Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NOAL.V ·

NOA Announces Exploration Progress at Rio Grande With Completion of Fifth Hole Which Intercepted 530m of Lithium Brine-Saturated Units

Corporate Updates

{00726798 v1}

NOA Announces Exploration Progress at Rio Grande With Completion

of Fifth Hole Which Intercepted 530m of Lithium Brine-Saturated Units

February 12, 2024, Buenos Aires, Argentina – NOA Lithium Brines Inc. (TSX-V: NOAL, FSE:

N7N) (“NOA” or the “ Company”) is pleased to provide an update on the significant progress of its

Phase 1 diamond drill program at its Rio Grande project (“Rio Grande” or the “Project”). The fifth

hole, located at the Juana Azul claim within the salar was recently completed to a depth of 602

meters (“m”), and continues to confirm the Project’s high lithium potential.

Preliminary highlights of the fifth hole, RG23-005, include:

• Near-Surface: Lithium brine-saturated geological units were encountered starting at only 1

meter below surface, indicating the Project's vast potential.

• Extensive Brine -Bearing Units: Approximately 530 meters of lithium brine -bearing units

were identified through 53 packer tests, affirming substantial lithium content within the salar.

• Preliminary Lithium Content Confirmation: Initial results confirm lithium content in brine

throughout most of the well's depth, with comprehensive lab geochemical analyses currently

underway.

NOA’s Chief Executive Officer, Gabriel Rubacha states: “In less than a year, NOA’s team has made

great strides in advancing our Rio Grande project. The latest p reliminary results continue to

underscore the extensive potential of our flagship Rio Grande project. This hole completes our initial

drilling campaign on-time and in-line with our planned aggressive drill program. The Company is on

schedule to release its maiden resource later this quarter , which represents a significant catalyst

towards unlocking value for our shareholders”.

Hole R G23-005 was executed with diamond drilling (HQ -size), permitting the extraction of core

samples of the salar basin formations and collection of brine samples, where available. Drilling was

carried out by Salta-based Hidrotec S.A., under the supervision of NOA’s geologists.

Diamond drill hole RG23-005 was completed at a depth of 602 meters. At a depth of 1 meter, the

formations saturated with brine began. The lithology of the well is composed mainly by sand with

sulfate intercalations and a lower proportion of crystalline halite, with contents that are variable along

the depth of the well. Packer test sampling was carried out and almost the entire depth of the +600

m well returned brine -saturated units (approximately 530 m of the 602 m drilled), except for one

horizon ranging 40 m in thickness.

NEWS RELEASE

{00726798 v1}

Brine packer samples have been sent for laboratory analyses, including multi-element geochemical

analysis for lithium and other relevant elements , and results are expected in the coming weeks.

Selected drill core samples were sent to an accredited laboratory for physical property tests,

including drainable porosity.

Next Steps:

• Laboratory Analysis: Brine packer samples have been sent for multi-element geochemical

analysis, focusing on lithium and other pertinent elements, with results expected in the

coming weeks.

• Physical Property Tests: Selected drill core samples are undergoing accredited laboratory

tests, including drainable porosity assessments.

• Maiden Mineral Resource Estimate : With the completion of our five-hole Phase 1 drill

program, the Company is now working on its maiden Mineral Resource Estimate for the Rio

Grande project scheduled for Q1/2024.

The location of RG23-005 is shown in Figure 1 and its drill collar information is provided in Table 1

below.

Figure 1: Plan Map Showing Well RG23-005 and Previous Completed Wells

{00726798 v1}

Table 1: RG23-005 - Drill collar information

Hole #: RG23-004 Azimuth: 0 deg.

Claim name: Juana Azul Inclination: -90 deg.

Coordinates (UTM

19J South):

E: 588494 m

N: 7233176 m,

Z: 3669 m

Contractor: Hidrotec S.A.

Machine type: HT07 LF-90

Drill type: Diamond

Hole diameter: HQ

Figure 2: Photo of Hole RG23-005

About NOA Lithium Brines Inc.

NOA is a lithium exploration and development company formed to acquire assets with significant

resource potential. All NOA’s projects are located in the heart of the prolific Lithium Triangle, in the

mining-friendly province of Salta, Argentina, near a multitude of projects and operations owned by

some of the largest players in the lithium industry. NOA has rapidly consolidated one of the largest

lithium brine claim portfolios in this region that is not owned by a producing company, with key

positions on three prospective salars, being Rio Grande, Arizaro, Salinas Grandes, and totalling over

140,000 hectares.

On Behalf of the Board of Directors,

Gabriel Rubacha

Chief Executive Officer and Director

{00726798 v1}

For Further Information On The Company

Website: www.noalithium.com

Email: [email protected]

Telephone: +54-9-11-5060-4709

Alternative Telephone: +1-403-571-8013

Sample Analysis & QA/QC Program

The Company has a robust QA/QC and sample management program. Brine samples were collected

by a single / double packer system (in-hole inflatable) to isolate specific intervals down the drillhole.

The packer sampling method allows the collection of brine samples at specific depths while sealing

the hole at the top and bottom of the interval. The packer system was run several times to flush the

hole after drilling to clear / clean the hole prior to sampling and four samples for each interval were

collected (main sample, duplicate sample, check sample, reserve sample). The drillhole of the

current release was inclined vertically (90 degrees) and the salar strata are believed to be flat-lying

resulting in reported intervals approximating true thickness.

Samples of brine were submitted by courier for analysis to Alex Stewart NOA, subsidiary of Alex

Stewart International Argentina, member of the Alex Stewart International group, an accredited

laboratory for the analysis of lithium and other elements. Alex Stewart employed Inductively Coupled

Plasma Optical Emission Spectrometry as the analytical technique for the primary constituents of

interest, including: boron, calcium, potassium, lithium, and magnesium. Measurements in the field

included pH, conductivity , temperature and density. The quality of sample analytical results was

controlled and assessed with a protocol of blank, duplicate and standard samples included within

the sample sequence. Differences between original and duplicate samples and results for standards

and blanks are considered within the acceptable range for lithium.

Qualified Person

David O’Connor P.Geo., is the Qualified Person as defined by National Instrument 43 -101 –

Standards of Disclosure for Mineral Projects, and he has reviewed and approved the scientific and

technical information in this news release.

Cautionary Note Regarding Forward-Looking Statements

This news release may include forward -looking statements that are subject to inherent risks and uncertainties. All

statements within this news release, other than statements of historical fact, are to be considered forward looking

statements. Forward -looking statements including, but not limited to NOA’s future plans and objectives regarding its

projects, which constitute forward looking information that involve various risks and uncertainties. Although NOA believes

the expectations expressed in such forward -looking statements are based on reasonable assumptions, such statements

are not guarantees of future performance and actual results or developments may differ materially from those described in

forward-looking statements. Factors that could cause actual results to differ materially from those described in forward -

looking statements include fluctuations in market prices, including metal prices, continued availability of capital and

financing, and general e conomic, market or business conditions. There can be no assurances that such statements will

prove accurate and, therefore, readers are advised to rely on their own evaluation of such uncertainties. NOA does not

assume any obligation to update any forward-looking statements except as required under applicable laws.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.