Incl. 0.49 13.25 224.5 237.75

Incl. 1.40 3.75 234.0 237.75

LUC 18-16 0.44 1.85 186.50 188.35 Geology & Structure

Incl. 1.0 0.55 187.8 188.35

LUC 18-17 0.80 3.55 220.00 223.55 Geology & Structure

Incl. 1.65 1.55 222.0 223.55

LUC 18-18 No Au Assay

to Report Geology & Structure

LUC 18-19 1.27 36.5 101.5 138.0 Au Mineralization

Incl. 1.13 15.5 111.5 127.0

Incl. 4.40 1.5 128.0 129.5

Incl. 2.79 6.3 131.0 137.3

2500 – 120 Adelaide St. West, Toronto, OntarioM5H 1T1

Phone: 416-214-2250

Fax: 416-367-1954

TABLE 1 (con’t)

Lucas Gold Project – Summary of Assay Results - 2018 Drill Program

DDH GOLD

(g/t)

Interval

(meters)

From

(meters)

To

(meters) Target

LUC 18-20 1.42 5.0 57.5 62.5 Au Mineralization

Incl. 2.07 1.5 57.5 59.0

Incl. 1.56 2.0 60.0 62.0

And 3.10 9.0 82.0 91.0

Incl. 4.82 4.6 85.0 91.0

Incl. 7.85 2.3 87.3 89.6

LUC 18-21 1.84 9.5 70.0 79.5 Au Mineralization

Incl. 3.21 3.0 73.0 76.0

Incl. 1.59 3.0 76.5 79.5

And 3.13 3.4 100.6 104.0

Incl. 4.77 1.9 100.6 102.5

And 1.52 28.0 108.0 136.0

Incl. 2.48 9.5 108.0 117.5

Incl. 4.2 3.25 110.25 113.5

Incl. 2.51 2.5 114.0 116.5

And 1.83 8.0 121.0 129.0

Incl. 3.22 3.7 125.3 129.0

And 0.95 6.8 158.0 164.8

Incl. 1.68 2.0 158.0 160.0

Incl. 1.23 1.8 163.5 164.8

2500 – 120 Adelaide St. West, Toronto, OntarioM5H 1T1

Phone: 416-214-2250

Fax: 416-367-1954

FIGURE 3- LUC 18-11 Drill Hole Section and Graphic Log with Au Assays

Drill Section

Graphic Log

2500 – 120 Adelaide St. West, Toronto, OntarioM5H 1T1

Phone: 416-214-2250

Fax: 416-367-1954

FIGURE 4- LUC 18-13 Drill Hole Section and Graphic Log with Au Assays

Drill Section Graphic Log